USG Corporation, a leading building products company and the industry innovator in lightweight drywall, is pleased to announce that its award-winning SHEETROCK® UltraLight Panels are now ICC Evaluation Services compliant for installation on ceilings with the long edges parallel to the framing.
“SHEETROCK® Brand UltraLight Panels, already the lightest 1/2" panels available on the market today, just got even better,” said Diane Earll, senior director, wallboard product management, USG Building Systems. “We are thrilled that our customers can use just one lightweight panel for walls and ceilings, creating less waste and faster installations.”
SHEETROCK® Brand UltraLight Panels are the only lightweight wallboard on the market today that is International Code Council Evaluation Services compliant under report number #3365 (ICC ESR-3365) for installation on ceilings with the long edges parallel to 24" O.C. framing with overlaid insulation and water-based textures. The panels remain up to 30 percent lighter, making them easier to carry and install, without sacrificing the high quality of the SHEETROCK® brand.
“For 110 years, USG has been leading the innovation of new building materials,” Earll says. “Our SHEETROCK® Brand UltraLight Panels are yet another example of our ongoing commitment to improve safety, efficiency, and the use of green materials in the construction industry.”
Lighter weight, superior sag-resistance and greater strength are just some of the advantages of SHEETROCK® Brand UltraLight Panels.
Additional benefits include:
- Cleaner score and snap
- Complies with International Building Code and ASTM C1396 requirements for 1/2" gypsum wallboard and 1/2" gypsum ceiling board.
- Up to 30 percent lighter or 15-24 pounds less per panel depending on length.
- Made with up to 95 percent recycled content and save approximately 20 percent in fuel consumption because more can be shipped per truck. In addition, the panels qualify as a low-VOC emitting material.
For information about SHEETROCK® Brand UltraLight Panels, please visit www.theweighthasbeenlifted.com or www.USG.com.
USG Corporation is a manufacturer and distributor of high-performance building systems through its United States Gypsum Company, USG Interiors, LLC, L&W Supply Corporation and other subsidiaries. Headquartered in Chicago, USG worldwide operations serve the residential and non-residential construction markets, repair and remodel construction markets, and industrial processes. USG wall, ceiling, flooring and roofing products provide leading-edge building solutions for customers, while L&W Supply center locations efficiently stock and deliver building materials nationwide. For additional information, visit www.usg.com.
Related Stories
| Sep 12, 2011
Morgan Thermal Ceramics’ system for installing grease duct enclosures achieves UL listing
Updated installation results in 33% space savings.
| Sep 9, 2011
Kauffman Center for the Performing Arts in Kansas City opens this month
Theatre Projects played the lead role in theatre design and planning as well as in engineering the customized theatre equipment. BNIM in Kansas City served as the executive architect.
| Aug 23, 2011
Acoustical design education model
Pass this exam and earn 1.0 AIA/CES Discovery learning units. You must go to www.BDCnetwork.com/EnhancedAcousticalDesign to take this exam.
| Aug 19, 2011
Enhanced acoustical design
Ambient noise levels in some facility types are trending up and becoming a barrier to clear communication between building occupants.
| Jun 1, 2011
Low-energy fans help combat disease in Rwandan clinic
Isis fans from Big Ass Fan Co. help kill airborne pathogens in Rwanda’s Butaro Health Clinic by passing air over UV lights.
| Nov 3, 2010
Sailing center sets course for energy efficiency, sustainability
The Milwaukee (Wis.) Community Sailing Center’s new facility on Lake Michigan counts a geothermal heating and cooling system among its sustainable features. The facility was designed for the nonprofit instructional sailing organization with energy efficiency and low operating costs in mind.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 12, 2010
Gartner Auditorium, Cleveland Museum of Art
27th Annual Reconstruction Awards—Silver Award. Gartner Auditorium was originally designed by Marcel Breuer and completed, in 1971, as part of his Education Wing at the Cleveland Museum of Art. Despite that lofty provenance, the Gartner was never a perfect music venue.