flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska will provide embodied carbon assessments on all new projects over 53,000 sf

Codes and Standards

Skanska will provide embodied carbon assessments on all new projects over 53,000 sf

Will use the Embodied Carbon in Construction Calculator it helped create.


By Peter Fabris, Contributing Editor | November 17, 2021
CO2

Courtesy Pixabay

Skanska USA Building will provide initial embodied carbon assessments on every new construction project it works on greater than 5,000m3 (53,000 sf).

The company will use the Embodied Carbon in Construction Calculator (EC3), a product it co-created with industry partners. Skanska USA Building has been piloting EC3 in partnership with Skanska Commercial Development in the U.S. since 2019.

“The data and tools provided by Skanska’s evaluations provide customers with actionable information to make significant and lasting choices about reducing carbon on their projects,” said Paul Hewins, president & CEO, Skanska USA Building. “Customers have the power to positively affect the supply chain if they choose to invest in full or partial materials tracking and reporting.”

Use of the EC3 tool over the last two years has shown that a 30% reduction in embodied carbon is typically achievable for little or no cost, Skanska says. Skanska recently partnered with the Rocky Mountain Institute on a study that produced similar results.

EC3 is available free and open source at www.buildingtransparency.org.

Related Stories

Codes and Standards | Aug 11, 2021

Decentralized approach to codes means emissions reduction responsibility falls on local officials

Efficiency advocates focusing more on local code amendments.

Digital Twin | Aug 9, 2021

Digital Twin Maturity white paper offers guidance on digital twin adoption

Provides lifecycle map and an approach for incorporating digital twins.

Codes and Standards | Aug 5, 2021

Contractors can be liable for building failures many years after project completion

Personal injury suits could be brought decades after substantial completion.

Codes and Standards | Aug 4, 2021

Mass timber is a natural choice for building recycling through deconstruction

Designing wood buildings to optimize recovery of materials for disassembly aids carbon sequestration.

Codes and Standards | Aug 3, 2021

Dept. of Energy releases initial version of the Spawn of EnergyPlus software

Targets new use cases in advanced controls, district systems, and grid integration.

Codes and Standards | Aug 2, 2021

Several U.S. cities among most expensive places to build in the world

San Francisco, New York, and Boston head the domestic list.

Codes and Standards | Jul 28, 2021

American Concrete Institute creates new director of innovative concrete technology post

Aim is to attract emerging technologies for development.

Codes and Standards | Jul 28, 2021

Higher ed faces infrastructure backlog of $112.3 billion

Study recommends integrated strategic planning for best results.

Codes and Standards | Jul 27, 2021

Add a wobbly moon to flooding risk factors

Earth satellite’s orbit variations will lead to sunny-day flooding in the mid-2030s.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021