flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Slight increase in nonres construction spending expected in 2012, growth projected for 2013

Slight increase in nonres construction spending expected in 2012, growth projected for 2013

Commercial sector expected to lead real estate recovery.


By By BD+C Staff | February 6, 2012
This article first appeared in the March 2012 issue of BD+C.

Despite the lingering effects of an over-built housing market, the continued difficulty to obtain financing for real estate projects, budget shortfalls at state and municipal governments and the anxiety surrounding the prolonged European debt crisis, there are signs that the U.S. design and construction industry will be improving.

Corporate profits have returned to pre-recession levels and businesses have subsequently been increasing their capital spending, borrowing costs are at record low levels and pent up demand for commercial and retail projects factors into what projects to be a 2.1% rise in spending this year for nonresidential construction projects.

The American Institute of Architects (AIA) semi-annual Consensus Construction Forecast, a survey of the nation’s leading construction forecasters, also projects a 6.4% increase of spending in 2013. 

“Spending on hotels, industrial plants and commercial properties are going to set the pace for the construction industry over the next two years,” said AIA Chief Economist, Kermit Baker, PhD, Hon. AIA. “The institutional market won’t experience the same growth, but healthcare facilities and places of worship are poised for a positive economic outlook in that sector.”

Market Segment Consensus Growth Forecasts                     

2012               

2013

Overall nonresidential                                                          

2.1%              

6.4%

Commercial / industrial                                                       

5.6%              

11.4%

Hotels                                                                        

10.2% 

19.7%

Industrial                                                                    

6.0%   

10.2%

Retail                                                                          

5.0%   

9.9%

Office buildings                                                         

4.3%   

9.6%

Institutional                                                                          

-0.1% 

3.6%

Religious                                                                   

5.1%   

6.3%

Healthcare facilities                                                  

4.5%   

5.3%

Amusement / recreation                                             

0.2%   

6.5%

Education                                                                   

-1.7%  

3.1%

Public safety                                                             

-3.8%  

0.3%

Remarking on what could derail a positive turnaround, Baker added, “We are concerned that the unusually high energy costs, given the overall weakness in the economy, might trigger a jolt in inflation and hamstring economic recovery.  The housing market also needs prices to stabilize and to resolve the high number of delinquencies and foreclosures before it can fully recover.” BD+C

Related Stories

| Aug 11, 2010

Gensler, HOK, HDR among the nation's leading reconstruction design firms, according to BD+C's Giants 300 report

A ranking of the Top 100 Reconstruction Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Gensler, Arup, HOK among the largest office sector design firms

A ranking of the Top 100 Office Design firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Callison strengthens retail design presence with RYA acquisition

Callison LLC on June 1 acquired RYA Design Consultancy, a Dallas-based retail architecture and design firm with offices in New York City. The new “Callison RYA Studio” will merge staff and clients into Callison ’s existing retail practice at their Dallas and New York offices.

| Aug 11, 2010

Prism-shaped design unveiled for five-star hotel in Saudi Arabia

Goettsch Partners has been commissioned by Saudi Oger Ltd. to design a new five-star, 214-key business hotel in the King Abdullah Financial District in Riyadh, Saudi Arabia. As a design-build assignment, Saudi Oger is serving as the contractor, selected by developer Rayadah Investment Company. The project is sited on Parcel 1.08, one of the first 10 parcels currently under development in the massive new master-planned district.

| Aug 11, 2010

Construction Specifications Institute to end support of MasterFormat 95 on December 31, 2009

The Construction Specifications Institute (CSI) announced that the organization will cease to license and support MasterFormat 95 as of December 31, 2009. The CSI Board of Directors voted to stop licensing and supporting MasterFormat 95 during its June 16, 2009, meeting at the CSI Annual Convention in Indianapolis.

| Aug 11, 2010

Gensler among eight teams named finalists in 'classroom of the future' design competition

Eight teams were recognized today as finalists of the 2009 Open Architecture Challenge: Classroom. Finalists submitted designs ranging from an outdoor classroom for children in inner-city Chicago, learning spaces for the children of salt pan workers in India, safe spaces for youth in Bogota, Colombia and a bamboo classroom in the Himalayan mountains.

| Aug 11, 2010

F&S Partners merges with SmithGroup

F&S Partners, a Dallas architecture firm specializing in the design of educational, recreational, and religious projects, has merged with SmithGroup, a top 10 U.S. architecture/engineering firm. The 40-person office in Dallas will carry the name SmithGroup/F&S.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021