The Three Arts Club, a 1914 Holabird & Roche building, was once used as a home and club for women involved in music, painting, and drama. A recent repurposing added new spaces and restored historically significant details to convert the 65,000-sf building into Restoration Hardware’s Chicago Gallery. On the exterior, masonry and terra cotta were revitalized, and ugly fire escapes on the south façade were removed.
Two new spaces were added: a two-story atrium, used as a public dining area; and a rooftop space consisting of additional rooms and open air terraces used to display indoor-outdoor merchandise.
The existing basement proved too small for Restoration Hardware’s needs. To enlarge the basement below the original courtyard, the contractor, Pepper Construction, secured an excavator that could squeeze into the 45x45-foot space and crane-lifted it into place without hitting the building. Three weeks of excavation later and the site was big enough to serve as a functional basement.
PROJECT SUMMARY
Silver Award Winner | Chicago, Ill.
Building Team: Pepper Construction Company (submitting firm, GC); Restoration Hardware (owner); Booth Hansen Architecture (architect); Forefront Structural Engineers Inc. (SE); Block Electric Company (electrical engineer); Norman Mechanical Inc. (plumbing engineer).
Details: 65,000 sf. Construction time: August 2014 to September 2015. Delivery method: CM at risk.
Related Stories
Reconstruction Awards | Nov 11, 2016
Exclusive Chicago club re-emerges as a boutique hotel
Built in 1893 for the World’s Columbian Exposition, the CAA was an exclusive social club founded by leading figures in American sports and commerce.
Reconstruction Awards | Dec 1, 2015
Massive Chicago parking garage gets overdue waterproofing
Millennium Lakeside Garage, the largest underground parking facility in the U.S., hadn’t been waterproofed since the 1970s. The massive project took nearly 2½ years and 33,554 man-hours.
Reconstruction Awards | Nov 30, 2015
Washington Monument restored after 2011 East Coast earthquake
This restoration and repair project, which was completed under budget and eight days early (despite several setbacks), involved re-pointing 2.5 miles of mortar joints, repairing 1,200 linear feet of cracks, and installing 150 sf of Dutchman repairs. Construction took place from November 2011 to May 2014.
Reconstruction Awards | Nov 30, 2015
Denver's 107-year-old seminary campus modernized
The scope of the project included the seminary dorms, library, and chapel, all of which posed their own set of obstacles.
Reconstruction Awards | Nov 24, 2015
Center of I.M. Pei-designed plaza part of Washington redevelopment
The L’Enfant Plaza, a three-story below-grade mall, was renovated to include a new glass atrium pavilion and a 40-foot-long, interactive LED.
Reconstruction Awards | Nov 24, 2015
Manhattan's first freestanding emergency department a result of adaptive reuse
The Lenox Hill Healthplex, a restoration of the Curran O’Toole Building, has glass-block walls and a carefully preserved exterior.
Reconstruction Awards | Nov 19, 2015
Nave restored at Yale’s Sterling Memorial Library
Turner Construction and Helpern Architects revived the 150-foot-long nave, which was embellished with stained glass windows by G. Owen Bonawit, stone carvings by René P. Chambellan, and decorative ironwork by Samuel Yellin.
Reconstruction Awards | Nov 19, 2015
Infinite Chicago redevelopment bridges past to present
The renovation of three historic downtown buildings—the Gibbons and Steger Buildings and Pickwick Stables—includes a multi-level concrete walkway connection.
Reconstruction Awards | Nov 18, 2015
Sun Theater serves the youth of St. Louis
Lawrence Group and property owner TLG Beaux Arts raised $11 million to restore the 26,000-sf theater into a modern performance venue.
Reconstruction Awards | Nov 17, 2015
Smithsonian Institution’s Arts and Industries Building again an exposition and museum space