Reinventing an 80-acre open-air mall in a Calgary winter is no small undertaking.
But that’s exactly what Thermo Design Insulation was tasked with when transforming Deerfoot City Mall into a dynamic social hub that would alter the area’s retail landscape.
With Deerfoot City’s four zones — Food Lodge, Style District, Restaurant Campus and Central Plaza — the 1.1 million square foot property has something for everyone. Its 150 shops, services, and restaurants include everything from McDonald’s and Tim Hortons, to Sally’s Beauty Supply and LensCrafters, just to name a few.
Deerfoot City was faced with several challenges as it underwent this transformation. Not only did it intend to create a more structurally sound exterior with higher insulating values than its previous concrete material, but also the facility needed flexible building products that would make for a quick installation process in order to align with the project’s tight schedule. In addition, Deerfoot City needed materials that would bring its façade to life, matching the vibrant look and feel of the rebranded campus.
That’s why the company turned to Metl-Span and its CF Architectural insulated metal panels —products that now protect and define Calgary’s largest retail transformation.
“The envelope is the most critical part of the building,” said Tyson Jones, Thermo Design Insulation District Manager. “Metl-Span insulated metal panels provide design flexibility, without sacrificing performance.”
A Paneling Product for All Seasons
Metl-Span’s CF Architectural panels were specified to allow patrons to enjoy their social experience in the open-air mall, despite the daily winter temperatures that tend to be below freezing. The panels feature a Class 1 polyurethane foam core between two steel-face sheets to achieve peak thermal values.
Expansive transformations like the Deerfoot City Mall require installation flexibility, an important factor when frigid temperatures can dip below-30 degrees Celcius. Metl-Span’s CF Architectural panels can be installed in all weather conditions, keeping each phase of the project on time and on budget in Calgary’s harsh winter weather.
Deerfoot City also wanted its panels to match the upscale rebrand it was trying to achieve—without an expensive price tag. Metl-Span’s rich white (both Igloo White and Polar White) and complementary gray (Charcoal Gray, Regal Gray and Slate Gray) finishes with their trimless ends proved to be the ideal palettes to achieve the desired high-end and aluminum composite look of Deerfoot City’s new identity.
For more information on Metl-Span’s unique blend of high performance and aesthetically appealing products, visit metlspan.com/performance.
Related Stories
Sponsored | | Sep 30, 2014
How project managers can manage technology
Not long ago, the role of a construction project manager revolved around working with people: employees, vendors, consultants, designers, subcontractors and owners. Today, project managers primarily manage information. SPONSORED CONTENT
| Sep 24, 2014
5 business lessons from a 43-year Star veteran
Mary Ed Cain was supposed to be born a boy. That was the first time she surprised everyone. The second time came on a daily basis during her 43-year career at Star Building Systems. SPONSORED CONTENT
| Jul 21, 2014
16 utility questions to answer during your building project
We need electricity to power our building projects, along with water and gas and a faultless sanitation system. That’s what we think about when we think about utility requirements for our building project, but are we missing something? SPONSORED CONTENT
Sponsored | | Jul 17, 2014
A major hop forward
The construction of efficient metal buildings has helped Perrault Farms expand its hops-harvesting business.
| Jul 17, 2014
22 land questions to decide if your build site works
When you’re ready to build, land needs a serious amount of attention. Since it can singlehandedly shift your building plans, land must be investigated, questioned, and eyed from every angle. SPONSORED CONTENT
| Jul 9, 2014
The one misstep that could be slowing your company’s growth
Change. It’s inevitable. And success for any professional may very well depend on how well we adapt to it. SPONSORED CONTENT
| May 27, 2014
Contractors survey reveals improving construction market
The construction industry is on the road to recovery, according to a new survey by Metal Construction News. Most metrics improved from the previous year’s survey, including a 19.4% increase in the average annual gross contracting sales volume. SPONSORED CONTENT
| May 11, 2014
8 starter questions to answer when thinking about building
So, are you ready to start building? Completing these eight questions will help you answer that confidently. SPONSORED CONTENT
| Apr 25, 2014
A radiant barrier FAQ: Everything you wanted to know but were afraid to ask
There are many examples of materials developed for the space program making their way into everyday life and radiant barriers are just that. SPONSORED CONTENT
| Apr 17, 2014
6 details that can throw off your schedule
In 1997, Apple told us to “Think Different.” So we did. We thought about what could happen if the world went mobile, if information was boundless, if we could carry our office in our back pocket. We’ve grown to love different and to expect change. And when it comes to Apple products, that’s not such a bad thing. When it comes to your building order, however, it’s not nearly as appealing.