flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

RETAIL GIANTS: Retailers and developers mix it up to stay relevant with shoppers

RETAIL GIANTS: Retailers and developers mix it up to stay relevant with shoppers

Retail is becoming closely aligned with entertainment, and malls that can be repositioned as lifestyle centers will have enhanced value.


By John Caulfield, Senior Editor | August 11, 2016

Cadillac House is definitely not your father's car dealership. The 12,000-sf showroom in New York City, part Cadillac's new corporate headquarters, includes an events runway and incubator space for visiting designers. Shawmut Design + Construction built it, Gensler designed it. Photo: @Chris Leonard, courtesy of Gensler.

When it debuted, in 1988, Fashion Mall, Plantation, Fla., was your typical anchor-driven retail leviathan. When it closed,  in 2006, Fashion Mall was typical of huge shopping centers' fall from grace with many customers. Its prospects for resurrection, though, brightened last year, when Encore Capital Management acquired the property and announced plans to spend $300 million to turn it into Plantation’s new town square, dubbed 321 North. 

TOP 90 RETAIL ARCHITECTURE FIRMS
Rank, Firm, 2015 Revenue
1. CallisonRTKL $205,964,000
2. Gensler $129,680,000
3. GreenbergFarrow $49,719,540
4. MG2 $45,652,293
5. Stantec $39,933,013
6. FRCH Design Worldwide $38,017,500
7. WD Partners $38,000,000
8. MBH Architects $28,126,062
9. NORR $20,326,054
10. P+R Architects $20,000,000

SEE FULL LIST

 

TOP 80 RETAIL CONSTRUCTION FIRMS
Rank, Firm, 2015 Revenue
1. VCC $574,787,663
2. PCL Construction Enterprises $556,581,503
3. Whiting-Turner Contracting Co., The $553,062,362
4. Shawmut Design and Construction $349,000,000
5. EMJ Corp. $287,137,603
6. Hoar Construction $235,377,000
7. dck worldwide $204,462,000
8. Turner Construction Co. $195,934,217
9. Beck Group, The $185,064,042
10. W.E. O’Neil Construction Co. $174,093,120

SEE FULL LIST

 

TOP 50 RETAIL ENGINEERING FIRMS
Rank, Firm, 2015 Revenue
1. Jacobs $167,960,000
2. Henderson Engineers $50,149,210
3. WSP | Parsons Brinckerhoff $33,622,000
4. Wiss, Janney, Elstner Associates $21,580,000
5. Core States Group $13,874,811
6. KLH Engineers $9,139,313
7. Wallace Engineering $8,200,000
8. Arup $7,105,331
9. Shive-Hattery $6,168,437
10. Highland Associates $5,900,000

SEE FULL LIST

Encore will bulldoze most of the mall, leave a nearby hotel and parking garage standing, and construct a 100,000-sf office tower, two apartment buildings totaling 700 units, and 73,000 sf of new retail space. 

In its latest Retail Investment Forecast, Marcus & Millichap singles out the enhanced value of malls that can be repositioned as “lifestyle centers.” For instance, A/E firm NORR is working on a 300,000-sf project in Detroit that will include 25,000 sf of retail, fast-casual restaurants, a hotel, and apartments, says NORR VP Anthony Ricciuti, RA, OAA, NCARB. 

Developers see malls as “part of a cocktail that creates a destination,” says Matt Billerbeck, AIA, SVP in CallisonRTKL’s Seattle office. His firm’s “Mall of the Future” report describes successful malls as walkable, transit accessible, anchored by food and experience, mixed use in nature, and connected to shoppers via smartphone and Internet-of-Things technology.

Successful retail is “more engaged with life on the street,” says Susanne Pini, HDR’s Director of Retail and Mixed-Use Practice. She points to the 864,000-sf, $200 million Woologong Central shopping center, 55 miles south of Sydney, Australia. Since its opening in 2014, 34 bars and restaurants have sprouted around it.  

TECHNOLOGY: the ENEMY becomes the ENABLER

The National Retail Federation estimates total retail sales will increase 3.1% in 2016 over last year. But bricks-and-mortar dealers continue to struggle, as evinced by bankruptcies (Sports Authority, Aeropostale) and bleak earnings reports (Macy’s, Nordstrom, Target). Online sales, now 7.7% of the total, could hit 11% by 2018, predicts Forrester Research. 

But dealers that once saw the Internet as a threat are finding ways to use technology. NORR’s Ricciuti says the Eastern Market in the Delta terminal at Detroit’s Metropolitan Airport is installing a “virtual maitre d,” an interactive hologram that will provide travelers with information and directions. 

“Technology and mobility have created a new paradigm, in which stores and online shopping represent a single strategy to reach customers,” says Margaux Jaffa, VP, VOA Associates. Online dealers Amazon, Warby Parker, and Birchbox are opening stores, following Apple’s wildly successful example.

“It’s all about the experience,” says Jim Scarpone, Director of Business Development, Shawmut Design + Construction. A recent Shawmut project—Ralph Lauren’s three-story, 38,000-sf Polo flagship store in New York—is piloting RFID-enabled fitting rooms and touch-screen mirrors that sync with the store’s inventory and point-of-sale systems.

The mirrors, devised by Oak Labs, read bar codes on clothing tags. Numbers pop up on the mirror and shoppers can call up item details, and try different colors and styles. Requests for help are delivered via iPad to an associate, who can send a text that appears on the mirror with his or her name and photo. 

The Oak Interactive Fitting Rooms can also provide dealers with tons of customer and inventory management data. 

Shawmut just completed work on Cadillac House, in New York’s SoHo district. The 12,000-sf auto dealership and showroom opened June 2. It has an incubator space for designers, a coffee bar, a runway, and an art gallery. “It’s not just about selling cars,” says Scarpone, “it’s about selling the brand.”

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

Urban Planning | Apr 12, 2024

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.

Laboratories | Apr 12, 2024

Life science construction completions will peak this year, then drop off substantially

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021