flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Proposed federal rules would create more stringent healthcare facility safety rules

Proposed federal rules would create more stringent healthcare facility safety rules

Sprinklers to be required throughout high rise structures


By BD+C Staff | September 2, 2014
Photo: digidreamgrafix via FreeDigitalPhotos.net
Photo: digidreamgrafix via FreeDigitalPhotos.net

The Centers for Medicare & Medicaid Services (CMS), an agency of the U.S. Department of Health and Human Services, published proposed rules this spring that would amend the fire safety standards for hospitals, long-term care facilities, ambulatory surgery centers, hospice inpatient, and many other healthcare facilities that participate in Medicare and Medicaid programs.

CMS proposed adopting the 2012 editions of the Life Safety Code, which includes measures devised by the National Fire Protection Association, and includes the Healthcare Facilities Code. A key change is a requirement that buildings over 75 feet tall have sprinkler systems throughout the structure. Existing buildings would have 12 years to install them.

Automatic sprinkler systems will be required in all habitable areas, closets, roofed porches, balconies, and decks of new residential health care facilities. CMS also strongly encouraged existing facilities to be sprinklered in all habitable areas. Under the new provisions, sprinklers also must be installed in attics of new and existing residential facilities if the attic is used for living purposes, storage, or the housing of fuel-fired equipment. Or, it must have a heat detection system, be of noncombustible construction, or be constructed of fire retardant treated-wood.

Newly-constructed facilities would have to install approved smoke alarms inside every sleeping room, outside every sleeping area, and on all levels within a residential unit. CMS is soliciting public comment regarding whether that requirement should be applied to existing facilities, as well.

(http://www.jdsupra.com/legalnews/new-federal-health-care-facility-regulat-93481/)

Related Stories

Codes and Standards | Sep 22, 2020

Air cleaners, chemical and UV treatments among tools to safeguard indoor air amid pandemic

Strategies augment social distancing, increased air flow to combat COVID-19 spread.

Codes and Standards | Sep 21, 2020

No ease of lumber price spikes in sight

Wildfires strike Northwest timber industry in wake of Covid-19 shutdowns.

Codes and Standards | Sep 17, 2020

Spate of energy code appeals could hamper efficiency progress

Construction and fossil fuel interests oppose portions of latest model energy code.

Codes and Standards | Sep 16, 2020

Heat pumps are the future for hot water

Sustainability policies will drive trend.

Codes and Standards | Sep 15, 2020

Taller timber buildings approved in National Fire Protection Association code

Ensures compatibility with the International Building Code.

Codes and Standards | Sep 14, 2020

Relocation of neighborhoods, the next step in U.S. flood strategy, is underway

Repeated rebuilding after successive floods now seen as bad policy.

Codes and Standards | Sep 10, 2020

Fannie Mae programs provide incentives for multifamily solar

Affordable housing projects can find PV installations to be cost-effective.

Codes and Standards | Sep 9, 2020

Corporate pledges accelerate net-zero building movement

World Green Building Council drives goal of net-zero carbon emissions by 2050.

Codes and Standards | Sep 8, 2020

Study will examine elevator airflow amid COVID-19 pandemic

Researchers to investigate risk of airborne transmission.

Codes and Standards | Sep 4, 2020

Updated selection, application guide for plastic glazed skylights, sloped glazing released

Part of suite of skylight documents by Fenestration and Glazing Industry Alliance.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021