The Raymond F. Kravis Center for the Performing Arts in West Palm Beach Fla., is set to receive $50 million worth of upgrades that will increase the size of the center and make it more user-friendly.
Upgrades include increasing the size of the Dreyfoos Hall Lobby, implementing new technology throughout, creating a pedestrian-friendly plaza, adding a new valet parking garage, building a new entrance/exit ramp to the existing parking garage, and improving traffic flow on and around the campus.
See Also: Florida mixed-use development uses wellness as the backbone of its design
The lobby expansion will see the glass curtain wall extended out by 30 feet. This will add 6,000 sf to the Dreyfoos Hall Lobby, providing more room for guests and reducing wait times at the bar, bistro, and other service areas. The expansion will include additional seating and restrooms.
Courtesy Leo A Daly.
The new valet parking garage will reduce traffic congestion and improve safety around the Center. It will be located on the east side of the building on the site of the former Amphitheater. Meanwhile, the new entrance and exit ramp to the self-parking garage will offer guests an easier way to access the fourth and fifth levels and improve traffic congestion in the garage as a whole.
The new pedestrian urban plaza will provide a park-like space that gives guests easier access to the Center. The area will feature expanded sidewalks, a bike path, and a waterfall fountain.
Courtesy Leo A Daly.
Technology improvements throughout the Center include closed-circuit video monitoring of the garage and entire campus; updated marketing, Box Office, and public information technology; the installation of a barcode system for tickets for ease of entry and improved security; electronic wayfinding; and additional security screeners at venue entrances.
Leo A Daly designed the design-build project with the Weitz Company serving as the general contractor and the Wantman Group providing landscape design. Construction began in May 2018 and is slated for completion in 2020.
Courtesy Leo A Daly.
Courtesy Leo A Daly.
Related Stories
Performing Arts Centers | Apr 25, 2017
The ‘Chrysalis’ brings 5,000 sf of outdoor performance space to Maryland’s Merriweather Park
The stage is covered with a curving steel and aluminum-shingled shell.
Performing Arts Centers | Mar 6, 2017
An oval defines the Frank Gehry-designed Pierre Boulez Saal concert hall
The hall hosted its debut concert on Saturday, March 4 with a performance by the Boulez Ensemble.
Performing Arts Centers | Jan 17, 2017
This reimagined Globe Theatre is created primarily with shipping containers
The Container Globe would be used for theater performances, live music, and as a sculpture garden.
Performing Arts Centers | Aug 31, 2016
Sydney Opera House scheduled for $200 million upgrade
Acoustical improvements will be made alongside upgrades in accessibility, efficiency, and flexibility.
Performing Arts Centers | Jun 16, 2016
Synagogues in Omaha and New York get new lives after intense reconstruction
The Omaha Conservatory of Music gets a new home in a temple. A fire leads to an ambitious rebuild for a NYC synagogue.
Performing Arts Centers | May 4, 2016
Diamond Schmitt unveils designs for Buddy Holly Hall performing arts center
The spacious and versatile complex can hold operas, plays, rock concerts, and conferences.
Cultural Facilities | May 4, 2016
World’s largest cultural center planned for Dubai
The Opera District will have a 2,000-seat theater and three residential complexes.
Performing Arts Centers | Apr 22, 2016
Construction begins on RUR Architecture’s Taipei Pop Music Center’s South Site
The designers believe the center, which will have performance areas, production spaces, and a hall of fame, will be the Hollywood of Asian Pop music.
Performing Arts Centers | Apr 1, 2016
Adrian Smith + Gordon Gill Architecture’s The Yard at Chicago Shakespeare to begin construction this spring at Navy Pier
Among the unique design features is a movable set of structural audience “towers” that allows for directors and designers to create a space that works best for their specific performances.
| Jan 14, 2016
How to succeed with EIFS: exterior insulation and finish systems
This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.