flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 19, 2013
Rank Company 2012 Reconstruction Revenue ($)
1 URS Corp. $292,591,405
2 STV $125,755,000
3 Wiss, Janney, Elstner Associates $72,500,000
4 Science Applications International Corp. $57,788,875
5 Middough $54,100,000
6 Dewberry $53,086,519
7 SSOE Group $52,518,417
8 Thornton Tomasetti $50,250,524
9 Syska Hennessy Group $49,258,501
10 AKF Group $45,000,000
11 Simpson Gumpertz & Heger $43,800,000
12 Buro Happold Consulting Engineers $38,844,000
13 Henderson Engineers $33,000,000
14 TTG $30,728,610
15 Environmental Systems Design $28,211,025
16 RDK Engineers $26,520,850
17 Smith Seckman Reid $21,167,725
18 H&A Architects & Engineers $20,982,548
19 Rolf Jensen & Associates $20,800,000
20 TLC Engineering for Architecture $20,577,575
21 RMF Engineering Design $18,698,000
22 Degenkolb Engineers $18,338,904
23 Ross & Baruzzini $17,765,787
24 Interface Engineering $16,895,439
25 Michael Baker Jr. $16,480,000
26 Bard, Rao + Athanas Consulting Engineers $15,500,000
27 Newcomb & Boyd $14,428,325
28 Coffman Engineers $14,200,000
29 KCI Technologies $13,432,000
30 ThermalTech Engineering $12,900,000
31 Affiliated Engineers $12,660,000
32 Glumac $12,633,000
33 Dunham Associates $12,500,000
34 Clark Nexsen $12,454,770
35 KPFF Consulting Engineers $11,000,000
36 Walker Parking Consultants $10,939,513
37 H.F. Lenz $10,796,600
38 Bergmann Associates $10,159,200
39 CCRD Partners $10,100,000
40 Allen & Shariff $10,000,000
41 Bridgers & Paxton Consulting Engineers $9,277,886
42 Merrick & Co. $9,000,000
43 Heapy Engineering $8,846,776
44 Sparling $8,518,471
45 Hixson Architecture, Engineering, Interiors $8,500,000
46 M-E Engineers $8,000,000
47 M/E Engineering $7,940,450
48 KLH Engineers $7,036,415
49 Peter Basso Associates $6,609,600
50 Bala Consulting Engineers $6,572,000
51 CTLGroup $5,500,000
52 Paulus, Sokolowski and Sartor $5,200,000
53 P2S Engineering $4,717,436
54 GRAEF $4,620,000
55 Rist-Frost-Shumway Engineering $4,300,000
56 Brinjac Engineering $4,018,072
57 Davis, Bowen & Friedel $3,616,428
58 Wallace Engineering $3,500,000
59 Kamm Consulting $3,313,597
60 OLA Consulting Engineers $3,200,000
61 Primera Engineers $2,990,000
62 Magnusson Klemencic Associates $2,719,958
63 FBA Engineering $2,160,000
64 Haynes Whaley Associates $639,876
65 Walter P Moore $320,431

 

Back to the Reconstruction Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Mar 19, 2012

Smith Carter joins forces with Genivar

Smith Carter has a workforce of some 190 employees and designs complex buildings in challenging environments.

| Mar 19, 2012

HKS Selected for Baylor Medical Center at Waxahachie

Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records. 

| Mar 19, 2012

Mixed-use project redefines Midtown District in Plantation, Fla.

Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC. 

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Mar 16, 2012

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall. 

| Mar 16, 2012

Stego embarks on HPD Pilot Program

Vapor barrier manufacturer strives to provide better green choices to designers and builders.

| Mar 16, 2012

Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge

Architects in U.S. and abroad offered the chance to showcase their very best work.

| Mar 14, 2012

Hearing to decide fate of unfinished Harmon in Las Vegas under way

The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.

| Mar 14, 2012

Firestone names 2012 Master Contractor Award Winners

Annual award acknowledges industry’s top roofing professionals.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021