flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skender, Z Modular reach agreement to fabricate multifamily housing components

Building Tech

Skender, Z Modular reach agreement to fabricate multifamily housing components

Factory to open soon on the southwest side of Chicago.


By Peter Fabris, Contributing Editor | April 19, 2019
Skender, Z Modular reach agreement to fabricate multifamily housing components

Skender, a design, construction, and manufacturing firm, will use Z Modular’s self-bracing structural VectorBloc system to fabricate building components. Photos courtesy Skender and Z Modular

Skender and Z Modular have signed an agreement to manufacture multifamily housing components in a factory on the southwest side of Chicago.

Skender, a design, construction, and manufacturing firm, will use Z Modular’s self-bracing structural VectorBloc system to fabricate building components. The aim is to produce “high-quality, multi-story modular housing that addresses a critical affordable housing need in Chicago,” according to a Skender news release.

“Our goal is to revolutionize the delivery of multifamily, hospitality and healthcare projects through modular manufacturing,” said Pete Murray, president, Skender Manufacturing. The VectorBloc steel modular construction system provides “exceptionally tight tolerances to ensure even stacking of the modules, which leads to structurally sound whole buildings,” the news release says.

The fabrication process allows the design flexibility to create a variety of building formats, Skender says. Skender will manufacture three-flat and mid-rise workforce housing buildings, among other applications.

 

Related Stories

Smart Buildings | Nov 20, 2020

The Weekly show: SPIRE smart building rating system, and pickleball court design tips

The November 19 episode of BD+C's The Weekly is available for viewing on demand.

AEC Tech | Oct 28, 2020

Meet Jaibot, Hilti's new construction robot

The semi-autonomous robot is designed to assist MEP contractors with ceiling-drilling applications. 

Smart Buildings | Oct 26, 2020

World’s first smart building assessment and rating program released

The SPIRE Smart Building Program will help building owners and operators make better investment decisions, improve tenant satisfaction, and increase asset value.

Building Tech | Jun 16, 2020

thyssenkrupp Elevator launches forward-looking technologies for a more comfortable and secure mobility experience

To ensure peace of mind for passengers, the company is focusing on three pillars: hygiene, social distancing and touchless technologies.

Healthcare Facilities | Mar 9, 2020

Mobile wayfinding platform helps patients, visitors navigate convoluted health campuses

Gozio Health uses a robot to roam hospital campuses to capture data and create detailed maps of the building spaces and campus.

University Buildings | Mar 9, 2020

Auburn University, Robins & Morton open Construction Field Laboratory

Robins & Morton and Auburn University’s College of Architecture, Design and Construction (CADC) recently celebrated the dedication of the Robins & Morton Construction Field Laboratory.

Green | Mar 9, 2020

BuroHappold commits to all new building projects achieving net-zero carbon by 2030

The engineering firm also launched a long-term partnership with ILFI.

Modular Building | Feb 16, 2020

On the West Coast, prefab gains ground for speedier construction

Gensler has been working with component supplier Clark Pacific on several projects.

AEC Tech | Feb 13, 2020

Exclusive research: Download the final report for BD+C's Giants 300 Technology and Innovation Study

This survey of 130 of the nation's largest architecture, engineering, and construction firms tracks the state of AEC technology adoption and innovation initiatives at the AEC Giants.

AEC Tech | Jan 16, 2020

EC firms with a clear ‘digital roadmap’ should excel in 2020

Deloitte, in new report, lays out a risk mitigation strategy that relies on tech.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021