flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.


By BD+C Staff | July 19, 2013
Rank Company 2012 Reconstruction Revenue ($)
1 Stantec $280,352,652
2 HOK $134,237,400
3 HDR Architecture $114,065,000
4 Cannon Design $87,000,000
5 Wight & Co. $78,367,600
6 HKS $72,000,000
7 HMC Architects $62,356,949
8 Astorino $55,944,000
9 Leo A Daly $55,674,775
10 Perkins+Will $54,045,000
11 EYP $51,228,701
12 SmithGroupJJR $49,980,000
13 Callison $46,939,398
14 DLR Group $46,400,000
15 Hammel, Green and Abrahamson $44,920,000
16 Perkins Eastman $43,500,000
17 Gresham, Smith and Partners $40,967,355
18 NELSON $37,876,729
19 ZGF Architects $37,291,618
20 MBH Architects $32,124,000
21 HLW International $30,000,000
22 Beyer Blinder Belle Architects & Planners $27,554,840
23 FRCH Design Worldwide $26,500,000
24 WD Partners $25,900,000
25 Corgan $25,613,112
26 EwingCole $25,500,000
27 LPA $25,104,465
28 Perkowitz+Ruth Architects $21,597,000
29 Shepley Bulfinch Richardson & Abbott $21,585,246
30 SMMA | Symmes Maini & McKee Associates $21,555,000
31 PageSoutherlandPage $19,700,000
32 Swanke Hayden Connell Asrchitects $19,500,000
33 S/L/A/M Collaborative, The $19,341,768
34 Flad Architects $18,750,000
35 BSA LifeStructures $18,233,154
36 Ware Malcomb $17,750,000
37 Reynolds, Smith and Hills $17,440,000
38 Westlake Reed Leskosky $16,640,000
39 WHR Architects $16,487,132
40 Array Architects $16,160,317
41 Harley Ellis Devereaux $15,662,000
42 NTD Architecture $14,129,224
43 Francis Cauffman $13,678,748
44 RBB Architects $13,112,000
45 GBBN Architects $12,785,000
46 HNTB Archtecture $12,362,040
47 CTA Architects Engineers $12,006,185
48 Epstein $11,564,000
49 Fentress Architects $11,560,000
50 Nadel $11,000,000
51 Fletcher-Thompson $10,945,000
52 Ennead Architects $10,800,000
53 Baskervill $10,410,000
54 Moody Nolan $10,400,000
55 Hoffmann Architects $10,288,000
56 Payette $9,955,110
57 Legat Architects $9,821,000
58 FreemanWhite $9,801,940
59 Albert Kahn Family of Companies $9,788,300
60 PBK $9,442,500
61 CASCO $9,187,500
62 OZ Architecture $9,013,200
63 Kaplan McLaughlin Diaz $9,000,000
64 Lord, Aeck & Sargent $8,960,000
65 Fanning/Howey Associates $8,548,000
66 Environetics $8,446,957
67 Moseley Architects $8,077,754
68 Cambridge Seven Associates $7,873,500
69 LMN Architects $7,674,100
70 FKP Architects $7,370,000
71 Integrated Design Group $7,276,959
72 Cooper Carry $6,857,442
73 FXFOWLE Architects $6,801,127
74 Anderson Mikos Architects $6,763,800
75 BBG-BBGM $6,400,000
76 Kirksey Architecture $6,345,757
77 FGM Architects $6,257,500
78 Morris Architects $5,850,000
79 KZF Design $5,115,849
80 Margulies Perruzzi Architects $5,032,276
81 Sherlock, Smith & Adams $4,968,000
82 SEI Design Group $4,603,000
83 Harvard Jolly Architecture $4,477,699
84 Sasaki Associates $4,358,670
85 Omniplan Architects $4,314,833
86 Hoefer Wysocki Architecture $4,138,000
87 H3 Hardy Collaboration Architecture $3,916,000
88 Massa Montalto Architects $3,873,094
89 BBS Architects, Landscape Architects and Engineers $3,705,000
90 DLA Architects $3,653,780
91 Polytech Associates $3,600,000
92 LawKingdon Architecture $3,500,000
92 JRS Architect $3,500,000
94 SLATERPAULL Architects $3,076,914
95 Lee, Burkhart, Liu $3,045,000
96 Emersion Design $2,586,536
97 RDH Interests $2,241,463
98 Carrier Johnson + Culture $2,200,448
99 Goettsch Partners $1,890,000
100 AXIS Architecture + Design $1,869,734
101 Ballinger $1,855,251
102 Adache Group Architects $1,800,000
103 Davis Brody Bond $1,622,231
104 Rule Joy Trammell + Rubio $1,550,000
105 Hnedak Bobo Group $1,545,000
106 api(+) $1,462,000
107 CO Architects $1,325,000
108 Architekton $1,091,145
109 DJM Architecture $309,330
110 WDG Architecture $121,000
111 PHX Architecture $120,000
112 Hensley Lamkin Rachel $41,000

 

Back to the Reconstruction Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

Codes and Standards | Jul 15, 2024

New York City code update changes definition of a major building

Changes affecting how construction projects in New York City are permitted will have significant impacts for contractors. On Dec. 11, the definition of a major building in the city’s code will change from 10 stories to seven, or 75 feet. The change will affect thousands more projects.

Adaptive Reuse | Jul 12, 2024

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

University Buildings | Jul 11, 2024

3 considerations for designing healthy, adaptable student dining

Amanda Vigneau, IIDA, NCDIQ, LEED ID+C, Director, Shepley Bulfinch, shares three ways student dining facilities have evolved to match changes in student life.

Healthcare Facilities | Jul 11, 2024

New download: BD+C's 2024 Healthcare Annual Report

Welcome to Building Design+Construction’s 2024 Healthcare Annual Report. This free 66-page special report is our first-ever “state of the state” update on the $65 billion healthcare construction sector.

Transit Facilities | Jul 10, 2024

Historic Fresno train depot to be renovated for California high speed rail station project

A long-shuttered rail station in Fresno, Calif., will be renovated to serve as the city’s high speed rail (HSR) station as part of the California High-Speed Rail Authority system, the nation’s first high speed rail project. California’s HSR system will eventually link more than 800 miles of rail, served by up to 24 stations.

Government Buildings | Jul 8, 2024

GSA adopts new accessibility guidelines for federal properties

The U.S. General Services Administration (GSA) adopted a new rule with new accessibility guidelines for federal buildings. The rule establishes that pedestrian facilities in the public right-of-way are readily accessible to and usable by people with disabilities. 

Office Buildings | Jul 8, 2024

Office vacancy peak of 22% to 28% forecasted for 2026

The work from home trend will continue to put pressure on the office real estate market, with peak vacancy of between 22% and 28% in 2026, according to a forecast by Moody’s.

Virtual Reality | Jul 8, 2024

Can a VR-enabled AEC firm transform your project?

With the aid of virtual reality and three-dimensional visualization technologies, designers, consultants, and their clients can envision a place as though the project were in a later stage.

Green | Jul 8, 2024

Global green building alliance releases guide for $35 trillion investment to achieve net zero, meet global energy transition goals

The international alliance of UK-based Building Research Establishment (BRE), the Green Building Council of Australia (GBCA), the Singapore Green Building Council (SGBC), the U.S. Green Building Council (USGBC), and the Alliance HQE-GBC France developed the guide, Financing Transformation: A Guide to Green Building for Green Bonds and Green Loans, to strengthen global cooperation between the finance and real estate sectors.

Codes and Standards | Jul 8, 2024

New York State building code update would ban fossil fuels in new buildings

New York’s Building Code Council is set to include the All-Electric Buildings Act in its 2025 code update. The Act would ban natural gas and other fossil fuels in new buildings. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021