flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 19, 2013
Rank Company 2012 Reconstruction Revenue ($)
1 URS Corp. $292,591,405
2 STV $125,755,000
3 Wiss, Janney, Elstner Associates $72,500,000
4 Science Applications International Corp. $57,788,875
5 Middough $54,100,000
6 Dewberry $53,086,519
7 SSOE Group $52,518,417
8 Thornton Tomasetti $50,250,524
9 Syska Hennessy Group $49,258,501
10 AKF Group $45,000,000
11 Simpson Gumpertz & Heger $43,800,000
12 Buro Happold Consulting Engineers $38,844,000
13 Henderson Engineers $33,000,000
14 TTG $30,728,610
15 Environmental Systems Design $28,211,025
16 RDK Engineers $26,520,850
17 Smith Seckman Reid $21,167,725
18 H&A Architects & Engineers $20,982,548
19 Rolf Jensen & Associates $20,800,000
20 TLC Engineering for Architecture $20,577,575
21 RMF Engineering Design $18,698,000
22 Degenkolb Engineers $18,338,904
23 Ross & Baruzzini $17,765,787
24 Interface Engineering $16,895,439
25 Michael Baker Jr. $16,480,000
26 Bard, Rao + Athanas Consulting Engineers $15,500,000
27 Newcomb & Boyd $14,428,325
28 Coffman Engineers $14,200,000
29 KCI Technologies $13,432,000
30 ThermalTech Engineering $12,900,000
31 Affiliated Engineers $12,660,000
32 Glumac $12,633,000
33 Dunham Associates $12,500,000
34 Clark Nexsen $12,454,770
35 KPFF Consulting Engineers $11,000,000
36 Walker Parking Consultants $10,939,513
37 H.F. Lenz $10,796,600
38 Bergmann Associates $10,159,200
39 CCRD Partners $10,100,000
40 Allen & Shariff $10,000,000
41 Bridgers & Paxton Consulting Engineers $9,277,886
42 Merrick & Co. $9,000,000
43 Heapy Engineering $8,846,776
44 Sparling $8,518,471
45 Hixson Architecture, Engineering, Interiors $8,500,000
46 M-E Engineers $8,000,000
47 M/E Engineering $7,940,450
48 KLH Engineers $7,036,415
49 Peter Basso Associates $6,609,600
50 Bala Consulting Engineers $6,572,000
51 CTLGroup $5,500,000
52 Paulus, Sokolowski and Sartor $5,200,000
53 P2S Engineering $4,717,436
54 GRAEF $4,620,000
55 Rist-Frost-Shumway Engineering $4,300,000
56 Brinjac Engineering $4,018,072
57 Davis, Bowen & Friedel $3,616,428
58 Wallace Engineering $3,500,000
59 Kamm Consulting $3,313,597
60 OLA Consulting Engineers $3,200,000
61 Primera Engineers $2,990,000
62 Magnusson Klemencic Associates $2,719,958
63 FBA Engineering $2,160,000
64 Haynes Whaley Associates $639,876
65 Walter P Moore $320,431

 

Back to the Reconstruction Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Dec 29, 2014

Wearable job site management system allows contractors to handle deficiencies with subtle hand and finger gestures [BD+C's 2014 Great Solutions Report]

Technology combines a smartglass visual device with a motion-sensing armband to simplify field management work. The innovation was named a 2014 Great Solution by the editors of Building Design+Construction. 

| Dec 29, 2014

From Ag waste to organic brick: Corn stalks reused to make construction materials [BD+C's 2014 Great Solutions Report]

Ecovative Design applies its cradle-to-cradle process to produce 10,000 organic bricks used to build a three-tower structure in Long Island City, N.Y. The demonstration project was named a 2014 Great Solution by the editors of Building Design+Construction.

| Dec 29, 2014

14 great solutions for the commercial construction market

Ideas are cheap. Solutions are what count. The latest installment in BD+C's Great Solutions series presents 14 ways AEC professionals, entrepreneurs, and other clever folk have overcome what seemed to be insoluble problems—from how to make bricks out of agricultural waste, to a new way to keep hospitals running clean during construction.

| Dec 29, 2014

HealthSpot station merges personalized healthcare with videoconferencing [BD+C's 2014 Great Solutions Report]

The HealthSpot station is an 8x5-foot, ADA-compliant mobile kiosk that lets patients access a network of board-certified physicians through interactive videoconferencing and medical devices. It was named a 2014 Great Solution by the editors of Building Design+Construction.

| Dec 28, 2014

Robots, drones, and printed buildings: The promise of automated construction

Building Teams across the globe are employing advanced robotics to simplify what is inherently a complex, messy process—construction.

BIM and Information Technology | Dec 28, 2014

The Big Data revolution: How data-driven design is transforming project planning

There are literally hundreds of applications for deep analytics in planning and design projects, not to mention the many benefits for construction teams, building owners, and facility managers. We profile some early successful applications.  

| Dec 28, 2014

AIA course: Enhancing interior comfort while improving overall building efficacy

Providing more comfortable conditions to building occupants has become a top priority in today’s interior designs. This course is worth 1.0 AIA LU/HSW.

| Dec 28, 2014

6 trends steering today's college residence halls

University students want more in a residence hall than just a place to sleep. They want a space that reflects their style of living and learning.

| Dec 28, 2014

Using energy modeling to increase project value [AIA course]

This course, worth 1.0 AIA LU/HSW, explores how to increase project value through energy modeling, as well as how to conduct quick payback and net present value studies to identify which energy strategies are most viable for the project.

| Dec 28, 2014

The lowdown on LODs: Bringing clarity to BIM

These days, BIM is par for the course across most facets of design. But a lot of the conversation surrounding BIM still lacks clarity due to ambiguous terminology, a lack of clear-cut guiding illustrations, and widely varying implementation, writes GS&P's John Scannell.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021