Rich Smith has been promoted to President of HEI. He will serve as a liaison to HEI’s clients and will be the primary public representative of the company. As President, Smith will focus on the overall vision and brand of the company. Additionally, Smith will remain heavily involved in business development and assisting with diversifying and growing the firm.
Duane Henderson will remain as CEO. He will continue to be involved in the daily operations and help lead of the company through the transition period. Henderson has been CEO since 1988; his father Fran founded the company in 1970.
Dave Haake has assumed the role of Chief Operations Officer. His responsibilities will include overseeing the daily operations of the company, including internal design teams, specialty divisions, and branch offices.
Dana Kettle has been promoted to Chief Financial Officer; she will oversee and manage all financial aspects of the firm.
Rick Lahm has stepped down as CFO, a position he has held since 1990. Lahm will assume the role of Board Treasurer.
Tony Pianalto has assumed the role of Chief Technical Officer. He will oversee and manage the technical engineering aspects of the firm, including quality control, training, standards, building information modeling, sustainability and commissioning.
“HEI’s Board of Directors examined the roles and organization of our company and interviewed key personnel through a six month discovery period,” said Duane Henderson, CEO. “We wanted to make sure we were taking into consideration our shareholders’ thoughts and ideas with regard to the future of the company.”
“The plan presented will allow for a smooth leadership transition for our company,” said Rich Smith, President. “I’m excited about the opportunity and the changes and feel it will strengthen the management structure as our firm continues to grow both regionally and nationally.”
About Henderson Engineers, Inc.
Henderson Engineers, Inc. was founded in 1970 and provides mechanical, electrical, plumbing and refrigeration design services through its headquarters in Kansas City, as well as branch offices in Bentonville, Dallas, Houston, Las Vegas, New York Metro, Philadelphia, Phoenix, and Tampa. Licensed in all 50 states, Henderson is comprised of over 450 employees including 150 Licensed Engineers and over 100 LEED® Accredited Professionals. In addition to its core services, Henderson Engineers, Inc. houses four specialty divisions: Impact Illumination (architectural lighting), Fire Dynamics (fire protection and code consulting), Collective Tech/ADG (comprehensive technology, security, audio visual, and acoustical design), and Outcome Cx (Commissioning). For more information visit www.hei-eng.com.
Related Stories
| Dec 17, 2010
Vietnam business center will combine office and residential space
The 300,000-sm VietinBank Business Center in Hanoi, Vietnam, designed by Foster + Partners, will have two commercial towers: the first, a 68-story, 362-meter office tower for the international headquarters of VietinBank; the second, a five-star hotel, spa, and serviced apartments. A seven-story podium with conference facilities, retail space, restaurants, and rooftop garden will connect the two towers. Eco-friendly features include using recycled heat from the center’s power plant to provide hot water, and installing water features and plants to improve indoor air quality. Turner Construction Co. is the general contractor.
| Dec 17, 2010
Toronto church converted for condos and shopping
Reserve Properties is transforming a 20th-century church into Bellefair Kew Beach Residences, a residential/retail complex in The Beach neighborhood of Toronto. Local architecture firm RAWdesign adapted the late Gothic-style church into a five-story condominium with 23 one- and two-bedroom units, including two-story penthouse suites. Six three-story townhouses also will be incorporated. The project will afford residents views of nearby Kew Gardens and Lake Ontario. One façade of the church was updated for retail shops.
| Dec 17, 2010
ARRA-funded Navy hospital aims for LEED Gold
The team of Clark/McCarthy, HKS Architects, and Wingler & Sharp are collaborating on the design of a new naval hospital at Camp Pendleton in Southern California. The $451 million project is the largest so far awarded by the U.S. Navy under the American Recovery and Reinvestment Act. The 500,000-sf, 67-bed hospital, to be located on a 70-acre site, will include facilities for emergency and primary care, specialty care clinics, surgery, and intensive care. The Building Team is targeting LEED Gold.
| Dec 17, 2010
Arizona outpatient cancer center to light a ‘lantern of hope’
Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.
| Dec 17, 2010
Cladding Do’s and Don’ts
A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.
| Dec 17, 2010
5 Tips on Building with SIPs
Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.
| Dec 17, 2010
How to Win More University Projects
University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.
| Dec 13, 2010
Energy efficiency No. 1 priority for commercial office tenants
Green building initiatives are a key influencer when tenants decide to sign a commercial real estate lease, according to a survey by GE Capital Real Estate. The survey, which was conducted over the past year and included more than 2,220 office tenants in the U.S., Canada, France, Germany, Sweden, the UK, Spain, and Japan, shows that energy efficiency remains the No. 1 priority in most countries. Also ranking near the top: waste reduction programs and indoor air.
| Dec 7, 2010
Are green building RFPs more important than contracts?
The Request for Proposal (RFP) process is key to managing a successful LEED project, according to Green Building Law Update. While most people think a contract is the key element to a successful construction project, successfully managing a LEED project requires a clear RFP that addresses many of the problems that can lead to litigation.