Curtain wall systems are designed to protect the interior of a commercial building from the often harsh exterior environment. A curtain wall failure can be easy to resolve or lead to a lengthy and expensive remediation process.
In many cases, curtain wall failures are caused by fairly simple errors that occur during the fabrication and installation process. These are errors that could easily be prevented by a wider awareness of how curtain walls perform and how to install them so they can perform as intended.
All stakeholders in a commercial curtain wall project should have a high level understanding of the few errors that cause the majority of in-field failures.
This presentation will highlight these errors so that all stakeholders will have a better understanding of what they should be looking for to ensure a safe and successful curtain wall application.
Take this free BD+C University course
Related Stories
| Jan 2, 2013
M&A activity at U.S. AEC firms up slightly
Total mergers and acquisitions in the AEC industry hit 171 in 2012, up slight from the 169 deals in 2011.
| Jan 2, 2013
Global data center market to ‘slow’ to 14.3% this year
Total global investment in data centers is expected to slow down somewhat this year but still increase at a respectable 14.3%, according to DCD Intelligence.
| Jan 2, 2013
Construction jobs made gains in 2012, even with a slow Q4, says Gilbane report
The construction sector in the nine states with 50% of construction employment was up 169,000 jobs from February to September 2012, following a lost of 137,000 jobs from September 2011 to January 2012.
| Dec 21, 2012
ABI gains for fourth straight month
Positive business conditions for all building sectors.
| Dec 17, 2012
CSM Group names recipient of the CSM Architect Fellowship Grant
With the money from the grant, Harlow has chosen to use it entirely for the Chapter of American Institute of Architecture Student’s Freedom by Design Program at Andrews University.
| Dec 9, 2012
AIA: Laboratory design, building for breakthrough science
To earn 1.0 AIA/CES learning units, study the article carefully and take the exam.
| Dec 9, 2012
The owner’s perspective: high-rise buildings
Douglas Durst on the practicalities of development: “You must think about a building from the inside out.”
| Dec 9, 2012
Greenzone pop quiz
Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.