flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Rediscovered Mies van der Rohe design under construction at Indiana University

University Buildings

Rediscovered Mies van der Rohe design under construction at Indiana University

The design was originally created in 1952.


By David Malone, Associate Editor | June 21, 2021
Mies Building for the Eskenazi School of Art, Architecture + Design exterior under construction
Mies Building for the Eskenazi School of Art, Architecture + Design exterior under construction

A new shared facility for Indiana University’s Eskenazi School of Art, Architecture + Design is currently under construction on the Bloomington campus. The facility is being built from a rediscovered Mies van der Rohe design originally created in 1952.

The 10,000-sf, two-story building was adapted for contemporary use by Thomas Phifer and Partners and will sit at the center of the Bloomington campus. The Mies Building for the Eskenazi School of Art, Architecture + Design will be a 60-foot-wide, 140-foot-long rectangular structure with thin white-painted steel and expansive glass panes measuring 10 sf.

 

Mies Building for the Eskenazi School of Art, Architecture + Design exterior during construction

 

Floor-to-ceiling windows will wrap the entire second story to provide the impression of transparency throughout the building. The second floor will also feature a central exterior square atrium. Much of the lower level is open to the air, with the second, main story elevated above the ground plane.

 

SEE ALSO: The Scott A. McGregor Computer Science Center completes on Harvey Mudd College’s campus

 

The building design has a strong relationship with Mies van der Rohe’s Farnsworth House and the massing and form of many of his early concepts for building at the Illinois Institute of Technology.

The facility is scheduled to open in fall 2021.

 

Mies Building for the Eskenazi School of Art, Architecture + Design exterior central courtyard

Related Stories

| Jul 18, 2014

2014 Giants 300 Report

Building Design+Construction magazine's annual ranking the nation's largest architecture, engineering, and construction firms in the U.S.

| Jul 11, 2014

$44.5 million Centennial Hall opens at University of Wisconsin-Eau Claire

Centennial Hall houses the College of Education and Human Sciences and consolidates teacher education. It is the first new academic building on the UW-Eau Claire campus in more than 30 years.

| Jul 10, 2014

Berkeley Lab opens 'world's most comprehensive building efficiency simulator'

  DOE’s new FLEXLAB is a first-of-its-kind simulator that lets users test energy-efficient building systems individually or as an integrated system, under real-world conditions.

| Jul 9, 2014

Harvard Business School to build large-scale conference center

Expected to open in 2018, the facility will combine the elements of a large-scale conference center, a performance space, and an intimate community forum. The new building will be designed by Boston-based William Rawn and Associates.

| Jul 7, 2014

7 emerging design trends in brick buildings

From wild architectural shapes to unique color blends and pattern arrangements, these projects demonstrate the design possibilities of brick. 

Sponsored | | Jul 7, 2014

Channel glass illuminates science at the University of San Francisco

The University of San Francisco’s new John Lo Schiavo Center for Science and Innovation brings science to the forefront of academic life. Its glossy, three-story exterior invites students into the facility, and then flows sleekly down into the hillside where below-grade laboratories and classrooms make efficient use of space on the landlocked campus. 

| Jul 2, 2014

Emerging trends in commercial flooring

Rectangular tiles, digital graphic applications, the resurgence of terrazzo, and product transparency headline today’s commercial flooring trends.

| Jun 30, 2014

Research finds continued growth of design-build throughout United States

New research findings indicate that for the first time more than half of projects above $10 million are being completed through design-build project delivery. 

| Jun 18, 2014

Arup uses 3D printing to fabricate one-of-a-kind structural steel components

The firm's research shows that 3D printing has the potential to reduce costs, cut waste, and slash the carbon footprint of the construction sector.

| Jun 16, 2014

6 U.S. cities at the forefront of innovation districts

A new Brookings Institution study records the emergence of “competitive places that are also cool spaces.”

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021