ICL, a global specialty minerals company with offices in Tel Aviv, Israel, and St. Louis, broke ground earlier this month on a $400 million battery materials manufacturing plant that, when it opens in 2025, will help meet demand from energy storage, electric vehicle, and clean-energy industries for products made in the U.S.
ICL’s investment in this plant was augmented by a $197 million grant from the U.S. Department of Energy, whose Secretary, Jennifer Granholm, was among the dignitaries attending the August 8 groundbreaking, who included Missouri Governor Mike Parson, and Jarod Boyd, Chief of Staff to St. Louis Mayor Tishaura Jones.
McCarthy Building Companies is the general contractor for the 140,000-sf facility, said to be the first commercial-scale plant of its kind in the U.S. Hargrove Engineers & Consultants is providing architecture, design and all engineering services outside of CE, which Castle is covering.
The facility is expected to produce 30,000 metric tons of lithium iron phosphate (LFP). (E Source, a research, consulting, and data sciences firm, projects global demand for iron phosphate-based cathode active materials to reach 3 million tons by 2031, with a market value of $40 billion.)
The plant will be situated on ICL’s existing Carondelet campus in St. Louis, and construction is expected to create between 800 and 900 union contractor jobs. ICL is also working with Aleees, a Taiwan-based LFP materials producer, to establish a localized, integrated, and sustainable LFP supply chain for U.S.-based customers.
Larger-scale plants under construction
The electrification movement, spurred by passage of the Inflation Reduction Act, is emerging as a building boom. Other plants under construction include LG Energy Solutions’ $1.7 billion, 1-million-sf electric vehicle battery manufacturing facility in Holland, Mich., which should be completed by next April. LG Energy Solutions benefits from a $189 million incentives package from the Michigan Economic Development Corporation.
Last May, LG Energy Solutions and Hyundai Motor Group announced plans to build a $4.3 billion EV battery plant in Bryan County in Georgia that is expected to bring 3,000 new jobs by the end of 2025, when it will start producing 300,000 batteries per year. The plant will be near Hyundai’s Metaplant America factory, also under construction, that will produce Hyundai-, Genesis-, and Kia-branded electric vehicles.
BMW Group’s 1-million-sf, $700 million high-voltage battery assembly plant, in Woodruff, S.C., broke ground last June. The new plant, on 315 acres, will support BMW’s car factory in Spartanburg, S.C. It is designed to be solar-ready, and will use collected rainwater to reduce its water consumption. The Woodruff plant is part of BMW’s latest $1.7 billion investment in South Carolina, and its construction includes a technology building, a cafeteria, a fire department, and energy center.
The Woodruff plant will get its battery cells from Tennessee-based Envision AESC US, which is building a $810 million, 1.5-million-sf cell plant in Florence, S.C.
Last April, General Motors and South Korea-based Samsung SDI revealed plans to invest more than $3 billion in an EV battery cell plant in the U.S. The plant, to be located in Carlisle, Ind., is expected to begin operations in 2026 and create 1,700 jobs, according to both companies.
GM and LG recently completed a battery-cell plant near Warren, Ohio, and reportedly have battery cell plants in the works in Tennessee and Michigan.
Related Stories
| Jul 7, 2014
7 emerging design trends in brick buildings
From wild architectural shapes to unique color blends and pattern arrangements, these projects demonstrate the design possibilities of brick.
| Jul 2, 2014
Emerging trends in commercial flooring
Rectangular tiles, digital graphic applications, the resurgence of terrazzo, and product transparency headline today’s commercial flooring trends.
| Jun 30, 2014
Report recommends making infrastructure upgrades a cabinet-level priority
The ASCE estimates that $3.6 trillion must be invested by 2020 to make critically needed upgrades and expansions of national infrastructure—and avoid trillions of dollars in lost business sales, exports, disposable income, and GDP.
Sponsored | | Jun 27, 2014
SAFTI FIRST Now Offers GPX Framing with Sunshade Connectors
For the Doolittle Maintenance Facility, SAFTI FIRST provided 60 minute, fire resistive wall openings in the exterior using SuperLite II-XL 60 insulated with low-e glazing in GPX Framing with a clear anodized finish.
| Jun 18, 2014
Arup uses 3D printing to fabricate one-of-a-kind structural steel components
The firm's research shows that 3D printing has the potential to reduce costs, cut waste, and slash the carbon footprint of the construction sector.
| Jun 16, 2014
6 U.S. cities at the forefront of innovation districts
A new Brookings Institution study records the emergence of “competitive places that are also cool spaces.”
| Jun 12, 2014
Austrian university develops 'inflatable' concrete dome method
Constructing a concrete dome is a costly process, but this may change soon. A team from the Vienna University of Technology has developed a method that allows concrete domes to form with the use of air and steel cables instead of expensive, timber supporting structures.
| May 29, 2014
7 cost-effective ways to make U.S. infrastructure more resilient
Moving critical elements to higher ground and designing for longer lifespans are just some of the ways cities and governments can make infrastructure more resilient to natural disasters and climate change, writes Richard Cavallaro, President of Skanska USA Civil.
| May 26, 2014
New Jersey data centers will manage loads with pods
The two data center facilities totaling almost 430,000 sf for owner Digital Realty Trust will use the company's TK-Flex planning module, allowing for 24 pods.
| May 22, 2014
BIM-driven prototype turns data centers into a kit of parts
Data center design specialist SPARCH creates a modular scheme for solutions provider Digital Realty.