flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Smart windows installed at NREL

Smart windows installed at NREL


By By BD+C Staff | September 23, 2011
The self-tinting heat-activated filter allows solar heat into the building when it is desired, such as on a sunny winter day.

The installation of RavenWindow smart window technology was recently completed at the U.S. Department of Energy’s Research Support Facility (RSF) on the campus of the National Renewable Energy Laboratory (NREL).
The self-tinting heat-activated filter allows solar heat into the building when it is desired, such as on a sunny winter day. Then, it blocks the sun when it’s not desired, such as on a hot summer day. Unlike window blinds, when the window is in the tinted state and blocking solar heat from entering the building, the occupants still can see outside and enjoy the view. Because of the energy savings, reduced glare and increased occupant comfort provided by managing the solar heat gain, the window swill also be installed at the RSF expansion wing, to be completed in late 2011.
“We are very pleased to have concluded the first ever installation of RavenWindow technology, and we could not have asked for a better first customer,” said Alex Burney, CEO of RavenBrick LLC.
“By adopting RavenWindow in this prestigious building, DOE and NREL have made a significant contribution to the creation of vital jobs in the clean-tech economy. This is an encouraging example of the merits of public and private sector partnership,” added Burney. BD+C

Related Stories

| May 1, 2012

Construction is underway on MLK ambulatory care center in L.A.

Featuring a variety of sustainable features, the new facility is designed to achieve LEED Gold Certification.

| Apr 30, 2012

Summit Design + Build completes build-out for Office Concepts

The project is seeking LEED ID Silver certification from the U.S. Green Building Council.

| Apr 30, 2012

KBE Building completes renovation at the ConnCAT

The $1.2 million project consisted of a 16,000-sf interior renovation.

| Apr 27, 2012

China Mobile selects Leo A Daly to design three buildings at its new HQ

LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.

| Apr 26, 2012

Gensler's Leiserowitz: Employs holistic philosophy to foster clients' creativity, comfort

Leiserowitz became regional managing principal in Chicago for San Francisco-based architecture and design giant Gensler a little more than a year ago.

| Apr 25, 2012

Thornton Tomasetti/Fore Solutions provides consulting for Biologics Support Center

Project receives LEED Gold Certification.

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

| Apr 24, 2012

Roofing Supply Group acquired by Clayton, Dubilier & Rice

RSG provides a complete offering of residential and commercial roofing materials and related supplies.

| Apr 24, 2012

McLennan named Ashoka Fellow

McLennan was recognized for his work on the Living Building Challenge.

| Apr 24, 2012

AECOM design and engineering team realizes NASA vision for Sustainability Base

LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.

boombox1
boombox2
native1

More In Category


AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021