At $26,783 median family income, Camden, N.J., ranks just behind Reading, Pa., and Flint, Mich., in poverty level among U.S. cities of 65,000 or more. Lying just across the Delaware River from Philadelphia, the city of 74,420, home of Campbell’s Soup Company, has been battling economic decline for decades.
Civic leaders are crossing their fingers that the new Rutgers University–Camden: Nursing and Science Building will revivify the downtown. Located on a long-vacant triangle between City Hall, Roosevelt Plaza Park, and the River Line light rail that links to Trenton, the 101,000-sf nursing school adds to the “eds and meds” anchor institutions that provide 45% of the city’s jobs.
Designed by Perkins Eastman (with architect of record NELSON Architects), the $62.5 million angular structure involved the city, Rutgers University–Camden, Cooper University Hospital, and Cooper Medical School of Rowan University among its stakeholders.
Primary interior circulation parallels the city grid and is repeated on all four levels. Sarah Mechling/Perkins Eastman.
The Building Team Awards jury was most impressed with the project team’s handling of the triangular site, whose awkward geometry posed difficulties for placing labs, simulation spaces, and classrooms. To accommodate an orthogonal spatial program inside a non-orthogonal building envelope, the designers organized the more flexible collaborative and social program elements along the building’s diagonal. This opened up the interior for teaching spaces while lending spatial dynamism to the building’s public spaces.
The nursing school’s remoteness from the main campus—a three- or four-block walk—meant that the students would likely spend nearly all their time in this one facility. This restriction demanded the crafting of an interior environment that could satisfy the many needs of the students—learning, socializing, collaborating, and studying—over a four-year period.
The designers created four unique two-story common areas for dining, individual activity, social interaction, and formal gatherings. The four spaces are knit together by a network of smaller social and study environments along the Student Street side of the building. Taken together, the collection of varied interior environments creates a campus within a single building.
One of four two-story common areas for dining, social interaction, and formal events. Sarah Mechling/Perkins Eastman.
In the midst of construction, the university requested a redesign of the 300-seat lecture hall to accommodate new AV/IT technology that would link Camden with two similar spaces at Rutgers’s campuses in New Brunswick and Newark—all part of an advanced distance learning initiative by the state university system. The design team, contractor Hunter Roberts Construction Group, city officials, and the AV/IT vendors worked to make it happen without undue disruption to the construction schedule.
Built to LEED Silver standards, the four-story building is heated and cooled via a radiant floor system. Other green features: chilled beams, low pressure drop air-handling systems, high-efficiency chillers, LED lighting, and low-flow plumbing.
The new Nursing and Science Building was the first new construction since the merger of Rutgers University and the University of Medicine and Dentistry of New Jersey, in 2013. The hope is that it will lead to a rebranding of Camden as a center of excellence for education and health.
Campus plan shows the triangular site's distance from main campus.
Building Team — Submitting firm, architect, interior architect Perkins Eastman Owner Rutgers University–Camden Architect of record NELSON Architects SE O’Donnell & Naccarato CE Langan Engineering MEP Vanderweil Roofing consultant Roof Maintenance Systems Façade consultant Atelier 10 GC Hunter Roberts Construction Group CM Greyhawk
General information – Size 101,000 gsf Cost $62.5 million Construction time July 2015 to November 2017 Delivery method Design-bid-build
Return to the 2018 Building Team Awards Landing Page
Related Stories
Building Team Awards | Jun 24, 2019
14 projects earn BD+C's 2019 Building Team Awards
The McDonald's Headquarters, the Rancho Los Amigos National Rehabilitation Center, and Pacific Visions at the Aquarium of the Pacific are three of the projects awarded with BD+C's 2019 Building Team Awards.
Building Team Awards | Jun 21, 2019
Up, up and away: Dutch hospitality chain completes the world's tallest modular hotel
Honorable mention: At 21 stories (15 of them modular), it is the world’s tallest modular hotel.
Building Team Awards | Jun 20, 2019
PPP gets the job done: Three-party deal saves time and money for client
Bronze Award: Weitz, acting as developer and design-builder, leased the land and borrowed the money for the project.
Building Team Awards | Jun 20, 2019
Making waves: The façade of Pacific Visions suggests the movement of water, day and night
Bronze Award: The new wing holds an exhibition space, a state-of-the-art 300-seat theater with a 32-foot-tall, 180-degree arc, 130-foot-long projection wall.
Building Team Awards | Jun 19, 2019
Unsung heroes: Two hurricanes couldn't stop this project team
Bronze Award: St. Lucie County’s population exploded to the point where the hospital needed lots more space.
Building Team Awards | Jun 19, 2019
Crime fighter: San Diego County's new forensic facility helps battle crime in three ways
Silver Award: The 158,000-sf addition collocates three crime-fighting functions.
Building Team Awards | Jun 18, 2019
All that urban jazz: Mixed-use center lends a zing to downtown Washington's skyline
Bureaucratic architecture, be damned!
Building Team Awards | Jun 18, 2019
Eyesore no more: People come together to expand a much-needed daycare center
Silver Award: Two problems quickly emerged: high concentrations of arsenic in the soil, and stormwater runoff into nearby wetlands and neighboring properties.
Building Team Awards | Jun 17, 2019
Campus renewal: Community effort saves a crucial healthcare resource
Silver Award: Taylor Design (architect) and SmithGroup (AOR) led an integrated design-build team anchored by McCarthy Building Companies (GC).
Building Team Awards | Jun 13, 2019
In the spotlight: Kinder High School for the Performing and Visual Arts shines a new beacon on Houston’s downtown
Gold Award: Kinder High School, which can accommodate 750 9th through 12th graders, is one of only three public schools in the U.S. that offer programs for both visual and performing arts.