flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Proposed change in Michigan’s building code would hurt innovation, say critics

Proposed change in Michigan’s building code would hurt innovation, say critics

Legislation pending before the Michigan Senate would change the law that calls for building codes to be updated every three years to require an update only every six years.


May 31, 2012

Legislation pending before the Michigan Senate would change the law that calls for building codes to be updated every three years to require an update only every six years. Critics charge that new innovations that make buildings safer, increase energy efficiency, and provide for new ways to reduce storm damage would be delayed.

For more information, click here. +

Related Stories

Codes and Standards | Mar 6, 2020

Design firms creating plans to re-imagine D.C.’s tidal basin

Area including National Mall is facing increased flood risk.

Codes and Standards | Feb 28, 2020

Bay Area communities struggle with what to do about rising sea level

Policies include sea walls, levies, and relocation.

Codes and Standards | Feb 27, 2020

Cell phones present a safety hazard at job sites

Use of ear buds, headphones banned by some contractors.

Codes and Standards | Feb 26, 2020

American Concrete Institute releases 2020 codes, specifications, and practices

ACI Collection features guidance on structural concrete construction and rehabilitation.

Codes and Standards | Feb 25, 2020

New ISO standard for optimizing building use and reusing and recycling components released

Aim is to realize full potential value of a building throughout its life cycle.

Codes and Standards | Feb 20, 2020

City-owned buildings to go carbon-free in Los Angeles

Mayor commits to goal for new and extensively renovated structures.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021