flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reconstruction Awards: The Cigar Factory

Reconstruction Awards

Reconstruction Awards: The Cigar Factory

The Cigar Factory was originally a cotton mill but became the home of the American Cigar Company in 1912. 


By BD+C Staff | November 16, 2016

The Cigar Factory is celebrating its third life in its 135-year history, this time as a Class A office building anchoring Charleston’s emerging NoMo (North Morrison Boulevard) technology corridor. Robert Oswald / Oswald Design & Creative.

The Cigar Factory, built in 1881, occupies an entire block in Charleston, S.C. It was originally a cotton mill but became the home of the American Cigar Company in 1912. 

Federal Capital Partners took ownership of the 230,000-sf structure in 2014. Because the building is on the National Register of Historic Places and the developer wanted to use historic tax credits, the project had to pass muster with the State Historic Preservation Office, the National Park Service, and Charleston’s Board of Architectural Review.

The Building Team, led by design firm Stevens & Wilkinson and contractor Trident Construction, custom-milled timbers to match existing members, replicated historic cast-iron pattress plates, and custom-fabricated rafter tails and exterior fascia and trim to match original components. Trident also completed $750,000 of unanticipated carpentry work for timber remediation.

The team’s most remarkable effort: replacing 365 arched, 10-foot-high windows with hurricane-resistant glazing, custom manufactured by Graham Architectural Products to meet the owner’s aesthetic objectives. This effort alone represented 20% of the project budget.

 

PROJECT SUMMARY 

 

Silver Award Winner | Charleston, S.C.

Building Team: Stevens & Wilkinson (submitting firm, architect, MEP) and Trident Construction (submitting firm, GC); Federal Capital Partners (developer); David Thompson Architect (interior architect); 4SE Inc. (SE); and Trinity Partners (CM).

Details: 230,000 sf. Construction cost: $35 million. Construction time: May 2014 to April 2015. Delivery method: Negotiated GC.

Related Stories

Reconstruction Awards | Nov 13, 2017

Harlem Renaissance: A vacant school provides much-needed housing and a clubhouse for children

Word that PS 186 might be demolished brought out the preservationists, whose letter-writing campaign gained the support of the New York Landmarks Conservancy.

Reconstruction Awards | Nov 16, 2016

BD+C's 2016 Reconstruction Award Winners

St. Patrick’s Cathedral, Lovejoy Wharf, and the Bay Area Metro Center are just a few of the projects recognized as 2016 Reconstruction Award winners.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: The Renwick Gallery of The Smithsonian American Art Museum

The renovation restored two long-concealed vaulted ceilings in the second-floor galleries and recreated the original 19th-century window configuration.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: Massachusetts Maritime Academy

The two-story “overbuild” employed block and plank construction with drag strut detailing to connect it to the existing building.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: The Masonic Temple

The building team suspended a new eighth-floor mezzanine and added 18 9x15-foot windows to the north, south, and west façades.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: San Francisco War Memorial Veterans Building

The building team used a system of rocking concrete shear walls, which eliminated the need for deep foundations and reduced the shear force on each wall.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: Arc at Old Colony

The Arc at Old Colony's vintage floor plans, voluminous lobby, and myriad elevators were perfect for redevelopment as a historically charming residential building.

Reconstruction Awards | Nov 16, 2016

Reconstruction Awards: Noble Chapel

In May 2013 the 124-year-old Noble Chapel, suffered a three-alarm fire that almost completely destroyed its 1937 crematorium.

boombox1
boombox2
native1

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021