In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.
Slated for completion by summer 2025, the South Education Center aims to provide access to high-quality early childhood education for the southeast side of San Antonio—a traditionally under-resourced region and an area identified as a childcare desert.
In recent years, south and southeast San Antonio has seen a decline in high-quality childcare options, especially for families with kids 4 years and younger, according to a press statement from Pre-K 4 SA and HOLT Group.
The design by RDG Planning+Design offers abundant light throughout the building. The center’s colors and natural materials, such as stone, wood, and green walls, were inspired by the local landscape, culture, and landmarks, including the San Fernando Cathedral.
Each space in the center has been designed to foster young children’s growth and development and encourage learning through play. Every classroom offers direct access to outdoor porch settings and play areas. All exterior play areas are shielded by the building to create a safe environment away from busy streets and parking lots.
“This school takes inspiration from the natural surroundings and the cultural vibrancy of San Antonio, seamlessly integrating indoor and outdoor spaces to create an engaging, enriching place for young learners,” Antonio Plascencia, principal senior designer, said in a statement.
The state-of-the-art facility features modern classrooms equipped to meet the highest early childhood education standards. Specialized spaces will support families, teacher collaboration, and interactive learning and play-based activities.
On the Building Team:
Owner/developer: Holt Texas, Ltd.
Design architect: RDG Planning+Design
Architect of record: Pfluger Architects
MEP engineer: Cleary Zimmermann Engineers
Structural engineer: Lundy & Franke Engineering
General contractor: G.W. Mitchell Construction
Landscaping: Rialto Studio
Technology: Combs Consulting Group
Related Stories
K-12 Schools | Aug 1, 2017
This new high school is the first to be built on a tech company’s campus
Design Tech High School, located on Oracle Corporation’s Headquarters campus, will span 64,000 sf across two stories and have a capacity of 550 students.
Education Facilities | Jul 14, 2017
Youth education center in Baltimore gets first students
Students learn environmental skills, natural resource management, urban agriculture, and water quality monitoring.
Great Solutions | Jul 12, 2017
The writing on the wall: Maker spaces encourage students to take an active role
Maker spaces, dry-erase walls, and flexible furniture highlight Kinkaid’s new Learning Center.
Building Team Awards | Jun 7, 2017
Rebuilding to heal: Sandy Hook Elementary School
Gold Award: Community involvement was paramount as Newtown, Conn., replaced the school where a mass shooting occurred.
K-12 Schools | Jun 5, 2017
PK-8 school will be Denver’s first CHPS-certified building
A “learning stair” will connect the cafeteria to the main level.
K-12 Schools | May 31, 2017
NAC Architecture rolls out ‘Hack Your Classroom’ campaign
In collaboration with room2learn, NAC launched a campaign aimed at crowd-sourcing information on what teachers are doing in their classroom to improve the learning experience.
K-12 Schools | May 16, 2017
The future of schools: Net zero should be the norm
Students are helping drive change by focusing on the future.
K-12 Schools | May 1, 2017
Seattle’s first vertically-oriented middle school breaks ground
The building will provide 74,289 sf of space across its five-story classroom bar.
K-12 Schools | Apr 21, 2017
The stadium effect
School districts that invested in their athletic facilities over the last few years have seen a tremendous increase in student morale and health, growth in campus culture, and excitement within their communities.
K-12 Schools | Apr 7, 2017
Is an alternative project delivery method right for your K-12 school district?
With California’s increasingly busy—and costly—construction market, it’s becoming more difficult to predict costs with a typical design-bid-build delivery method.