TWO NEW PV SYSTEMS OFFER NON-PENETRATING INSTALLATION
Two new PV systems are available: 1) a rigid glass-based polycrystalline silicon module that can be installed on standing seam metal roofs using a non-penetrating clamp, and 2) a flexible, thin film module that can be adhered to the metal roof panel in a factory environment, allowing the PV array and roof panels to be installed simultaneously. These PV systems can be installed on existing and new metal roofs because they don’t penetrate the substrate. Furthermore, a metal roof likely will outlive the solar equipment, saving removal and replacement costs associated with other roof materials.
LIGHT SHELF ALLOWS FOR EASY CLEANING
The InLighten light shelf features an extruded-aluminum chassis system in several panel choices. It comes in depths of up to 30 inches of reflective surface. InLighten light shelf’s new design incorporates a unique mounting bracket that allows the panel to be tilted for cleaning, an important maintenance factor in schools, daycare centers, offices, and other commercial and institutional applications. The light shelf can be attached to multiple curtain wall systems and storefront framing systems for application in new construction and retrofits.
NEW COMBINATION FIRE ALARM/ECS MEETS NFPA, UL, DOD STANDARDS
The Farenhyt Emergency Communication System (ECS) provides fire alarm technology and mass notification capabilities in an all-in-one system. This real-time communications system meets the latest NFPA 72, UL 2572, and Department of Defense standards and runs on most wire-types, making it an effective retrofit option. As many as seven ECS-RCUs (“remote command units”) can tie into a facility’s Farenhyt ECS system to provide live paging in specific areas of a property. BD+C
Related Stories
| Aug 11, 2010
PBK, DLR Group among nation's largest K-12 school design firms, according to BD+C's Giants 300 report
A ranking of the Top 75 K-12 School Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Turner Building Cost Index dips nearly 4% in second quarter 2009
Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.
| Aug 11, 2010
AGC unveils comprehensive plan to revive the construction industry
The Associated General Contractors of America unveiled a new plan today designed to revive the nation’s construction industry. The plan, “Build Now for the Future: A Blueprint for Economic Growth,” is designed to reverse predictions that construction activity will continue to shrink through 2010, crippling broader economic growth.
| Aug 11, 2010
New AIA report on embassies: integrate security and design excellence
The American Institute of Architects (AIA) released a new report to help the State Department design and build 21st Century embassies.
| Aug 11, 2010
Section Eight Design wins 2009 Open Architecture Challenge for classroom design
Victor, Idaho-based Section Eight Design beat out seven other finalists to win the 2009 Open Architecture Challenge: Classroom, spearheaded by the Open Architecture Network. Section Eight partnered with Teton Valley Community School (TVCS) in Victor to design the classroom of the future. Currently based out of a remodeled house, students at Teton Valley Community School are now one step closer to getting a real classroom.