flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Smyrna Ready Mix’s new office HQ mimics the patterns in the company’s onsite stone quarry

Office Buildings

Smyrna Ready Mix’s new office HQ mimics the patterns in the company’s onsite stone quarry

The five-story, 85,000-sf Nashville building draws design inspiration from the concrete company’s materials and processes.


By Novid Parsi, Contributing Editor | February 12, 2023
Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects
All photos courtesy EOA Architects

In 1999, Tennessee concrete company Smyrna Ready Mix started off with just three trucks. Since then, it has grown to 5,400 employees in 16 states. Last year, the company moved from its small office in downtown Nashville to its new corporate headquarters on an 800-acre site. 

Designed by EOA Architects to showcase various concrete processes and applications, the five-story, 85,000-sf building’s vertical layering mimics the patterns in the company’s stone quarry, located on the opposite end of the campus site. The building’s glass and concrete bands are meant to mirror the quarry’s natural contours and striations. 

Inside, the helix of the building’s circulation patterns draws inspiration from the shape of a concrete mixing truck drum. Exposed concrete walls extend unobstructed from the first through fifth floors. The shear wall, the elevator, and the stair cores are 18-inch-thick poured walls with a custom radius, minimizing the amount of finishing work needed post-pour.

The interior design also references the company’s brand and industry. Custom-designed light fixtures echo the forms of concrete drums. The steps’ curved underside nods to the supply chutes used to pour concrete from the mixing drum. In the training room, the wet bar’s backsplash has been made with repurposed test cylinders, which are used to determine the strength of a mixed concrete batch. Furniture and textiles incorporate the red, white, and blue colors of the company’s logo.

The project also features corporate amenities for onsite staff and drivers, including dining, a fitness facility, training and community rooms, and a daycare center for 100 of the company and community’s children. Future plans for the campus include walking paths.

On the Building Team:
Owner: SRM Concrete
Design architect: EOA Architects
Architect of record: EOA Architects
MEP engineer: I.C. Thomasson Associates
Structural engineer: EMC Structural Engineers
General contractor/construction manager: DPR Construction

Here is the design statement from EOA Architects:
Smyrna Ready Mix is a family-owned and operated concrete company founded in Smyrna, Tennessee in 1999. Beginning with only three trucks, the company has grown to 5,400 employees in 16 states. This dramatic expansion meant it was time to move from a cramped office in downtown Nashville to a new corporate headquarters on an 800-acre site near an interstate interchange just south of the city. Here, the new building will help anchor a new mixed-use development, provide a landmark for a new corporate campus and help definite this gateway to the town of Smyrna.

Office Building as Billboard

Designed to showcase the varied types of concrete processes and applications, the vertical layering of the five-story building mimics the rhythms found in the company’s stone quarry, also located on the site. The building profile rises at the opposite end the site from the sunken quarry, creating an inverse relationship that guides the design. The building’s floor plate pushes and pulls to create an organic form with glass and concrete bands mirroring the quarry’s natural contours and striations. 

Full glazing takes advantage of surrounding views and showcases the structural components, including numerous types of concrete and finishing styles. Slender 16-inch diameter columns made of a high-strength concrete mix balance on elegant bases tapered to 10 inches at the first floor and do the work of a typical 24-inch column. Cantilevered post-tension slabs demonstrate the material’s sculptural possibilities. The building contains no 90-degree edges; everything is rounded, creating a dynamic flow that further reinforces concrete’s versatility.  

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Workplace design uses lightness, movement

EOA steered away from a brutalist concrete expression to emphasize light and lightness and create a warm and welcoming environment. Users enter the building through three large concrete fins that provide the framework for the entry vestibules. The lobby floor is a custom concrete mix developed by EOA and SRM that resembles terrazzo. The lobby’s material palate adds a vertical oak motif complemented by  champagne colored metal ceilings and railings. A double cantilevered concrete stair anchored in front of the exposed double-height concrete shear wall cascades gracefully into the lobby space, establishing the sense of open movement that permeates the building.

Inspired by the shape of a concrete mixing truck drum, the design incorporates an internal helix into the building’s circulation patterns. Vertical circulation is highlighted through the use of exposed concrete walls that extend unobstructed from the first through fifth floors. The shear wall, as well as the elevator and stair cores are 18-inch-thick poured walls with a custom radius to soften the edges and minimize the amount of finishing work required post-pour. These elements were left in a natural sculptural state with only a matte finish sealer applied to allow the form-work joints to cast shadows as sunlight moves through the space. 

Artful connections to the company's brand and industry infuse the interiors: Custom designed light fixtures echo the forms of concrete drums.  The curved underside of the monumental steps is a nod to the supply chutes used to pour concrete from the mixing drum. In the training room, test cylinders, used to determine the strength of each mixed concrete batch, were cut and re-purposed as the backsplash of the training room wet bar. Furniture and textiles subtly incorporate the red, white and blue colors of the company's logo.

Office building supports family business, community vision

The family had a specific and progressive vision for its new home. It was important to them to invite the community into the building and onto the campus,  which includes a historic community cemetery. Future plans include walking paths to create a larger, healthy holistic environment. The project also prioritized unprecedented corporate amenities for both on-site staff as well as drivers: the first floor includes on-site dining, a fitness facility, training and community rooms as well as a daycare center for 100 of the company and community’s children. 

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

 

 

 

 

 

 

 

 

Related Stories

| Jul 1, 2013

LEGOLAND builds 12-foot replica of One World Trade Center

The LEGOLAND Discovery Center Westchester in Yonkers, N.Y., celebrated the completion of a LEGO replica of One World Trade Center by lighting the 12-foot-tall, 100-pound model.

| Jul 1, 2013

Report: Global construction market to reach $15 trillion by 2025

A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.

| Jun 28, 2013

Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report

A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals. 

| Jun 18, 2013

Report: HVAC occupancy sensors could slash building energy demand by 18%

Researchers at the DOE's Pacific Northwest National Laboratory conclude that significant energy savings can be achieved by varying ventilation levels based on the number of people in a given space.

| Jun 17, 2013

First look: Austin to get first high-rise since 2003

Developer Cousins Properties broke ground on the 29-story Colorado Tower in downtown Austin, Texas, the city's first high-rise building since Cousins' completed the Frost Bank Tower a decade ago.

| Jun 17, 2013

DOE launches database on energy performance of 60,000 buildings

The Energy Department today launched a new Buildings Performance Database, the largest free, publicly available database of residential and commercial building energy performance information.

| Jun 13, 2013

7 great places that represent excellence in environmental design

An adaptive reuse to create LEED Platinum offices, a park that honors veterans, and a grand national plaza are among the seven projects named winners of the 2013 Great Places Awards. The Environmental Design and Research Association  recognize professional and scholarly excellence in environmental design, with special attention paid to the relationship between physical form and human activity or experience.

| Jun 12, 2013

5 building projects that put the 'team' in teamwork

The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team. 

| Jun 11, 2013

Finnish elevator technology could facilitate supertall building design

KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.

| Jun 6, 2013

Get smart about space utilization in the workplace

As we continue to look for more effective ways to improve the overall workplace experience, one tool we can use is measuring and analyzing space utilization.

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021