flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Rediscovered Mies van der Rohe design under construction at Indiana University

University Buildings

Rediscovered Mies van der Rohe design under construction at Indiana University

The design was originally created in 1952.


By David Malone, Associate Editor | June 21, 2021
Mies Building for the Eskenazi School of Art, Architecture + Design exterior under construction
Mies Building for the Eskenazi School of Art, Architecture + Design exterior under construction

A new shared facility for Indiana University’s Eskenazi School of Art, Architecture + Design is currently under construction on the Bloomington campus. The facility is being built from a rediscovered Mies van der Rohe design originally created in 1952.

The 10,000-sf, two-story building was adapted for contemporary use by Thomas Phifer and Partners and will sit at the center of the Bloomington campus. The Mies Building for the Eskenazi School of Art, Architecture + Design will be a 60-foot-wide, 140-foot-long rectangular structure with thin white-painted steel and expansive glass panes measuring 10 sf.

 

Mies Building for the Eskenazi School of Art, Architecture + Design exterior during construction

 

Floor-to-ceiling windows will wrap the entire second story to provide the impression of transparency throughout the building. The second floor will also feature a central exterior square atrium. Much of the lower level is open to the air, with the second, main story elevated above the ground plane.

 

SEE ALSO: The Scott A. McGregor Computer Science Center completes on Harvey Mudd College’s campus

 

The building design has a strong relationship with Mies van der Rohe’s Farnsworth House and the massing and form of many of his early concepts for building at the Illinois Institute of Technology.

The facility is scheduled to open in fall 2021.

 

Mies Building for the Eskenazi School of Art, Architecture + Design exterior central courtyard

Related Stories

| Jun 8, 2012

Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex

Casaccio Yu Architects designed the 11,300-sf fitness and social complex.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| Jun 1, 2012

K-State Olathe Innovation Campus receives LEED Silver

Aspects of the design included a curtain wall and punched openings allowing natural light deep into the building, regional materials were used, which minimized the need for heavy hauling, and much of the final material included pre and post-consumer recycled content.

| May 31, 2012

2011 Reconstruction Award Profile: Seegers Student Union at Muhlenberg College

Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.

| May 31, 2012

New School’s University Center in NYC topped out

16-story will provide new focal point for campus.

| May 31, 2012

Perkins+Will-designed engineering building at University of Buffalo opens

Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021