flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SGH’s Applied Science & Research Center achieves ISO 17025 accreditation for concrete testing procedures

Concrete Technology

SGH’s Applied Science & Research Center achieves ISO 17025 accreditation for concrete testing procedures

These procedures, conducted in SGH’s Waltham, MA, headquarters, went through a stringent evaluation process with A2LA professionals observing and auditing the facility in 2022 and will be reaudited biannually.


By SGH | April 19, 2022
SGH Headquarters
The Applied Science & Research Center at Simpson Gumpertz & Heger’s headquarters in Waltham, MA. Courtesy SGH.

Simpson Gumpertz & Heger’s (SGH) Applied Science & Research Center recently received ISO/IEC17025 accreditation from the American Association for Laboratory Accreditation (A2LA) for several concrete testing methods. These procedures, conducted in SGH’s Waltham, MA, headquarters, went through a stringent evaluation process with A2LA professionals observing and auditing the facility in 2022 and will be reaudited biannually. Achieving this accreditation (Certificate Number: 6551.01) affirms SGH’s commitment to quality and allows us to continue enhancing the services we provide to our clients and peers across the industry.

“I am impressed every day at the breadth and depth of our testing capabilities,” said Norman Perkins, SGH Director of Applied Science and Research. “Our technical professionals and laboratory staff continue to grow their expertise in physical testing, environmental simulations, materials science, microscopy, and research partnerships, and allow us to serve our clients throughout all phases of a project.”

The ISO/IEC 17025 accreditation focuses on quality requirements specific to laboratory testing and ensures that recipients have the correct policies, procedures, equipment, and training in place.

SGH’s Applied Science & Research Center
Concrete testing in SGH’s Applied Science & Research Center. Courtesy SGH.

The recognized testing methods focus primarily on concrete:

ASTM C39 - Compressive Strength of Cylindrical Concrete Specimens
ASTM C42 - Obtaining and Testing Drilled Cores and Sawed Beams of Concrete
ASTM C138 - Density, Yield, and Air Content of Concrete
ASTM C143 - Slump of Hydraulic Cement Concrete
ASTM C192 - Making and Curing Concrete Test Specimens in the Laboratory
ASTM C231 - Air Content of Freshly Mixed Concrete by the Pressure Method
ASTM C566 - Total Evaporable Moisture Content of Aggregates by Drying
ASTM C469 - Static Modulus of Elasticity and Poisson’s Ratio of Concrete in Compression
ASTM C1064 - Temperature of Freshly Mixed Hydraulic Cement Concrete

“Our laboratory, its staff, and all our engineers are constantly finding ways to push the boundaries of our testing capabilities,” said Niklas Vigener, SGH Chief Technical Officer. “This accreditation is another example of how we are able to partner with our clients and peers in the AEC industry and beyond.”

SGH’s 13,500 sq ft in-house laboratory facilities allow us to develop and execute comprehensive testing and research plans to better understand how materials, components, and systems behave. Our technical professionals partner with team members in the center to identify project goals, develop testing protocols, interpret results, and advance client solutions. 

Related Stories

| Mar 14, 2012

Hearing to decide fate of unfinished Harmon in Las Vegas under way

The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.

| Feb 22, 2012

ACI BIM manual for cast-in-place concrete in development

The improved communication, coordination, and collaboration afforded by BIM implementation have already been shown to save time and money in projects.

| Feb 17, 2012

Tremco Inc. headquarters achieves LEED Gold certification

Changes were so extensive that the certification is for new construction and not for renovation; officially, the building is LEED-NC.

| Jan 26, 2012

World of Concrete 2012: A tinge of optimism

Cement consumption is expected to increase significantly in 2013, the first time an increase has been predicted in the past five years.

| Jan 8, 2012

TCA releases The Construction of Tilt-Up

The newest publication from the TCA is the second in a planned trilogy of resources covering the architecture, engineering and construction of Tilt-Up

| Jan 4, 2012

HDR to design North America’s first fully digital hospital

Humber River  is the first hospital in North America to fully integrate and automate all of its processes; everything is done digitally.

| Jan 3, 2012

AIA Course: New Developments in Concrete Construction

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 14, 2011

Belfer Research Building tops out in New York

Hundreds of construction trades people celebrate reaching the top of concrete structure for facility that will accelerate treatments and cures at world-renowned institution.

| Dec 12, 2011

CRSI design awards deadline extended to December 31

The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021