flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Soccer Field in the Sky

Sponsored Content Sports and Recreational Facilities

Soccer Field in the Sky

House of Sports in Ardsley, N.Y., is home to a soccer field on the third floor of a downtown building.  


By Star Building Systems | December 14, 2015

The little town of Ardsley, N.Y. has a soccer field where you’d least expect it – on the third floor of a downtown building.

The House of Sports is a private sports training facility located conveniently between two major highways in this suburb of New York City. The ground floor is a parking garage. The second floor has a series of four full-size regulation basketball courts ganged up side by side. The top floor includes an 80-yard long turf-covered indoor soccer field.

The building is a hybrid of two types of construction. The lower two stories are framed in structural steel; in fact, the steel has been made part of the interior architecture. Exposed-steel columns and massive X-bracing separate the basketball courts. The top story is a 120-foot clear span metal building system from Star Buildings Systems.  It is 260 feet long, allowing for the 80-yard long soccer/baseball field.

 

 

The project was constructed as a design and build by Star builder Schlosser Steel Buildings of Hatfield, PA, who contracted directly with the owner for structural steel, precast concrete and the erected metal building system. The owner’s agent, indoor recreational consultant, Norm Gill, of Pinnacle Indoor Sports, developed the concept for the building. Working with architect Michael Hughes, AIA of Mann-Hughes Architecture, Doylestown, PA, and Philadelphia-based structural engineer O'Donnell and Naccarato, they created a 120,000 sf recreation and training facility, the largest single building, under one roof, in the New York metropolitan area. 

There was previously a warehouse on the site. Two bays of it were kept and incorporated in the new facility, fitted out as training and food service areas.  The rest of the warehouse was demolished.  New piles were sunk into the ground and the recreational facility was built from the ground up. Actual building time was 8 months.

The ground floor parking area is blacktop on grade.  Precast concrete plank floor decks support the “floating” wood basketball floors on the second story and the 2-inch thick turf field on the top story.  The upper floor is 45 feet above grade.  The entire building is clad and roofed with metal panels.

Despite the apparent complexity of the structure, building it presented very few challenges, according to Schlosser Steel Vice President Jonathan Trumbore.  The metal building system on the third story imposed unusual horizontal loads at floor level, but they were easily handled by designing 1-½” steel rods under the soccer field floor, tying the bases of the columns together.

 

 

The only real construction challenges were from the weather and the location.  Beginning construction in winter meant drilling for piles and concreting in cold weather, with the usual difficulties. 

The location was demanding, though. “It was a very tight site,” explains Trumbore.  “There’s a street right alongside.  It had to be shut down to set the cranes in the road to erect the steel.”  They worked closely with the town of Ardsley to coordinate operations, with tight schedules on when they could work. “Local police were very cooperative,” and they were able to keep things moving despite the restrictions.

The result is a facility that, in the two years since it opened, has become a major sports force in the community.  The generous space and top-notch facilities have made it a home to the region’s leading basketball, lacrosse, and baseball academies, where over 2000 athletes train on a weekly basis.  In addition, it offers holiday and summer sports camps, adult soccer and baseball leagues, and adult fitness programs.

 

Related Stories

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Sports and Recreational Facilities | May 17, 2021

Indoor volleyball and basketball complex set for St. Louis

The project will be the largest youth volleyball and basketball facility in St. Louis.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021