flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Related Companies, LargaVista partner to develop mixed-use tower in SoHo

Related Companies, LargaVista partner to develop mixed-use tower in SoHo

The site is located at the gateway to the booming SoHo retail market, where Class A office space is scarce yet highly in demand.


By LargaVista | February 13, 2014

LargaVista Companies, a second generation real estate development, management and investment firm, and Related Companies have formed a joint venture partnership for the development of 300 Lafayette in SoHo.

The site contains the block front on East Houston Street, bounded by Lafayette and Crosby Streets in Manhattan, and will be transformed into a seven-story, mixed-use retail and office tower. The site is located at the gateway to the booming SoHo retail market, where Class A office space is scarce yet highly in demand.

The proposed development of 300 Lafayette Street, designed by COOKFOX Architects, consists of a distinctive 83,000-sf retail and boutique office building featuring floor-to-ceiling glazing set in terra-cotta and limestone frames. The environmentally friendly design incorporates a number of sustainable features and abundant outdoor space on several landscaped terraces.

 

 

"By joining forces with Related, we are introducing an exceptionally strong financial partner with proven expertise in delivering world-class properties like 300 Lafayette," said Marcello Porcelli, President of LargaVista. "This project will benefit tremendously from Related's wealth of experience in building and leasing some of the most complex projects and demanding designs in major markets throughout the globe."

The CBRE team of Mary Ann Tighe, CEO of the New York Tri-State Region, and Tom Duke, Vice President, served as real estate consultants to LargaVista at 300 Lafayette. Gregory Tosko, Vice Chairman, and Lauren Crowley, Vice President, joined the CBRE team advising LargaVista on this transaction.

 

Related Stories

| Nov 22, 2011

New Green Matters Conference examines emerging issues in concrete and sustainability

High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.

| Nov 22, 2011

Suffolk Construction selected as contractor for Boston luxury residential tower

Project team breaks ground on 488,000-sf building that will feature world-class amenities.

| Nov 22, 2011

Jones Lang LaSalle completes construction of two new stores in Manhattan

Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.

| Nov 21, 2011

Mortenson and enXco partnership to build its 19th wind project

The 8,500 acres project will generate140 megawatts of wind power – enough energy to power approximately 39,000 homes.

| Nov 21, 2011

FDH Engineering acquires Energy Solutions

All ESI employees have been merged into FDH’s staff at its St. Louis office.

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 17, 2011

SmithGroup changes name to SmithGroupJJR

SmithGroup and JJR join brands to become a single, multi-disciplinary company.

| Nov 17, 2011

Campus-wide energy-efficiency program aims to deliver $3.5 million in energy and operational savings

Merced College and Honeywell will use the school’s energy usage statistics to develop a course curriculum on sustainability, and raise awareness among students of the positive impact conservation practices contribute to the community.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021