flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ranked: Top Veterans Administration sector AEC firms [2014 Giants 300 Report]

Ranked: Top Veterans Administration sector AEC firms [2014 Giants 300 Report]

CannonDesign, Clark Group, and URS top BD+C's rankings of the nation's largest Veterans Administration building sector design and construction firms.


By BD+C Staff | September 14, 2014
Tampa VA Hospital. Photo: courtesy VA
Tampa VA Hospital. Photo: courtesy VA

 

 

 

 

 

 

 

 

 

 

 

Top Veterans Administration Sector Architecture Firms

Rank Company 2013 Veterans Administration Building Revenue
1 CannonDesign $15,000,000
2 Leo A Daly $12,896,157
3 HDR $8,459,200
4 NBBJ $6,464,000
5 Westlake Reed Leskosky $6,325,000
6 Hoefer Wysocki Architecture $6,010,000
7 HOK $5,728,056
8 ZGF Architects $3,565,855
9 Array Architects $2,138,000
10 Hammel, Green and Abrahamson $1,565,733
11 Perkins Eastman $1,540,000
12 Polytech Associates  $1,500,000
13 H+L Architecture $1,295,496
14 Page $1,182,000
15 HMC Architects $1,117,716
16 EwingCole $1,000,000
17 Sherlock, Smith & Adams $932,000
18 Heery International $931,666
19 Epstein $841,000
20 Morris Architects $650,000
21 Perkins+will $595,451
22 Taylor Design $372,052
23 Anderson Mikos Architects $350,000
24 Payette $318,779
25 Cuningham Group Architecture $290,426
26 RBB Architects $215,897
27 Clark Nexsen $200,156
28 LBL Architects $200,000
29 Legat Architects $191,800
30 Emersion Design $127,032
31 FreemanWhite $107,667
32 RSP Architects $74,000
33 NAC|Architecture $69,546
34 Flad Architects $64,840
35 BSA LifeStructures $41,019
36 CTA Architects Engineers $15,948
37 Integrus Architecture $11,473
38 TEG Architects $4,046
39 Bergmann Associates $1,800

 

 

 

Top Veterans Administration Sector Engineering Firms

Rank Company 2013 Veterans Administration Building Revenue
1 URS Corp. $5,737,392
2 Jacobs $5,057,640
3 Heapy Engineering $4,118,394
4 Apogee Consulting Group $2,080,275
5 Degenkolb Engineers $1,974,556
6 Interface Engineering $1,892,305
7 Ross & Baruzzini $1,694,572
8 Parsons Brinckerhoff $1,602,180
9 TTG $1,265,000
10 SSOE Group $1,199,568
11 H.F. Lenz $985,000
12 KJWW Engineering Consultants $953,450
13 Shive-Hattery $937,178
14 BR+A Consulting Engineers $920,000
15 Bridgers & Paxton Consulting Engineers $908,201
16 Dewberry $824,640
17 Mazzetti $800,022
18 Affiliated Engineers $718,000
19 Vanderweil Engineers $635,800
20 Spectrum Engineers $559,365
21 KPFF Consulting Engineers $500,000
22 KCI Technologies $500,000
23 Dunham Associates $500,000
24 Walker Parking Consultants $425,000
25 Syska Hennessy Group $417,504
26 STV $279,000
27 I. C. Thomasson Associates $250,000
28 Simpson Gumpertz & Heger $200,000
29 RMF Engineering $150,000
30 M-E Engineers $100,000
31 Wiss, Janney, Elstner Associates $100,000
32 TLC Engineering for Architecture $77,955
33 Brinjac Engineering $77,934
34 Glumac $77,370
35 Sparling $75,751
36 Henderson Engineers $69,000
37 Wick Fisher White $59,800
38 Aon Fire Protection Engineering Corp. $16,631
39 Allen & Shariff $15,000
40 G&W Engineering Corp. $14,200
41 Guernsey $5,361
42 Paulus, Sokolowski and Sartor $5,000

 

 

 

Top Veterans Administration Sector Construction Firms

Rank Company 2013 Veterans Administration Building Revenue
1 Clark Group $376,422,744
2 McCarthy Holdings $119,000,000
3 Brasfield & Gorrie $113,174,998
4 Walsh Group, The $107,708,781
5 Turner Construction $89,741,651
6 Gilbane $17,780,000
7 McShane Companies, The $17,672,043
8 Haselden Construction $13,342,778
9 Sundt Construction $12,865,799
10 Tutor Perini Corp. $9,980,863
11 Lend Lease $5,846,000
12 Manhattan Construction $5,631,000
13 Parsons Brinckerhoff $1,602,180
14 New South Construction $1,094,000
15 Alberici Constructors $1,080,320
16 Heery International $931,666
17 Hunt Construction Group $800,000
18 Astorino $662,420
19 S. M. Wilson & Co. $559,870
20 Hoar Construction $311,000
21 STV $279,000
22 CORE Construction Group $242,415
23 LPCiminelli $131,135
24 DPR Construction $101,416
25 Allen & Shariff $15,000
26 BlueScope Construction $6,138
27 Absher Construction $1,009

 

Read BD+C's full 2014 Giants 300 Report 

Related Stories

Museums | Aug 11, 2010

Design guidelines for museums, archives, and art storage facilities

This column diagnoses the three most common moisture challenges with museums, archives, and art storage facilities and provides design guidance on how to avoid them.

| Aug 11, 2010

Broadway-style theater headed to Kentucky

One of Kentucky's largest performing arts venues should open in 2011—that's when construction is expected to wrap up on Eastern Kentucky University's Business & Technology Center for Performing Arts. The 93,000-sf Broadway-caliber theater will seat 2,000 audience members and have a 60×24-foot stage proscenium and a fly loft.

| Aug 11, 2010

People+Firms

| Aug 11, 2010

Citizenship building in Texas targets LEED Silver

The Department of Homeland Security's new U.S. Citizenship and Immigration Services facility in Irving, Texas, was designed by 4240 Architecture and developed by JDL Castle Corporation. The focal point of the two-story, 56,000-sf building is the double-height, glass-walled Ceremony Room where new citizens take the oath.

| Aug 11, 2010

Carpenters' union helping build its own headquarters

The New England Regional Council of Carpenters headquarters in Dorchester, Mass., is taking shape within a 1940s industrial building. The Building Team of ADD Inc., RDK Engineers, Suffolk Construction, and the carpenters' Joint Apprenticeship Training Committee, is giving the old facility a modern makeover by converting the existing two-story structure into a three-story, 75,000-sf, LEED-certif...

| Aug 11, 2010

Utah research facility reflects Native American architecture

A $130 million research facility is being built at University of Utah's Salt Lake City campus. The James L. Sorenson Molecular Biotechnology Building—a USTAR Innovation Center—is being designed by the Atlanta office of Lord Aeck & Sargent, in association with Salt-Lake City-based Architectural Nexus.

| Aug 11, 2010

San Bernardino health center doubles in size

Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.

| Aug 11, 2010

Goettsch Partners wins design competition for Soochow Securities HQ in China

Chicago-based Goettsch Partners has been selected to design the Soochow Securities Headquarters, the new office and stock exchange building for Soochow Securities Co. Ltd. The 21-story, 441,300-sf project includes 344,400 sf of office space, an 86,100-sf stock exchange, classrooms, and underground parking.

| Aug 11, 2010

New hospital expands Idaho healthcare options

Ascension Group Architects, Arlington, Texas, is designing a $150 million replacement hospital for Portneuf Medical Center in Pocatello, Idaho. An existing facility will be renovated as part of the project. The new six-story, 320-000-sf complex will house 187 beds, along with an intensive care unit, a cardiovascular care unit, pediatrics, psychiatry, surgical suites, rehabilitation clinic, and ...

| Aug 11, 2010

Colonnade fixes setback problem in Brooklyn condo project

The New York firm Scarano Architects was brought in by the developers of Olive Park condominiums in the Williamsburg section of Brooklyn to bring the facility up to code after frame out was completed. The architects designed colonnades along the building's perimeter to create the 15-foot setback required by the New York City Planning Commission.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021