Like a giant arrow pointing toward downtown Chicago, the top bar of the Zurich North America Headquarters building cantilevers 60 feet to the east and rests atop two other bars. Not only is this stacked, three-bar design striking to look at, it also provides occupants with unique collaboration spaces, open views of the surrounding landscape, and programmatic flexibility that typical center-core buildings cannot offer.
The top bar is 500 feet long and spans 180 feet between the bottom two bars, which each rise five stories.
Sustainability played a key role in the development of the headquarters building, which is the largest building of its kind to reach LEED Platinum certification. When compared to similar buildings, the structure saved 62% in energy costs and 39% in domestic water use. The façade includes exterior shading and interior automated shades with daylight sensors. A double wall mitigates the interior/exterior temperature difference. Floor-to-ceiling glass provides natural light to the shallow office plates. Design-builder Clayco also diverted 99% of construction and demolition waste from landfills.
The complex’s 3,000 employees can enjoy a fitness center, cafeteria, conference center, and outdoor terraces that are all connected via walking trails through the fully landscaped estate.
The Building Team received more than 1,300 responses from employee surveys that were used to create a truly collaborative environment.
James Steinkamp Photography.
Building Team – Submitting firm, design-builder Clayco, Inc. Owner Zurich North America Developer CRG Real Estate Solutions Architect Goettsch Partners Interior architect CannonDesign Structural engineer Halvorson and Partners, Desman Inc. Mechanical engineer Icon Mechanical
General Information – Size 783,000 sf Cost $400 million Construction time June 2014 to September 2016 Delivery method Design-build
Related Stories
Building Team Awards | May 22, 2018
LA's game changer: Wilshire Grand Center
Silver Award: This billion-dollar mixed-use tower will alter the Los Angeles skyline in more ways.
Building Team Awards | May 21, 2018
Campus builder: Everett University Center at Washington State University
Silver Award: WSU kicks off its new branch campus with a high-tech innovation center designed to engage students, businesses, and the community.
Building Team Awards | May 21, 2018
Promise fulfilled: Park West, Texas A&M University
Silver Award: A P3-driven team completes this mega off-campus student housing complex ahead of its fast-track schedule.
Building Team Awards | May 18, 2018
Prognosis: Positive: Rutgers University-Camden Nursing and Science Building
Gold Award: Can a new nursing school breathe life into America’s third-poorest city?
Building Team Awards | May 17, 2018
Patient priorities: Cleveland Clinic Taussig Cancer Center
Gold Award: Cleveland Clinic’s new cancer center is a transparent, collaborative hub for improved patient experiences and enhanced communication with caregivers.
Building Team Awards | May 16, 2018
Game, set, match: United States Tennis Association National Campus
Gold Award: With 100 courts and more than 260,000 sf of vertical construction, the USTA National Campus is a sanctuary for tennis enthusiasts.
Building Team Awards | May 15, 2018
High court, big impact: San Diego Central Courthouse
Gold Award: San Diego’s high-rise courthouse increases access to justice for citizens by consolidating 71 court departments.
Building Team Awards | May 14, 2018
Sweat equity marks landscaping effort
The design was grounded in therapeutic landscape and environmental psychology theory.
Building Team Awards | May 14, 2018
Rethinking prison design: Iowa Correctional Institution for Women
Platinum Award: Iowa's new women's correctional institution offers a revolutionary model for rehabilitating female inmates.
Building Team Awards | May 14, 2018
Dream delivered: McCormick Square Marriott Marquis and Wintrust Arena
Platinum Award: A daring hotel and sports development in Chicago’s South Loop aims to invigorate the city’s convention business.