flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Purpose-built facility for University of South Florida’s Judy Genshaft Honors College breaks ground

University Buildings

Purpose-built facility for University of South Florida’s Judy Genshaft Honors College breaks ground

Morphosis designed the project.


By David Malone, Associate Editor | February 9, 2021
Judy Genshaft Honors College exterior

Images courtesy Morphosis

Located on the University of South Florida’s (USF) Tampa campus, a new purpose-built facility for the Judy Genshaft Honors College has broken ground.

The five-story, 85,000-sf building will provide a new home for the Honors Program by providing flexible spaces that foster and enhance interdisciplinary exchange between students, faculty, staff, and the broader USF community.

Highly visible from USF’s central campus and accessible via multiple entry points, the new building’s design emphasizes spaces that promote community engagement, collaboration, and creativity. A centrally located atrium anchors the building. The atrium connects all user into a single spatial experience and is lined with learning lofts that encourage interaction and collaboration.

 

Judy Genshaft Honors College atrium

 

Flexible spaces adjacent to the atrium on the ground floor can be opened and combined to accommodate large-scale events. The second floor features an exterior, shaded terrace that is accessible from the inside and outside of the building and serves as an outdoor study and meeting space. 

The lower-form of the five-story building promotes greater pedestrian activity, which in turn increases the frequency of casual encounters and informal meetings critical for interdisciplinary collaboration.

 

Judy Genshaft Honors College north facade

 

The building also includes classrooms, labs, study areas, offices, and a publicly accessible cafe. The new, purpose-built facility will not only provide the Honors College with a free-standing building tailored to its program and strategically woven into USF’s campus, but will also allow it to accommodate an additional 600 students, bringing its total number of students to 3,000. 

Construction on the facility is slated for completion in late fall 2022.

Related Stories

Giants 400 | Aug 13, 2019

2019 Science + Technology Giants Report: Operational flexibility is a must for S+T buildings

The science and technology (S+T) sector is arguably the industry’s most complex because it caters to a diverse clientele with specific priorities and imperatives, according to Building Design+Construction's 2019 Giants 300 Report.

University Buildings | Aug 8, 2019

New Student Wellness Center at the University of Chicago begins construction

Wight & Company is providing design-build services for the project.

University Buildings | Jul 10, 2019

Campus costs: Square foot construction prices for student unions

Using RSMeans data from Gordian, here are the most recent costs per square foot of college student unions in 10 college cities across the U.S. 

University Buildings | Jul 3, 2019

Duke’s new Chinese campus sits atop a manmade lake

Gensler and LandDesign designed the project.

University Buildings | Jul 2, 2019

New Biomedical Research Center Facility at Northwestern University

Designed by Perkins+Will, the Louis A. Simpson and Kimberly K. Querrey Biomedical Research Center has spaces aiding medical discovery.

Contractors | Jun 15, 2019

Turner tops off new classroom space at Middle Tennessee State University

The building includes a “command center” for training students to interact with emergency personnel.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021