Rank | Company | 2012 Reconstruction Revenue ($) |
1 | URS Corp. | $292,591,405 |
2 | STV | $125,755,000 |
3 | Wiss, Janney, Elstner Associates | $72,500,000 |
4 | Science Applications International Corp. | $57,788,875 |
5 | Middough | $54,100,000 |
6 | Dewberry | $53,086,519 |
7 | SSOE Group | $52,518,417 |
8 | Thornton Tomasetti | $50,250,524 |
9 | Syska Hennessy Group | $49,258,501 |
10 | AKF Group | $45,000,000 |
11 | Simpson Gumpertz & Heger | $43,800,000 |
12 | Buro Happold Consulting Engineers | $38,844,000 |
13 | Henderson Engineers | $33,000,000 |
14 | TTG | $30,728,610 |
15 | Environmental Systems Design | $28,211,025 |
16 | RDK Engineers | $26,520,850 |
17 | Smith Seckman Reid | $21,167,725 |
18 | H&A Architects & Engineers | $20,982,548 |
19 | Rolf Jensen & Associates | $20,800,000 |
20 | TLC Engineering for Architecture | $20,577,575 |
21 | RMF Engineering Design | $18,698,000 |
22 | Degenkolb Engineers | $18,338,904 |
23 | Ross & Baruzzini | $17,765,787 |
24 | Interface Engineering | $16,895,439 |
25 | Michael Baker Jr. | $16,480,000 |
26 | Bard, Rao + Athanas Consulting Engineers | $15,500,000 |
27 | Newcomb & Boyd | $14,428,325 |
28 | Coffman Engineers | $14,200,000 |
29 | KCI Technologies | $13,432,000 |
30 | ThermalTech Engineering | $12,900,000 |
31 | Affiliated Engineers | $12,660,000 |
32 | Glumac | $12,633,000 |
33 | Dunham Associates | $12,500,000 |
34 | Clark Nexsen | $12,454,770 |
35 | KPFF Consulting Engineers | $11,000,000 |
36 | Walker Parking Consultants | $10,939,513 |
37 | H.F. Lenz | $10,796,600 |
38 | Bergmann Associates | $10,159,200 |
39 | CCRD Partners | $10,100,000 |
40 | Allen & Shariff | $10,000,000 |
41 | Bridgers & Paxton Consulting Engineers | $9,277,886 |
42 | Merrick & Co. | $9,000,000 |
43 | Heapy Engineering | $8,846,776 |
44 | Sparling | $8,518,471 |
45 | Hixson Architecture, Engineering, Interiors | $8,500,000 |
46 | M-E Engineers | $8,000,000 |
47 | M/E Engineering | $7,940,450 |
48 | KLH Engineers | $7,036,415 |
49 | Peter Basso Associates | $6,609,600 |
50 | Bala Consulting Engineers | $6,572,000 |
51 | CTLGroup | $5,500,000 |
52 | Paulus, Sokolowski and Sartor | $5,200,000 |
53 | P2S Engineering | $4,717,436 |
54 | GRAEF | $4,620,000 |
55 | Rist-Frost-Shumway Engineering | $4,300,000 |
56 | Brinjac Engineering | $4,018,072 |
57 | Davis, Bowen & Friedel | $3,616,428 |
58 | Wallace Engineering | $3,500,000 |
59 | Kamm Consulting | $3,313,597 |
60 | OLA Consulting Engineers | $3,200,000 |
61 | Primera Engineers | $2,990,000 |
62 | Magnusson Klemencic Associates | $2,719,958 |
63 | FBA Engineering | $2,160,000 |
64 | Haynes Whaley Associates | $639,876 |
65 | Walter P Moore | $320,431 |
Back to the Reconstruction Giants article
Read BD+C's full Giants 300 Report
Related Stories
| Aug 18, 2014
Seaside luxury: Arquitectonica, Melo Group introduce Aria on the Bay condo tower in Miami
Melo Group has launched sales for Aria on the Bay, its new 647-unit luxury condominium in Miami. The bayfront condo will overlook Margaret Pace Park, Biscayne Bay and the Miami Beach skyline.
Sponsored | | Aug 16, 2014
Fire-rated framing system makes the grade at Johnson & Wales University Center
The precision engineering of TGP’s Fireframes Aluminum Series creates narrow profiles and crisp sightlines at Johnson & Wales University Center for Physician Assistant Studies
| Aug 16, 2014
Decoupling the professional services firm
Business consultant Tim Williams authored a recent LinkedIn post that highlights the emerging trend among professional services firms toward “decoupling,” or consciously separating the high-value services that are scarce from the low-value services that are plentiful. SPONSORED CONTENT
| Aug 16, 2014
The science of learning: Designing the STEM learning facilities of the future
New technology and changing pedagogies are influencing how to best teach a generation of learners who have never known a world without smartphones or tablets, writes HOK's Kimberly Robidoux.
| Aug 16, 2014
Calatrava in hot water again? Famed architect charged to appear in court in Spanish construction case
The Valencia High Court has requested documents detailing how Calatrava was hired in private, without any publicity, for a convention center project in Castellon. For contracts over a certain minimum value, that is illegal in Spain.
| Aug 15, 2014
First look: RMJM’s 'jumping fish' tower design for the Chinese Riviera
The tower's fish-jumping gesture is meant to symbolize the prosperity and rapid transformation of Zhuhai, China.
| Aug 15, 2014
Periscope structure gives public toilet an unobstructed sea view
Polish architect Adam Wiercinski designs a public toilet with a periscope mechanism that gives visitors unobstructed views of the sea.
| Aug 14, 2014
8 do's and don'ts for completing an HVAC life cycle cost assessment
There are many hurdles to overcome when completing a life cycle cost assessment. RMF Engineering’s Seth Spangler offers some words of advice regarding LCCAs.
| Aug 14, 2014
Life cycle cost analysis using energy modeling
A life cycle cost analysis helps a school district decide which HVAC system to use in $198 million worth of future building projects.
| Aug 14, 2014
Museum of Mayan Culture draws inspiration from temple design [slideshow]
The Museo Maya de América in Guatemala City will be the world’s largest museum of Mayan history and culture, at 60,000 sf.