flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SAFTI FIRST announces 3D Autodesk Revit models for fire rated wall, window, and door systems

SAFTI FIRST announces 3D Autodesk Revit models for fire rated wall, window, and door systems

Intelligent, 3D models can be downloaded from www.safti.com and Autodesk Seek


May 6, 2013

SAFTI FIRST, leading USA-manufacturer of fire rated glass and faming systems, is proud to announce that Autodesk Revit models are now available for its fire rated walls, window and door systems via www.safti.com and Autodesk Seek.  These data-rich, intelligent 3-D models comply with the Revit Model Content Style Guide (RMCSG) version 2.1.

“We’re finding that more and more architects are adopting BIM (Building Information Modeling) in their design and specification process,” says Diana San Diego, Director of Marketing for SAFTI FIRST.  “By providing compliant Revit® models on our fire rated glass and framing assemblies, we are able to meet their needs in more efficient and effective manner.”

For more information, visit www.safti.com or call 888.653.3333.

About SAFTI FIRST
Founded in 1981, SAFTI FIRST Fire Rated Glazing Solutions (www.safti.com) has been serving the architectural and building communities and is the recognized leader in manufacturing fire rated glass and framing for over 30 years.  As the premier source for fire-rated glazing, SAFTI FIRST was the first to introduce transparent fire rated walls to the U.S. market. Our SuperLite™ product line, fire rated from 20 minutes to three hours, includes fire-retardant filled glass units, safety ceramics, safety wired glass and SuperLite I-XL, a patented breakthrough fire protective  product that significantly reduces radiant heat transfer (does not meet ASTM E119 and requires AHJ approval for 45 and 60 minute applications).  SuperLite™ products can protect against noise, attack, impact, bullets, blast, hurricane and UV rays and is available in any custom architectural make-up, including enhanced energy performance applications.  SAFTIfire GPX Framing is fire rated from 20 minutes to 2 hours.  Our products are manufactured in the U.S. for fast lead times.  For more information, call 888.653.3333.

Autodesk , Autodesk (logo),and Revit are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries.

Related Stories

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

| Aug 9, 2012

DSGW Architects welcomes new employees

Three new employees located in DSGW's Duluth office.

| Aug 9, 2012

DMR Architects converts bank building to municipal court

The project consisted of a $4 million renovation to a 2-story building totaling 13,000-sf.

| Aug 8, 2012

BD+C wins six B2B journalism awards

BD+C wins two national awards, three regional awards, and a regional Graphical Excellence award.

| Aug 8, 2012

BIM’s future up in the cloud

The AEC industry is on the cusp of a still more significant evolution with cloud computing.

| Aug 8, 2012

Giants 300 Sports Facilities Report

BD+C's Giants 300 Top 25 AEC Firms in the Sports Facilities sector.

| Aug 8, 2012

Giants 300 Science & Technology Report

BD+C's Giants 300 Top 25 AEC Firms in the Science & Technology sector.

| Aug 7, 2012

Pioneering revival

Financial setbacks didn’t stop this Building Team from transforming the country’s first women’s medical school into a new home for college students.

| Aug 7, 2012

Shedding light on the arts

Renovating Pietro Belluschi’s Juilliard School opens the once-cloistered institution to its Upper West Side community.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021