Project name: Silver Spring Civic Center
Submitting firm: Costello Construction of Maryland, Inc.
Products:
- Acoustical panels: Armstrong Panels
- Brick and masonry: McAvoy Brick, Quikcrete Grout
- Cabinetry: Custom made
- Carpet/carpet tiles: Armstrong/Milliken
- Ceilings: Chicago Metallic
- Coatings: Dow Corning, Grancem
- Concrete products and systems: Custom
- Countertop surfacing: Wilsonart
- Door hardware/locksets: Hager, Best, Adams Rite, Von Duprin, Lund, Knox, Rockwood, Locknetics, Stanley
- Doors: Architectural Wood Doors:
- Flooring products (see also carpet/carpet tiles): Bambex (bamboo), Solnhofen Stone, Daltile Stone
- Glass/glazing: Oldcastle Glass
- Gypsum board and products: National Gypsum Company, Georgia-Pacific sheathing
- Paints/finishes/coatings: Glidden, Ultrahide, Devoe Coatings
Related Stories
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.
| Jan 31, 2012
Fusion Facilities: 8 reasons to consolidate multiple functions under one roof
‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series on the design and construction of university facilities.
| Jan 24, 2012
U of M installs new lighting at Crisler Player Development Center
Energy efficient lighting installed at PDC reduce costs and improves player performance.
| Jan 6, 2012
New Walgreen's represents an architectural departure
The structure's exterior is a major departure from the corporate image of a traditional Walgreens design.
| Dec 7, 2011
ICS Builders and BKSK Architects complete St. Hilda’s House in Manhattan
The facility's design highlights the inherent link between environmental consciousness and religious reverence.
| Dec 5, 2011
SchenkelShultz Architecture designs Dr. Phillips Charities Headquarters building in Orlando
The building incorporates sustainable architectural features, environmentally friendly building products, energy-efficient systems, and environmentally-sensitive construction practices.
| Nov 29, 2011
SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China
Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.
| Nov 22, 2011
Jones Lang LaSalle completes construction of two new stores in Manhattan
Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.
| Oct 24, 2011
BBS Architects & Engineers receives 2011 Sustainable Design Award from AIA Long Island Chapter
AIA LI also recognized BBS with the 2011 ARCHI Award Commendation for the St. Charles Resurrection Cemetery St. Charles Resurrection Cemetery Welcoming and Information Center in Farmingdale, NY.