Reading Hospital expansion project saves two months in construction schedule thanks to nora nTx

Sponsored Content Flooring

Reading Hospital expansion project saves two months in construction schedule thanks to nora nTx

Construction delays are common with projects as large as the $354 million Reading Hospital expansion. Maybe that’s why construction manager Jeff Hutwelker, project executive with LF Driscoll Co., LLC, was so pleased with his nora® experience. By Hutwelker’s estimates, nora nTx saved approximately two months in his construction schedule.


By nora | December 7, 2016

When Reading Hospital embarked on a 476,000-square-foot addition to its West Reading, Pennsylvania, location, the goal was to replace and relocate operating rooms spread across four buildings and provide 150 new private patient rooms. The nine-story tower that opened in October includes five floors of private patient rooms, 24 surgical suites, eight minor procedure rooms, reception and recovery areas and an expanded trauma unit. Most of the new facility features noraplan® eco floor covering with nora nTx.

nora nTx is a pre-applied, solvent-free adhesive backing that minimizes prep work and eliminates drying protocols, saving valuable time and money. The product is resistant to high moisture vapor emissions and has no pH limits, eliminating the need for moisture testing and remediation before installation.

According to Hutwelker, the application of nora nTx provided two advantages during construction. “It did not require a moisture mitigation system, which represents a savings in not only dollars, but also in time—two months in our construction schedule. Secondly, we had one company providing all the warranty for the flooring, which is pretty much unheard of in other projects. One warranty from one supplier is very helpful.”

 

 

Others involved in the project pointed to additional advantages nora flooring offers. David Major, the hospital’s director of facilities and construction, says “Maintenance of the product is greatly enhanced. We don’t have to unwax or wax the floors.”

Tim Cole, director of environmental services, agrees. “The floor offers as much as 20 to 30 percent in labor savings related to the care and maintenance of the floor. In addition, from an environmental standpoint, you can clean and maintain the floor with less caustic chemicals and cleaners as opposed to other traditional floor coverings.”

The floor’s simple maintenance regimen is also expected to improve patient throughput. Says Cole, “With nora flooring, we can turn over patient rooms very quickly—probably in half the time it would take to do a floor we have to clean and wax.” And he appreciates the floor’s low-gloss finish, which helps older patients sometimes disoriented by shiny floors.

Meanwhile, Marie Keim, Reading Health System’s director of epidemiology infection and prevention, applauds the floor’s contribution to infection prevention. “The surfaces are smooth; we don’t need to be concerned about residual water, bacteria and other items going into cracks and crevices and harboring any sort of bacteria or organisms. The other positive aspect of the nora flooring is that it resists staining...and the floor makes it much easier to stand throughout our day as we provide services to our patients.”

Comfort underfoot, stain and slip resistance, a simple maintenance regimen, improved indoor air quality and construction time and cost savings—together, these benefits support the hospital’s decision to install nora rubber flooring with nora nTx throughout its new tower.

 

nora systems, Inc. 
Phone: 1-800-332-NORA
Fax: (603) 894-6615
Email: info-us@nora.com
Website: www.nora.com/us

Related Stories

| Aug 11, 2010

Stimulus funding helps get NOAA project off the ground

The award-winning design for the National Oceanic and Atmospheric Administration’s new Southwest Fisheries Science Center replacement laboratory saw its first sign of movement last month with a groundbreaking ceremony held in La Jolla, Calif. The $102 million project is funded primarily by the American Recovery and Reinvestment Act.

| Aug 11, 2010

National Intrepid Center tops out at Walter Reed

SmithGroup, Turner Construction, and the Intrepid Fallen Heroes Fund (IFHF), a nonprofit organization supporting the men and women of the United States Armed Forces and their families, celebrated the overall structural completion of the National Intrepid Center of Excellence (NICoE), an advanced facility dedicated to research, diagnosis, and treatment of military personnel and veterans sufferin...

| Aug 11, 2010

Alabama hospital gets a four-story addition

Birmingham, Ala.-based Hoar Construction has completed the North Tower addition at Thomas Hospital in Fairhope, Ala. The four-story, 123,000-sf addition accommodates an ER on the first floor, 32 private patient rooms and nursing support on the second and third floors, and room for 32 planned patient rooms on the top floor.

| Aug 11, 2010

America's Greenest Hospital

Hospitals are energy gluttons. With 24/7/365 operating schedules and stringent requirements for air quality in ORs and other clinical areas, an acute-care hospital will gobble up about twice the energy per square foot of, say, a commercial office building. It is an achievement worth noting, therefore, when a major hospital achieves LEED Platinum status, especially when that hospital attains 14 ...

| Aug 11, 2010

Hospital Additions + Renovations: 14 Lessons from Expert Building Teams

Two additions to a community hospital in Ohio that will double its square footage. A 12-story addition on top of an existing 12-story tower at Houston's M.D. Anderson Cancer Center. A $54 million renovation and addition at the University of Virginia Medical Center. A 67-bed, $70 million addition/renovation to a community hospital that is only five years old.

| Aug 11, 2010

Research Facility Breaks the Mold

In the market for state-of-the-art biomedical research space in Boston's Longwood Medical Area? Good news: there are still two floors available in the Center for Life Science | Boston, a multi-tenant, speculative high-rise research building designed by Tsoi/Kobus & Associates, Boston, and developed by Lyme Properties, Hanover, N.

| Aug 11, 2010

3 Hospitals, 3 Building Teams, 1 Mission: Optimum Sustainability

It's big news in any city when a new billion-dollar hospital is announced. Imagine what it must be like to have not one, not two, but three such blockbusters in the works, each of them tracking LEED-NC Gold certification from the U.S. Green Building Council. That's the case in San Francisco, where three new billion-dollar-plus healthcare facilities are in various stages of design and constructi...

| Aug 11, 2010

Holyoke Health Center

The team behind the new Holyoke (Mass.) Health Center was aiming for more than the renovation of a single building—they were hoping to revive an entire community. Holyoke's central business district was built in the 19th century as part of a planned industrial town, but over the years it had fallen into disrepair.

| Aug 11, 2010

Right-Sizing Healthcare

Over the past 30 years or so, the healthcare industry has quietly super-sized its healthcare facilities. Since 1980, ORs have bulked up in size by 53%, acute-care patient rooms by 77%. The slow creep went unlabeled until recently, when consultant H. Scot Latimer applied the super-sizing moniker to hospitals, inpatient rooms, operating rooms, and other treatment and administrative spaces.

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021