Rental vs. purchase: How to minimize job site costs

Sponsored Content Contractors

Rental vs. purchase: How to minimize job site costs

Smart business decisions can mean the difference between being ‘on budget’ and going ‘way over’ budget.  


By CORT | September 5, 2016

Rental vs. purchase: How to minimize job site costs. Photo courtesy of CORT. 

With total U.S. construction starts projected to rise by 6 percent in 2016, the construction industry continues on its steady rise. Its expansion is contributing to an increase in corporate projects and profits. To make the most of the upturn, construction companies are having to focus on keeping costs low, working to allocate resources in the most efficient and effective manner possible.

As commercial and institutional building starts increase, it is essential to keep your company’s current projects on time and on budget, all while pursuing the market’s wealth of new leads. One way this challenge can be met is by exploring options that avoid investing time and money into purchasing and managing permanent assets.

There are many benefits to renting instead of purchasing assets for a construction site. Construction sites are dynamic, ever changing and require temporary workspaces to get the job done. Instead of purchasing resources to fill these transitory spaces, renting or leasing equipment that is needed for only the duration of the project can often reduce your company’s capital expenditures. Rental helps to ensure that your time and money is spent managing the projects, not the assets. Several kinds of on-site resources can be leased with these benefits.

For example, furniture rental is a viable alternative to purchasing permanent assets. Furniture rental eliminates the costs of storing on-site furniture between projects, making it an even more financially sound option. Its flexible nature allows you to avoid being stuck with outdated assets. As the needs of the construction site change, rented assets can easily be added or removed to match your company’s current situation, without jeopardizing your time or budget.

One of the greatest benefits of leasing over purchase is the reduced amount of time you are required to spend managing it. Its adaptable nature is designed to help you keep up with the fluctuating lifecycle of construction starts, without wasting your time.

Managing projects and budget is crucial to the success of construction companies. To learn more about how furniture rental can help on your next project, visit CORT.com.

Related Stories

| Nov 2, 2010

A Look Back at the Navy’s First LEED Gold

Building Design+Construction takes a retrospective tour of a pace-setting LEED project.

| Nov 2, 2010

Wind Power, Windy City-style

Building-integrated wind turbines lend a futuristic look to a parking structure in Chicago’s trendy River North neighborhood. Only time will tell how much power the wind devices will generate.

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021