flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Slight increase in nonres construction spending expected in 2012, growth projected for 2013

Slight increase in nonres construction spending expected in 2012, growth projected for 2013

Commercial sector expected to lead real estate recovery.


By By BD+C Staff | February 6, 2012
This article first appeared in the March 2012 issue of BD+C.

Despite the lingering effects of an over-built housing market, the continued difficulty to obtain financing for real estate projects, budget shortfalls at state and municipal governments and the anxiety surrounding the prolonged European debt crisis, there are signs that the U.S. design and construction industry will be improving.

Corporate profits have returned to pre-recession levels and businesses have subsequently been increasing their capital spending, borrowing costs are at record low levels and pent up demand for commercial and retail projects factors into what projects to be a 2.1% rise in spending this year for nonresidential construction projects.

The American Institute of Architects (AIA) semi-annual Consensus Construction Forecast, a survey of the nation’s leading construction forecasters, also projects a 6.4% increase of spending in 2013. 

“Spending on hotels, industrial plants and commercial properties are going to set the pace for the construction industry over the next two years,” said AIA Chief Economist, Kermit Baker, PhD, Hon. AIA. “The institutional market won’t experience the same growth, but healthcare facilities and places of worship are poised for a positive economic outlook in that sector.”

Market Segment Consensus Growth Forecasts                     

2012               

2013

Overall nonresidential                                                          

2.1%              

6.4%

Commercial / industrial                                                       

5.6%              

11.4%

Hotels                                                                        

10.2% 

19.7%

Industrial                                                                    

6.0%   

10.2%

Retail                                                                          

5.0%   

9.9%

Office buildings                                                         

4.3%   

9.6%

Institutional                                                                          

-0.1% 

3.6%

Religious                                                                   

5.1%   

6.3%

Healthcare facilities                                                  

4.5%   

5.3%

Amusement / recreation                                             

0.2%   

6.5%

Education                                                                   

-1.7%  

3.1%

Public safety                                                             

-3.8%  

0.3%

Remarking on what could derail a positive turnaround, Baker added, “We are concerned that the unusually high energy costs, given the overall weakness in the economy, might trigger a jolt in inflation and hamstring economic recovery.  The housing market also needs prices to stabilize and to resolve the high number of delinquencies and foreclosures before it can fully recover.” BD+C

Related Stories

| Aug 11, 2010

Burwell Architects, Ziegler Cooper Architects announce merger

Ziegler Cooper Architects is pleased to announce that Burwell Architects has merged into the Corporate Interior Studio of Ziegler Cooper Architects. We believe the new relationship will enhance and expand the services we can provide to our clients.

| Aug 11, 2010

BE&K Building Group, Turner, BRPH awarded Boeing 787 Dreamliner assembly plant project

A joint venture of the BE&K Building Group and Turner Construction (BE&K | Turner), with design partner BRPH, has been awarded the design-build contract for design and construction of The Boeing Company’s new 787 Dreamliner final assembly plant in North Charleston, South Carolina.

| Aug 11, 2010

Sustainable Buildings as Teaching Tools: 4 Strategies for Integrating Buildings into Experiential Learning

4 Strategies for Integrating Buildings into Experiential Learning

| Aug 11, 2010

Using physical mockups to identify curtain wall design flaws

Part two of a five-part series on diagnosing and avoiding cladding, glazing, and roofing failures from building forensics expert IBA Consultants.

| Aug 11, 2010

Morphosis builds 'floating' house for Brad Pitt's Make It Right New Orleans foundation

Morphosis Architects, under the direction of renowned architect and UCLA professor Thom Mayne, has completed the first floating house permitted in the U.S. for Brad Pitt’s Make It Right Foundation in New Orleans.The FLOAT House is a new model for flood-safe, affordable, and sustainable housing that is designed to float securely with rising water levels.

| Aug 11, 2010

Turner edges out Perkins+Will for the top spot on BD+C's Top 200 Building Team LEED APs ranking

With 1,006 LEED Accredited Professionals on staff, Turner Construction took the top spot on Building Design+Construction’s 2009 ranking of AEC firms with the most LEED APs, published as part of the Giants 300 report. Turner added more than 580 LEED APs during the past year to surpass Perkins+Will, which held the top spot four years running.

| Aug 11, 2010

BIG's 'folded façade' design takes first-prize in competition for China energy company headquarters

Copenhagen-based architect BIG, in collaboration with ARUP and Transsolar, was awarded first-prize in an international competition to design Shenzhen International Energy Mansion, the regional headquarters for the Shenzhen Energy Company.

| Aug 11, 2010

Guggenheim and Google team up on shelter design competition

The Solomon R. Guggenheim Museum and Google yesterday announced the launch of Design It: Shelter Competition, a global, online initiative that invites the public to use Google Earth and Google SketchUp to create and submit designs for virtual 3-D shelters for a location of their choice anywhere on Earth. The competition opened on June 8, 2009, in honor of Frank Lloyd Wright’s birthday, and closes to submissions on August 23.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021