flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Proposed change to IECC process irks efficiency advocates

Codes and Standards

Proposed change to IECC process irks efficiency advocates

New procedure would diminish influence of local code officials.


By Peter Fabris, Contributing Editor | January 13, 2021

Courtesy Pixabay

The International Code Council’s (ICC’s) plan to alter how it develops the International Energy Conservation Code (IECC) has raised the ire of those pushing for more stringent efficiency measures.

The council has proposed rules changes that would make the code-making process less open, with development done by a committee without input from local government building officials, according to published reports. According to Mike Collignon, executive director and co-founder of the Green Builder Coalition, local officials were not informed of the possibility that their voice in future code development “might be stripped from them,” when the ICC recently proposed the changes.

The changes were proposed after ICC representatives from the National Association of Homebuilders (NAHB) objected to some efficiency measures during deliberations over the latest version on the IECC. NAHB’s appeals led to stripping out provisions to require that new homes go all-electric and be EV-ready—provisions supported by the majority of IECC voters.

The ICC is seeking members’ and stakeholders’ feedback on the proposed code development reforms through Jan. 11. The IECC is in use or has been adopted by 47 states.

Related Stories

| Jul 19, 2012

NRCA: Roofing insulation performance, local climate keys to computing R-value

To minimize the loss of thermal resistance in design, the R-value of roof insulation should be computed based on the actual performance of the insulation material and the local climate, says the National Roofing Contractors Association.

| Jul 16, 2012

Business school goes for maximum vision, transparency, and safety with fire rated glass

Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.

| Jul 12, 2012

Federal budget chief to explain impact of pending defense cuts before Congress

Office of Management and Budget Director Jeffrey Zients is scheduled to testify before the House Armed Services Committee Aug. 1 to explain the possible effects of $500 billion in defense cuts on U.S. companies, including those in the design and construction industry.

| Jul 12, 2012

Pennsylvania legislature moves to prevent undocumented workers on public construction projects

Legislation to prevent undocumented workers from being hired by construction companies working on state-funded projects passed the Pennsylvania Legislature.

| Jul 12, 2012

New York’s One Bryant Park Bank of America tower is first new high-rise to achieve LEED Platinum

The new One Bryant Park Bank of America tower in midtown Manhattan is the first new commercial high-rise to achieve LEED Platinum certification.

| Jul 12, 2012

OSHA launches campaign to prevent heat illness

The Occupational Safety and Health Administration has launched its 2012 Heat Illness Prevention Campaign to educate employees and their employers about the hazards of working outdoors in heat, and how to prevent heat-related illnesses.

| Jul 12, 2012

Contractors have increasing concerns over new federal hiring quotas

A proposed rule by the U.S. Department of Labor's Office of Federal Contract Compliance Programs to increase disabled- and veteran-worker hiring quotas for federal contractors continues to raise deep concerns among contractors.

| Jul 5, 2012

Veterans Administration threatens to pull contract on new Orlando medical center

The Veterans Administration asked contractor Brasfield & Gorrie to get more workers on the job and figure out a way to get the job done faster, or the VA would pull the contract on the much-delayed Orlando VA Medical Center.

| Jul 5, 2012

Cost to contractors for new federal hiring quotas much higher than estimated, AGC says

Administration officials significantly underestimated the cost to construction employers of proposed new hiring quotas for federal contractors, according to analysis by the Associated General Contractors of America.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021