flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reconstruction Awards: The Renwick Gallery of The Smithsonian American Art Museum

Reconstruction Awards

Reconstruction Awards: The Renwick Gallery of The Smithsonian American Art Museum

The renovation restored two long-concealed vaulted ceilings in the second-floor galleries and recreated the original 19th-century window configuration.


By BD+C Staff | November 16, 2016

Two long-concealed vaulted ceilings in the second-floor galleries were restored. The project had to obtain with numerous regulatory approvals. Courtesy Smithsonian American Art Museum.

The Renwick Gallery (1859) was designed by architect James Renwick, Jr., as the original Corcoran Gallery of Art. The National Historic Landmark is on the National Register of Historic Places and sits in the Lafayette Square Historic District. The Building Team, led by Westlake Reed Leskosky (lead architect) and Consigli Construction Co. (GC/CM), had to surmount numerous hurdles to gain approvals from the National Capital Planning Commission, the U.S. Commission of Fine Arts, the District of Columbia Historic Preservation Office, and even the Secret Service.

The renovation restored two long-concealed vaulted ceilings in the second-floor galleries and recreated the original 19th-century window configuration. 

The most difficult task involved the installation of an innovative rolling aluminum frame roof system. The retractable roof (from manufacturer HAKI) gave the team relatively efficient access to the cramped attic so that a new mechanical level could be constructed in that space. The new roof further protected the irreplaceable historic ceilings from the weather. The new mechanical system will keep the Renwick at the prescribed temperature and relative humidity to preserve the gallery’s artwork.

Consigli Construction laser scanned the structure to create a 3D BIM model that informed the rebuild of the attic and structural upgrades in the confined roof structure. The highly detailed model enabled the team to work within the building’s own structural system to add structural steel in the attic above the second-floor galleries, thus allowing for the installation of a robust art environment.

 

PROJECT SUMMARY 

 

Bronze Award Winner | Washington, D.C.

Building Team: Westlake Reed Leskosky (submitting firm, lead architect, MEP, sustainable design, lighting/technology, historic preservation); Consigli Construction Co. (submitting firm, GC/CM); The Smithsonian Institution (owner); Woods Peacock Engineering Consultants (SE); Wiles Mensch Corp. (CE); ATS Studios (historic restoration); Applied Environmental (hazmat); GHD/Protection Engineering Group (FP); MAS Building and Bridge (structural steel erector); Welsh and Rushe (mechanical contractor).

Details: 46,598 gsf, 34,000 nsf. Construction cost: $30 million. Construction time: January 2014 to November 2015. Delivery method: Design-bid-build.

Related Stories

Reconstruction Awards | Nov 11, 2016

Exclusive Chicago club re-emerges as a boutique hotel

Built in 1893 for the World’s Columbian Exposition, the CAA was an exclusive social club founded by leading figures in American sports and commerce.

Reconstruction Awards | Dec 1, 2015

Massive Chicago parking garage gets overdue waterproofing

Millennium Lakeside Garage, the largest underground parking facility in the U.S., hadn’t been waterproofed since the 1970s. The massive project took nearly 2½ years and 33,554 man-hours.

Reconstruction Awards | Nov 30, 2015

Washington Monument restored after 2011 East Coast earthquake

This restoration and repair project, which was completed under budget and eight days early (despite several setbacks), involved re-pointing 2.5 miles of mortar joints, repairing 1,200 linear feet of cracks, and installing 150 sf of Dutchman repairs. Construction took place from November 2011 to May 2014.

Reconstruction Awards | Nov 30, 2015

Denver's 107-year-old seminary campus modernized

The scope of the project included the seminary dorms, library, and chapel, all of which posed their own set of obstacles.

Reconstruction Awards | Nov 24, 2015

Center of I.M. Pei-designed plaza part of Washington redevelopment

The L’Enfant Plaza, a three-story below-grade mall, was renovated to include a new glass atrium pavilion and a 40-foot-long, interactive LED.

Reconstruction Awards | Nov 24, 2015

Manhattan's first freestanding emergency department a result of adaptive reuse

The Lenox Hill Healthplex, a restoration of the Curran O’Toole Building, has glass-block walls and a carefully preserved exterior.

Reconstruction Awards | Nov 19, 2015

Nave restored at Yale’s Sterling Memorial Library

Turner Construction and Helpern Architects revived the 150-foot-long nave, which was embellished with stained glass windows by G. Owen Bonawit, stone carvings by René P. Chambellan, and decorative ironwork by Samuel Yellin.

Reconstruction Awards | Nov 19, 2015

Infinite Chicago redevelopment bridges past to present

The renovation of three historic downtown buildings—the Gibbons and Steger Buildings and Pickwick Stables—includes a multi-level concrete walkway connection.

Reconstruction Awards | Nov 18, 2015

Sun Theater serves the youth of St. Louis

Lawrence Group and property owner TLG Beaux Arts raised $11 million to restore the 26,000-sf theater into a modern performance venue.  

Reconstruction Awards | Nov 17, 2015

Smithsonian Institution’s Arts and Industries Building again an exposition and museum space

After removing decades’ worth of unfortunate additions to expose 17 historic interior spaces for the National Historic Landmark, the Building Team zoned in on the client’s key concern.  

boombox1
boombox2
native1

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021