flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Rooftop solar energy program wins critical approval from L.A. city council

Rooftop solar energy program wins critical approval from L.A. city council

Los Angeles Business Council applauds decision allowing LADWP to create new national model for rooftop solar energy


By By BD+C Staff | April 6, 2012
The CLEAN LA Solar program will allow local property owners to sell solar power
The CLEAN LA Solar program will allow local property owners to sell solar power generated from rooftops and parking lots back to

The Los Angeles City Council cleared the way for the launch of a rooftop solar-energy program, approving a measure to allow the Department of Water and Power (DWP) to move forward with the groundbreaking CLEAN LA Solar program.

The CLEAN LA Solar program will allow local property owners to sell solar power generated from rooftops and parking lots back to the DWP, using a mechanism called a feed-in tariff, or FiT. Los Angeles will be the largest city in the nation to adopt such a program, which will supply renewable energy at a reasonable cost while spurring private investment, creating high-quality jobs, reducing greenhouse gas emissions, and helping the state and city meet renewable power requirements.

The Los Angeles Business Council (LABC) has been the leading advocate for the CLEAN LA Solar program since 2009. Research conducted by the LABC and the LABC Institute has demonstrated that enacting the full CLEAN LA Solar program, which includes a 150-megawatt FiT, will create 4,500 jobs, generate $500 million in economic activity and offset 2.25 million tons of carbon dioxide emissions by 2016. Recognizing this tremendous potential, a broad coalition of businesses, environmental groups, labor organizations and other groups have joined the LABC to support the plan.

Currently, most of L.A.’s renewable power is generated outside the L.A. basin and transmitted inefficiently to customers. By contrast, the CLEAN LA program will incentivize clean-energy production within city limits by taking advantage of L.A.’s vast, underused rooftop space. The result will be more efficient power delivery and meaningful local jobs in such areas such as solar sales, installation and maintenance. BD+C

Related Stories

| May 25, 2011

Low Impact Development: Managing Stormwater Runoff

Earn 1.0 AIA/CES HSW/SD learning units by studying this article and successfully passing the online exam.

| May 25, 2011

Register today for BD+C’s June 8th webinar on restoration and reconstruction projects

Based on new and award-winning building projects, this webinar presents our “expert faculty” to examine the key issues affecting project owners, designers and contractors in case studies ranging from gut renovations and adaptive reuses to restorations and retrofits.

| May 25, 2011

Hotel offers water beds on a grand scale

A semi-submerged resort hotel is the newest project from Giancarlo Zema, a Rome-based architect known for his organic maritime designs. The hotel spans one kilometer and has both land and sea portions.

| May 25, 2011

Smithsonian building $45 million green lab

Thanks to a $45 million federal appropriation to the Smithsonian Institution, the Smithsonian Environmental Research Center in Edgewater, Md., has broken ground on what is expected to be one of the most energy-efficient laboratories in the country. The 69,000-sf lab is targeting LEED Gold and is expected to use 37% less energy and emit 37% less carbon dioxide than a similar building.

| May 25, 2011

World’s tallest building now available in smaller size

Emaar Properties teamed up with LEGO to create a miniature version of the Burj Khalifa as part of the LEGO Architecture series. Currently, the LEGO Burj Khalifa is available only in Dubai, but come June 1, 2011, it will be available worldwide.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021