flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 19, 2013
Rank Company 2012 Reconstruction Revenue ($)
1 URS Corp. $292,591,405
2 STV $125,755,000
3 Wiss, Janney, Elstner Associates $72,500,000
4 Science Applications International Corp. $57,788,875
5 Middough $54,100,000
6 Dewberry $53,086,519
7 SSOE Group $52,518,417
8 Thornton Tomasetti $50,250,524
9 Syska Hennessy Group $49,258,501
10 AKF Group $45,000,000
11 Simpson Gumpertz & Heger $43,800,000
12 Buro Happold Consulting Engineers $38,844,000
13 Henderson Engineers $33,000,000
14 TTG $30,728,610
15 Environmental Systems Design $28,211,025
16 RDK Engineers $26,520,850
17 Smith Seckman Reid $21,167,725
18 H&A Architects & Engineers $20,982,548
19 Rolf Jensen & Associates $20,800,000
20 TLC Engineering for Architecture $20,577,575
21 RMF Engineering Design $18,698,000
22 Degenkolb Engineers $18,338,904
23 Ross & Baruzzini $17,765,787
24 Interface Engineering $16,895,439
25 Michael Baker Jr. $16,480,000
26 Bard, Rao + Athanas Consulting Engineers $15,500,000
27 Newcomb & Boyd $14,428,325
28 Coffman Engineers $14,200,000
29 KCI Technologies $13,432,000
30 ThermalTech Engineering $12,900,000
31 Affiliated Engineers $12,660,000
32 Glumac $12,633,000
33 Dunham Associates $12,500,000
34 Clark Nexsen $12,454,770
35 KPFF Consulting Engineers $11,000,000
36 Walker Parking Consultants $10,939,513
37 H.F. Lenz $10,796,600
38 Bergmann Associates $10,159,200
39 CCRD Partners $10,100,000
40 Allen & Shariff $10,000,000
41 Bridgers & Paxton Consulting Engineers $9,277,886
42 Merrick & Co. $9,000,000
43 Heapy Engineering $8,846,776
44 Sparling $8,518,471
45 Hixson Architecture, Engineering, Interiors $8,500,000
46 M-E Engineers $8,000,000
47 M/E Engineering $7,940,450
48 KLH Engineers $7,036,415
49 Peter Basso Associates $6,609,600
50 Bala Consulting Engineers $6,572,000
51 CTLGroup $5,500,000
52 Paulus, Sokolowski and Sartor $5,200,000
53 P2S Engineering $4,717,436
54 GRAEF $4,620,000
55 Rist-Frost-Shumway Engineering $4,300,000
56 Brinjac Engineering $4,018,072
57 Davis, Bowen & Friedel $3,616,428
58 Wallace Engineering $3,500,000
59 Kamm Consulting $3,313,597
60 OLA Consulting Engineers $3,200,000
61 Primera Engineers $2,990,000
62 Magnusson Klemencic Associates $2,719,958
63 FBA Engineering $2,160,000
64 Haynes Whaley Associates $639,876
65 Walter P Moore $320,431

 

Back to the Reconstruction Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Sep 6, 2013

U40 Summit featured speaker: Arthur Gensler on how to build a world-class AEC practice

Gensler, founder of the world’s largest architecture firm, will talk about the role of the architect in society, the impact of great design, and the practicalities of starting and running a practice, and will offer advice for today’s young design and construction professionals.

| Sep 4, 2013

Augmented reality: 12 applications for design and construction professionals

Building Design+Construction reached out to AEC professionals who have studied and applied augmented reality and asked them to pinpoint applications that are ripe for the technology. Here’s what they had to offer.

| Sep 4, 2013

Augmented reality goes mainstream: 12 applications for design and construction firms

Thanks to inexpensive mobile devices and increasingly advanced software apps, Building Teams are finally able to bring their BIM models to life on the job site. 

| Sep 4, 2013

K-12 school design that pays off for students

More and more educators are being influenced by the Reggio Emilia approach to pedagogy, with its mantra of “environment as the third teacher”—an approach that gives Building Teams a responsibility to pay even closer attention to the special needs of today’s schools.

| Sep 4, 2013

Smart building technology: Talking results at the BUILDINGChicago/ Greening the Heartland show

Recent advancements in technology are allowing owners to connect with facilities as never before, leveraging existing automation systems to achieve cost-effective energy improvements. This BUILDINGChicago presentation will feature Procter & Gamble’s smart building management program. 

| Sep 4, 2013

Last chance to pre-register for BUILDINGChicago/Greening the Heartland Conference at 20% savings

Attendees of the BUILDINGChicago/Greening the Heartland Expo and Conference can still save 20% off the at-site registration fee by registering online in these final days before the event opens on September 9 and concludes on September 11.

| Sep 3, 2013

'School in a box' project will place school in San Diego public library

Thinking outside the box, LPA Inc. is designing a school inside a box. With an emphasis on three E’s—Engage, Educate, and Empower—e3 Civic High is now being constructed on the sixth and seventh floors of a public library in downtown San Diego. Library patrons will be able to see into the school via glass elevators, but will not have physical access to the school.

| Sep 3, 2013

Delinquency rate for commercial real estate loans at lowest level in three years

The delinquency rate for US commercial real estate loans in CMBS dropped for the third straight month to 8.38%. This represents a 10-basis-point drop since July's reading and a 175-basis-point improvement from a year ago. 

| Sep 3, 2013

EDGE studio, GBBN announce merger

GBBN Architects and EDGE studio of Pittsburgh, Pennsylvania are very pleased to announce the merger of their firms under GBBN Architects effective September 1, 2013.

| Sep 3, 2013

Jon Pettit (1952-2013) - DLR Group Managing Principal

Jonathan (Jon) E. Pettit, AIA, died August 19, 2013 in Seattle following treatment for cancer. He was 61. Pettit was a DLR Group managing principal and practiced for his entire professional career with DLR Group. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021