flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Sac State’s new science complex and planetarium nears completion

University Buildings

Sac State’s new science complex and planetarium nears completion

CO Architects designed the facility.


By David Malone, Associate Editor | July 11, 2018
Ernest E. Tschannen science complex
Ernest E. Tschannen science complex

California State University, Sacramento’s (Sac State) new 96,631-sf Ernest E. Tschannen Science Complex recently had its ceremonial topping out event. The five-story complex on the banks of the American River will feature an energy-efficient design and abundant natural light with laboratory space for the College of Natural Sciences and Mathematics.

Dubbed the Ernest E. Tschannen Science Complex, the CO Architects-designed $91.5 million building’s façade is inspired by the rippling effect created when a stone is tossed into water. The planetarium and its 2,500-sf dome, located at the building’s inward inflection point, is meant to represent the stone’s impact, with the patterned window system radiating outward to emulate the ripples.

 

Sac State Science ComplexCourtesy CO Architects.

 

The complex’s instructional laboratories will have large expanses of glass adjacent to public corridors to display the work occurring within and connect students and faculty. The corridors branch out from naturally lit central lobbies on each floor. Students can use these central lobbies to collaborate and study. An observatory is accessible from the rooftop and will feature a retractable roof and two telescopes.

 

The Planetarium at Sac State Science COmplexCourtesy CO Architects.

 

The landscape was also designed to be able to double as a teaching tool where biologists and botanists can experiment and teach outside of their labs. An outdoor plaza will offer additional space to gather, study, or rest. Additionally, a green roof will be accessible from a continuous ramp and stairs.

 

See Also: NC State University’s transparent engineering building has ‘engineering on display’ around every corner

 

The Ernest E. Tschannen Science Complex is targeting LEED gold certification and is slated for completion in June 2019. The Build Team includes Sundt Construction, P2S Inc. (MEP), Buehler & Buehler Structural Engineers (SE), Cunningham Engineering (CE, landscape architecture).

 

Aerial rendering of the Sac State Science ComplexCourtesy CO Architects.

 

Sac State Science compelxCourtesy CO Architects.

Related Stories

Energy-Efficient Design | Mar 20, 2018

University of Hawaii Maui College on pace to become first U.S. campus to generate 100% renewable energy on-site

The project is part of a partnership with Johnson Controls and Pacific Current that will also allow four UH community college campuses on Oahu to significantly reduce their fossil fuel consumption.

University Buildings | Feb 16, 2018

The University of Washington receives a new Nanoengineering and Sciences Building

The building marks the second phase of a 168,000-sf complex.

University Buildings | Jan 31, 2018

Report: Spending spree on new buildings a risky venture for some U.S. universities

Higher education institutions continue to add new buildings in spite of increased stress on facilities management budgets, according to a new report from Sightlines.

Healthcare Facilities | Jan 29, 2018

The new Virginia Tech Biomedical Research Addition will include research facilities in five thematic areas

The project is a collaboration between Carilion Clinic and Virginia Tech.

University Buildings | Jan 19, 2018

A 360-degree classroom highlights Washington State University’s new academic innovation hub

The circle-in-the-round classroom can accommodate 275 students.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021