flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.


By BD+C Staff | July 19, 2013
Rank Company 2012 Reconstruction Revenue ($)
1 Stantec $280,352,652
2 HOK $134,237,400
3 HDR Architecture $114,065,000
4 Cannon Design $87,000,000
5 Wight & Co. $78,367,600
6 HKS $72,000,000
7 HMC Architects $62,356,949
8 Astorino $55,944,000
9 Leo A Daly $55,674,775
10 Perkins+Will $54,045,000
11 EYP $51,228,701
12 SmithGroupJJR $49,980,000
13 Callison $46,939,398
14 DLR Group $46,400,000
15 Hammel, Green and Abrahamson $44,920,000
16 Perkins Eastman $43,500,000
17 Gresham, Smith and Partners $40,967,355
18 NELSON $37,876,729
19 ZGF Architects $37,291,618
20 MBH Architects $32,124,000
21 HLW International $30,000,000
22 Beyer Blinder Belle Architects & Planners $27,554,840
23 FRCH Design Worldwide $26,500,000
24 WD Partners $25,900,000
25 Corgan $25,613,112
26 EwingCole $25,500,000
27 LPA $25,104,465
28 Perkowitz+Ruth Architects $21,597,000
29 Shepley Bulfinch Richardson & Abbott $21,585,246
30 SMMA | Symmes Maini & McKee Associates $21,555,000
31 PageSoutherlandPage $19,700,000
32 Swanke Hayden Connell Asrchitects $19,500,000
33 S/L/A/M Collaborative, The $19,341,768
34 Flad Architects $18,750,000
35 BSA LifeStructures $18,233,154
36 Ware Malcomb $17,750,000
37 Reynolds, Smith and Hills $17,440,000
38 Westlake Reed Leskosky $16,640,000
39 WHR Architects $16,487,132
40 Array Architects $16,160,317
41 Harley Ellis Devereaux $15,662,000
42 NTD Architecture $14,129,224
43 Francis Cauffman $13,678,748
44 RBB Architects $13,112,000
45 GBBN Architects $12,785,000
46 HNTB Archtecture $12,362,040
47 CTA Architects Engineers $12,006,185
48 Epstein $11,564,000
49 Fentress Architects $11,560,000
50 Nadel $11,000,000
51 Fletcher-Thompson $10,945,000
52 Ennead Architects $10,800,000
53 Baskervill $10,410,000
54 Moody Nolan $10,400,000
55 Hoffmann Architects $10,288,000
56 Payette $9,955,110
57 Legat Architects $9,821,000
58 FreemanWhite $9,801,940
59 Albert Kahn Family of Companies $9,788,300
60 PBK $9,442,500
61 CASCO $9,187,500
62 OZ Architecture $9,013,200
63 Kaplan McLaughlin Diaz $9,000,000
64 Lord, Aeck & Sargent $8,960,000
65 Fanning/Howey Associates $8,548,000
66 Environetics $8,446,957
67 Moseley Architects $8,077,754
68 Cambridge Seven Associates $7,873,500
69 LMN Architects $7,674,100
70 FKP Architects $7,370,000
71 Integrated Design Group $7,276,959
72 Cooper Carry $6,857,442
73 FXFOWLE Architects $6,801,127
74 Anderson Mikos Architects $6,763,800
75 BBG-BBGM $6,400,000
76 Kirksey Architecture $6,345,757
77 FGM Architects $6,257,500
78 Morris Architects $5,850,000
79 KZF Design $5,115,849
80 Margulies Perruzzi Architects $5,032,276
81 Sherlock, Smith & Adams $4,968,000
82 SEI Design Group $4,603,000
83 Harvard Jolly Architecture $4,477,699
84 Sasaki Associates $4,358,670
85 Omniplan Architects $4,314,833
86 Hoefer Wysocki Architecture $4,138,000
87 H3 Hardy Collaboration Architecture $3,916,000
88 Massa Montalto Architects $3,873,094
89 BBS Architects, Landscape Architects and Engineers $3,705,000
90 DLA Architects $3,653,780
91 Polytech Associates $3,600,000
92 LawKingdon Architecture $3,500,000
92 JRS Architect $3,500,000
94 SLATERPAULL Architects $3,076,914
95 Lee, Burkhart, Liu $3,045,000
96 Emersion Design $2,586,536
97 RDH Interests $2,241,463
98 Carrier Johnson + Culture $2,200,448
99 Goettsch Partners $1,890,000
100 AXIS Architecture + Design $1,869,734
101 Ballinger $1,855,251
102 Adache Group Architects $1,800,000
103 Davis Brody Bond $1,622,231
104 Rule Joy Trammell + Rubio $1,550,000
105 Hnedak Bobo Group $1,545,000
106 api(+) $1,462,000
107 CO Architects $1,325,000
108 Architekton $1,091,145
109 DJM Architecture $309,330
110 WDG Architecture $121,000
111 PHX Architecture $120,000
112 Hensley Lamkin Rachel $41,000

 

Back to the Reconstruction Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

Museums | Aug 11, 2010

Design guidelines for museums, archives, and art storage facilities

This column diagnoses the three most common moisture challenges with museums, archives, and art storage facilities and provides design guidance on how to avoid them.

| Aug 11, 2010

Broadway-style theater headed to Kentucky

One of Kentucky's largest performing arts venues should open in 2011—that's when construction is expected to wrap up on Eastern Kentucky University's Business & Technology Center for Performing Arts. The 93,000-sf Broadway-caliber theater will seat 2,000 audience members and have a 60×24-foot stage proscenium and a fly loft.

| Aug 11, 2010

People+Firms

| Aug 11, 2010

Citizenship building in Texas targets LEED Silver

The Department of Homeland Security's new U.S. Citizenship and Immigration Services facility in Irving, Texas, was designed by 4240 Architecture and developed by JDL Castle Corporation. The focal point of the two-story, 56,000-sf building is the double-height, glass-walled Ceremony Room where new citizens take the oath.

| Aug 11, 2010

Carpenters' union helping build its own headquarters

The New England Regional Council of Carpenters headquarters in Dorchester, Mass., is taking shape within a 1940s industrial building. The Building Team of ADD Inc., RDK Engineers, Suffolk Construction, and the carpenters' Joint Apprenticeship Training Committee, is giving the old facility a modern makeover by converting the existing two-story structure into a three-story, 75,000-sf, LEED-certif...

| Aug 11, 2010

Utah research facility reflects Native American architecture

A $130 million research facility is being built at University of Utah's Salt Lake City campus. The James L. Sorenson Molecular Biotechnology Building—a USTAR Innovation Center—is being designed by the Atlanta office of Lord Aeck & Sargent, in association with Salt-Lake City-based Architectural Nexus.

| Aug 11, 2010

San Bernardino health center doubles in size

Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.

| Aug 11, 2010

Goettsch Partners wins design competition for Soochow Securities HQ in China

Chicago-based Goettsch Partners has been selected to design the Soochow Securities Headquarters, the new office and stock exchange building for Soochow Securities Co. Ltd. The 21-story, 441,300-sf project includes 344,400 sf of office space, an 86,100-sf stock exchange, classrooms, and underground parking.

| Aug 11, 2010

New hospital expands Idaho healthcare options

Ascension Group Architects, Arlington, Texas, is designing a $150 million replacement hospital for Portneuf Medical Center in Pocatello, Idaho. An existing facility will be renovated as part of the project. The new six-story, 320-000-sf complex will house 187 beds, along with an intensive care unit, a cardiovascular care unit, pediatrics, psychiatry, surgical suites, rehabilitation clinic, and ...

| Aug 11, 2010

Colonnade fixes setback problem in Brooklyn condo project

The New York firm Scarano Architects was brought in by the developers of Olive Park condominiums in the Williamsburg section of Brooklyn to bring the facility up to code after frame out was completed. The architects designed colonnades along the building's perimeter to create the 15-foot setback required by the New York City Planning Commission.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021