flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Prescient receives ICC certification for seismic resilience system

Codes and Standards

Prescient receives ICC certification for seismic resilience system

Technology suitable for buildings up to 12 stories in earthquake-prone areas.


By Peter Fabris, Contributing Editor | March 10, 2020

Courtesy Pixabay

Prescient, a digital design-build company focused on modular multi-unit housing, has received certification from the International Code Council Evaluation Service (ICC-ES) for its Prescient Seismic System.

“With this certification, Prescient is now able to provide its unique, economical and environmentally friendly solution to developers building in U.S. seismic zones,” according to a Prescient news release. The technology is suitable for buildings up to 12 stories in earthquake-prone areas around the world.

More than 950 physical tests and over 80,000 analytical simulations of response to earthquake ground shaking were performed. “The work demonstrated that the PSS is able to meet the high performance standards for protecting life demanded by the most modern building codes,” the release says.

“With more than 30,000 engineering hours invested, this new Prescient Seismic System expands upon the fundamentals of our standard Unified Truss Configuration System (UTCS) to yield a more economical and faster building solution that can withstand high seismic forces,” said Magued Eldaief, CEO, Prescient. “The ability to now design buildings up to 160 feet high, or 12 stories above 4 stories of podium in seismic locations, is an incredible opportunity for us and one that will no doubt open doors to many future projects.”

Related Stories

| Feb 17, 2012

AGC advocates for federal procurement reform

Ensure that small business goals take into consideration actual small business capacity in relevant specialty markets.

| Feb 17, 2012

Codes not to blame for Anchorage roof collapses following heavy snows

Design or construction problems likely contributed to the collapses, according to city officials.

| Feb 17, 2012

Comment period opens March 1 for LEED 2012 update

USGBC says that LEED's strength comes from its continuous evolution.

| Feb 17, 2012

OSHA training videos on proper respirator use available online

17 short videos to help workers learn about the proper use of respirators on the job.

| Feb 17, 2012

Union/employer collaboration on the rise aimed at exceeding OSHA safety standards

Unions have learned to help employers win contracts with bids made competitive through good safety practices.

| Feb 16, 2012

Gain greater agility and profitability with ArchiCAD BIM software

White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.

| Feb 9, 2012

Initiative to sell off under-used federal property gaining momentum

The bill is similar to a White House planto cut $8 billion worth of building costs by the end of the 2012 fiscal year, and to establish a panel to identify other sites worth selling or donating to nonprofits or state and local governments.

| Feb 9, 2012

Computer tool helps engineers design roof cladding using Canada's building code

Easier to design roof cladding that can withstand winds in a given area. 

| Feb 9, 2012

Webinar focuses on lessons learned from LEED-certified industrial project

This case study will focus on strategies used to save the client money, achieve certification, and effectively market success once the project was complete.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021