flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Rudolph and Sletten, Inc. wins CMAA award

Rudolph and Sletten, Inc. wins CMAA award

Firm recognized for the renovation of Grossmont-Cuyamaca Community College’s Student Administrative & Griffin Student Center.


By Posted by Tim Gregorski, Senior Editor | May 3, 2012

Rudolph and Sletten, Inc. has been recognized by the Construction Management Association of America (CMAA), San Diego Chapter for the renovation of Grossmont-Cuyamaca Community College’s Student Administrative & Griffin Student Center.

The Project Achievement Award, which recognizes outstanding achievement in construction management, is presented to Rudolph and Sletten in the category of Building Renovations Greater than $10 Million.

 The 84,000-sf two facility project was completed by Rudolph and Sletten January 2012. The Griffin Student Center included a 27,000-sf renovation of the existing building as well as a 20,000-sf expansion. The new center features student meeting rooms, food stations, a health services department and a 10-foot movie screen in the lobby. The Student Administrative Building was an existing 21,000-sf wood framed structure that was expanded to 38,000-square-feet. The expansion includes enclosing the interior courtyard, breezeway areas and converting into interior space. These buildings comprise the first LEED-certified project in the Grossmont-Cuyumaca Community College District. BD+C

Related Stories

| May 25, 2011

Low Impact Development: Managing Stormwater Runoff

Earn 1.0 AIA/CES HSW/SD learning units by studying this article and successfully passing the online exam.

| May 25, 2011

Register today for BD+C’s June 8th webinar on restoration and reconstruction projects

Based on new and award-winning building projects, this webinar presents our “expert faculty” to examine the key issues affecting project owners, designers and contractors in case studies ranging from gut renovations and adaptive reuses to restorations and retrofits.

| May 25, 2011

Hotel offers water beds on a grand scale

A semi-submerged resort hotel is the newest project from Giancarlo Zema, a Rome-based architect known for his organic maritime designs. The hotel spans one kilometer and has both land and sea portions.

| May 25, 2011

Smithsonian building $45 million green lab

Thanks to a $45 million federal appropriation to the Smithsonian Institution, the Smithsonian Environmental Research Center in Edgewater, Md., has broken ground on what is expected to be one of the most energy-efficient laboratories in the country. The 69,000-sf lab is targeting LEED Gold and is expected to use 37% less energy and emit 37% less carbon dioxide than a similar building.

| May 25, 2011

World’s tallest building now available in smaller size

Emaar Properties teamed up with LEGO to create a miniature version of the Burj Khalifa as part of the LEGO Architecture series. Currently, the LEGO Burj Khalifa is available only in Dubai, but come June 1, 2011, it will be available worldwide.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021