flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Rubin Museum of Art’s Mandala Lab set to open

Museums

The Rubin Museum of Art’s Mandala Lab set to open

The new space occupies the museum’s third floor.


By David Malone, Managing Editor | August 17, 2021
Mandala Lab breathing sculpture

Renderings courtesy PRO

The Mandala Lab, the Rubin Museum of Art’s new interactive space for social, emotional, and ethical learning, is set to open to the public on Sept. 24.

The lab is located on the remodeled third floor and was designed by Peterson Rich Office (PRO). The Mandala Lab invites visitors to participate in five experiences. These experiences feature videos accompanied by scents, a site-specific commissioned sculpture that invites collective breathing, and curated percussion instruments dipped in water. Each activity looks to harness the power of difficult emotions and offer pathways to develop resilience, calmness, and connection. The new space also functions as the home for School and Family Programs, which connect younger generations to the teaching expressed in Himalayan art through social, emotional, and ethical learning.

 

Mandala Lab gong orchestra

 

Each activity on the floor is envisioned as a sensorial experience and takes inspiration from Buddhist principles that focus on self-awareness and the awareness of others. Visitors can engage with a scent and memory library, participate in a synchronized breathing activity, and take part in a gong orchestra with eight gongs suspended over water.

As visitors move through the lab they will examine the feelings of pride, attachment, envy, anger, and ignorance. Visitors will then be invited to experiment and attempt to transform these emotional states into a complementary wisdom. It is in this way that the Mandala Lab aims to offer tools and new perspectives for coping with the day-to-day challenges and emotional burdens brought about by personal and societal complexities.

 

Mandala Lab lab space

 

Highlights of the design include:

- a 2,700-sf multipurpose open floor plan bounded by light that converts for education, exhibition, and event needs

- fine metal mesh partitions that surround the spiral staircase and divide the space into four quadrants

- an alcove with rounded walls and acoustic panels where content can be deployed with a wide, drop-down projection screen

- flexible space for lights-on learning with tables and chairs.

The new Mandala Lab is set to open with a free admission weekend spanning Sept. 24-26.

 

Mandala Lab interactive display

 

Mandala Lab library view

Tags

Related Stories

Architects | Jan 15, 2016

Best in Architecture: 18 projects named AIA Institute Honor Award winners

Morphosis' Perot Museum and Studio Gang's WMS Boathouse are among the projects to win AIA's highest honor for architecture.

| Jan 14, 2016

How to succeed with EIFS: exterior insulation and finish systems

This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.

Museums | Dec 18, 2015

Santiago Calatrava-designed museum with skeletal roof opens in Rio

The Museu do Amanhã addresses the future of the planet and has an inventive, futuristic design itself.

Museums | Dec 16, 2015

Gluckman Tang-designed museums could stimulate economy in North Adams, Mass.

The goal is to create a “cultural corridor” between North Adams and Williamstown, Mass.  

Museums | Dec 4, 2015

Calatrava’s Milwaukee Art Museum gets handsome addition by HGA

The lakefront addition gives visitors expansive views both inside and out.

Museums | Dec 3, 2015

SANAA’s design selected for Hungary’s new National Gallery and Ludwig Museum

After months of deliberation, the Japanese firm ultimately won the tie with Snøhetta.

Museums | Nov 23, 2015

Daniel Libeskind unveils design for new Lithuanian modern art museum

Located in the national capital of Vilnius, the Modern Art Center will be home to 4,000 works of Lithuanian art.

Museums | Nov 11, 2015

MVRDV designs a ‘disco ball’ for Rotterdam

Called the Collectiegebouw (Dutch for "collection building"), the building will make public the city’s extensive art collection, and give visitors a look at how museums work backstage, according to Fast Company.

Museums | Nov 10, 2015

U.S. Holocaust Memorial Museum breaks ground on Collections and Conservation Center

Designed by SmithGroupJJR, the David and Fela Shapell Family Collections and Conservation Center will provide long-term, secure preservation for evidence of the Holocaust.

Museums | Nov 6, 2015

Studio Gang designs sculpted science center for the American Museum of Natural History

The Richard Gilder Center for Science, Education, and Innovation will hold areas where visitors can engage with high-tech tools, such as gene mapping, 3D imaging, and big data assimilation and visualization, all to learn about the current state of scientific research.

boombox1
boombox2
native1

More In Category

Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.




Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021