flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Renowned sustainable architect Charles D. Knight to lead Cannon Design’s Phoenix office

Renowned sustainable architect Charles D. Knight to lead Cannon Design’s Phoenix office


March 14, 2011

Phoenix, AZ – March 8, 2011 - Cannon Design is pleased to announce that Charles D. Knight, AIA, CID, LEED AP, has joined the firm as principal. Knight will serve as the leader of the Phoenix office with a focus on advancing the firm’s healthcare practice.

Knight brings over 25 years of experience and is an internationally recognized architect who has won numerous awards for his unique contributions to the sustainable and humanistic design of healthcare facilities. His vast portfolio of work includes creating and financing socially responsible sustainable medical campuses, children’s hospitals, hospice facilities and private sector communities.  Knight’s passion to create sustainable and compassionate healthcare design is exemplified in the Sri Lanka Embassy Medical Center in Colombo.  This first off the grid, LEED Platinum Living Building, large scale medical center was designed for catastrophic events such as tsunami’s, earthquakes and flooding and to create life saving triage facility that stimulates economic growth while sustaining the environment. Knight is also proud of his many community contributions, including Adopt a Room, a privately held foundation specializing in environmentally positive patient rooms for terminally ill children. This project received the 2008 International Healthcare Design FAB Grand award and the 2008 FAB Healthcare award.  

 Prior to joining Cannon Design, Knight was Principal and Managing Director of Perkins + Will’s Minneapolis office—guiding the region’s strategic initiatives, as well as serving on its Board of Directors.  Knight’s professional affiliations include serving on the American Institute of Architects’ (AIA) Design/Research Committee, the AIA’s Competition Committee, and the Campus Architecture Landscape Architecture (CALA) Education Accreditation Committee.  An Associate of the Historic Architecture Society, he has also served as a Design Critic at the University of Illinois, University of Arizona, Oklahoma State University and the University of Minnesota.

A frequent featured worldwide speaker at architectural and sustainability forums, Knight has authored numerous books and articles for professional publications which include Architectural Record, Progressive Architecture, Building and Design, and Healthcare and Real Estate Review.  He holds both a Professional Bachelors of Architecture from Oklahoma State University and a Masters of Architecture from the University of Illinois.

Cannon Design is an Ideas Based Practice, ranked among the leading international firms in planning and design for healthcare, research, education, corporate, sports and government clients.  At present, the firm employs a staff of over 1,000, delivering services in 17 offices throughout North America, as well as in Shanghai, China, and Mumbai, India.

Related Stories

| Dec 17, 2010

Luxury condos built for privacy

A new luxury condominium tower in Los Angeles, The Carlyle has 24 floors with 78 units. Each of the four units on each floor has a private elevator foyer. The top three floors house six 5,000-sf penthouses that offer residents both indoor and outdoor living space. KMD Architects designed the 310,000-sf structure, and Elad Properties was project developer.

| Dec 17, 2010

Subway entrance designed to exude Hollywood charm

The Hollywood/Vine Metro portal and public plaza in Los Angeles provides an entrance to the Red Line subway and the W Hollywood Hotel. Local architect Rios Clementi Hale Studio designed the portal and plaza to flow with the landmark theaters and plazas that surround it.

| Dec 17, 2010

New engineering building goes for net-zero energy

A new $90 million, 250,000-sf classroom and laboratory facility with a 450-seat auditorium for the College of Electrical and Computer Engineering at the University of Illinois at Urbana/Champaign is aiming for LEED Platinum.

| Dec 17, 2010

Vietnam business center will combine office and residential space

The 300,000-sm VietinBank Business Center in Hanoi, Vietnam, designed by Foster + Partners, will have two commercial towers: the first, a 68-story, 362-meter office tower for the international headquarters of VietinBank; the second, a five-star hotel, spa, and serviced apartments. A seven-story podium with conference facilities, retail space, restaurants, and rooftop garden will connect the two towers. Eco-friendly features include using recycled heat from the center’s power plant to provide hot water, and installing water features and plants to improve indoor air quality. Turner Construction Co. is the general contractor.

| Dec 17, 2010

Toronto church converted for condos and shopping

Reserve Properties is transforming a 20th-century church into Bellefair Kew Beach Residences, a residential/retail complex in The Beach neighborhood of Toronto. Local architecture firm RAWdesign adapted the late Gothic-style church into a five-story condominium with 23 one- and two-bedroom units, including two-story penthouse suites. Six three-story townhouses also will be incorporated. The project will afford residents views of nearby Kew Gardens and Lake Ontario. One façade of the church was updated for retail shops.

| Dec 17, 2010

ARRA-funded Navy hospital aims for LEED Gold

The team of Clark/McCarthy, HKS Architects, and Wingler & Sharp are collaborating on the design of a new naval hospital at Camp Pendleton in Southern California. The $451 million project is the largest so far awarded by the U.S. Navy under the American Recovery and Reinvestment Act. The 500,000-sf, 67-bed hospital, to be located on a 70-acre site, will include facilities for emergency and primary care, specialty care clinics, surgery, and intensive care. The Building Team is targeting LEED Gold.

| Dec 17, 2010

Arizona outpatient cancer center to light a ‘lantern of hope’

Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.

| Dec 17, 2010

Cladding Do’s and Don’ts

A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.

| Dec 17, 2010

5 Tips on Building with SIPs

Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.

| Dec 17, 2010

How to Win More University Projects

University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021