Winners of the 2011 Contractor Project of the Year Competition were announced by Sika Sarnafil. Winners were judged on project complexity, design uniqueness, craftsmanship, and creative problem solving.
Winners include:
- TD Garden in Boston, Mass;
- Grand Harbor Condominium in Destin, Fla;
- New office complex in Warminster, Pa.; and
- Griffin Hall, Northern Kentucky University in Highland Heights, Ky.
A winner and two finalists in four different categories: Low Slope, Steep Slope, Waterproofing and Sustainability were recognized for outstanding workmanship in completing a project using a Sika Sarnafil thermoplastic membrane for roofing or waterproofing applications.
Low Slope Category Winners
Greenwood Industries, Inc. of Millbury, Mass. won first place in the Low Slope category for the re-roofing of the TD Garden, home to the Boston Bruins and Boston Celtics. The 19,600-seat arena has a distinctive barrel roof now covered with an energy-efficient Sika Sarnafil EnergySmart Roof System. During the project Greenwood worked around a continuous schedule of TD Garden events and even withstood a hurricane to complete the project. The second place winner was All Weather Waterproofing, Inc., Salt Lake City, Utah, for the Wilkinson Student Center at Brigham Young University, Provo, Utah. Third place went to Letner Roofing Company, Inc., Orange, Calif., for the Pacific Design Center “Red” Building in West Hollywood, Calif.
Steep Slope Category Winners
In the Steep Slope category, Bel-Mac Roofing, Inc., of Santa Rosa Beach, Fla., was awarded first place for their work on Grand Harbor Condominium in Destin, Fla. High winds, numerous roof levels, and a complex geometric roof design pushed the Bel-Mac crew. The company’s creative problem solving enabled them to install a watertight Sika Sarnafil Décor Roof System that preserves the upscale look established by the condo’s failed standing seam metal roof. Peach State Roofing, Inc., Lawrenceville, Ga., was the second place finisher for the Catholic Center at the University of Georgia, Athens, GA, and Diamond Roofing Company, Inc., Syracuse, N.Y., was the third place finalist for the Finger Lakes Residential Center in Lansing, N.Y.
Waterproofing Category Winners
Tecta America Zero Company, LLC, based in Cincinnati, Ohio, took first place in the Waterproofing class for Griffin Hall, Northern Kentucky University in Highland Heights, Ky. The company battled weather conditions and an aggressive schedule for this newly constructed facility, which involved three distinct roof areas and included a vegetated green roof protected by Sika Sarnafil’s G476 waterproofing membrane. Second place in this category went to A-1 Roofing Company, Elk Grove Village, Ill., for the United Cargo Facility in Chicago, and third place to CitiRoof Corporation in Columbia, Md., for the H.D. Woodson High School in Washington, D.C.
Sustainability Category Winners
In the Sustainability category, Delta Contracting Services, Inc., of East Brunswick, N.J., was awarded first place for a new office complex in Warminster, Pa. This facility received a very high worldwide LEED score for newly constructed office buildings and garnered a LEED Platinum Certification. In second place was Morris Roofing & Sheet Metal Corporation, Springfield, Mass., for the Mass Mutual headquarters in Springfield, Mass., and in third place for this grouping was Progressive Roofing, LLC, of Phoenix, Ariz. for the Wells Fargo Arena at Arizona State University in Tempe, Ariz. BD+C
Related Stories
Multifamily Housing | Apr 12, 2024
Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago
New 33-story Class A rental tower, designed by SCB, will offer 343 rental units.
Student Housing | Apr 12, 2024
Construction begins on Auburn University’s new first-year residence hall
The new first-year residence hall along Auburn University's Haley Concourse.
K-12 Schools | Apr 11, 2024
Eric Dinges named CEO of PBK
Eric Dinges named CEO of PBK Architects, Houston.
Construction Costs | Apr 11, 2024
Construction materials prices increase 0.4% in March 2024
Construction input prices increased 0.4% in March compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices also increased 0.4% for the month.
Healthcare Facilities | Apr 11, 2024
The just cause in behavioral health design: Make it right
NAC Architecture shares strategies for approaching behavioral health design collaboratively and thoughtfully, rather than simply applying a set of blanket rules.
K-12 Schools | Apr 10, 2024
A San Antonio school will provide early childhood education to a traditionally under-resourced region
In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.
University Buildings | Apr 10, 2024
Columbia University to begin construction on New York City’s first all-electric academic research building
Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces.
K-12 Schools | Apr 10, 2024
Surprise, surprise: Students excel in modernized K-12 school buildings
Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction?
Industrial Facilities | Apr 9, 2024
Confessions of a cold storage architect
Designing energy-efficient cold storage facilities that keep food safe and look beautiful takes special knowledge.
Cultural Facilities | Apr 8, 2024
Multipurpose sports facility will be first completed building at Obama Presidential Center
When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.