flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Some AEC firms are plugging into EV charging market

Industrial Facilities

Some AEC firms are plugging into EV charging market

Decentralized access is broadening recharger installation to several building types.


By John Caulfield, Senior Editor | November 14, 2023
One of Blink Charging's 3,500 charging stations. The company has seen sizable revenue gains from commercial, governmental, and residential clients.  Image credit: Blink Charging
Blink Charging, one of the nation's largest EV charger providers, is helping multifamily developers decide how many chargers they need to install now and in the future to meet growing demand. Image credit: Blink Charging

Despite the recent decisions by leading automakers, in response to demand shifts, to temporarily slow their production of electric vehicles, the federal government remains committed to the electrification of transportation, and some AEC firms have been exploring avenues to capitalize on this market sector’s expansion.

Through the first half of 2023, sales of electric vehicles in the U.S. rose by 49 percent compared to the same period a year earlier. But that increase compared unfavorably to the 63% gain in calendar year 2022. Carmakers like Ford, General Motors, and Tesla have announced they were curtailing or delaying production of certain EV models during this period of what one sector analyst referred to as “growing pains.”

This market’s perceived uncertainty hasn’t tempered the Biden Administration’s support of electric vehicles as part of its larger strategy to reduce carbon emissions. The White House foresees a national network of 500,000 EV chargers nationwide, in anticipation that electric vehicle sales will rise to at least half of all new car purchases by 2030. Year-to-date EV sales through September reached just over 873,000 and were on track this month to surpass 1 million units for a year for the first time ever.

Some AEC firms are jumping on this bandwagon proactively.

Full service charging stations, in design and construction

The engineering firm Kimley-Horn recently launched TREDLite EV, a software solution for retail chains and local governments to select the best locations for their new EV chargers. Kimley-Horn also partnered with Drive Electric Tennessee, an awareness and implementation program that in September released its “Multifamily Electric Vehicle Charging Infrastructure Guide,” for developers and occupants who wish to install chargers.

Driver SPG, a division of the general contractor C.W. Driver Companies, is building what will be the first full-service electric vehicle charging station for Rove Charging, which plans to open 20 locations by 2026. The first station, on 1.2 acres in Santa Ana, Calif., is slated to open next summer. Designed by Peruzzi Architects, the station will be able to recharge 40 vehicles simultaneously via high-powered fast chargers. The station will include an on-site market operated by Gelson’s Markets, restrooms, and free Wi-Fi for customers who use the station’s lounge and outdoor patio. Some Rove stations will offer a car wash.

Rendering of full service EV charging station for Rove Charging
Driver SPG is building Rove Charging's first full-service EV charging station. Image credit: Peruzzi Architects

 

The Santa Ana station will be able to generate renewable energy through on-site solar panels and battery storage that supplements the city’s electric grid.

Last month, The Chicago Athenaeum and The European Center for Architecture Art Design and Urban Studies bestowed its International Architecture Award on The Sunflower Station, an EV station of the future designed by Beijing-based Sanyou Architectural Design and commissioned by the fuel distributor and retailer Parkland Corporation, which is based in oil-rich Calgary, Alberta, and has operations in 25 countries. This station design—which reimagines a typical highway gas station as a recharging oasis—has 24 EV charging spaces, and other areas where drivers and passengers can rest, watch movies, or meditate. The design also featues solar panels and a rainwater collection system.  

Recharging everywhere

The number of EV chargers continues to proliferate. Earlier this month, EVgo, one of the nation’s largest public fast-charging networks, revealed that it would start using a prefabricated approach that cuts the install time for fast chargers in half and reduces construction costs by an average of 15 percent.

EV chargers in general are more likely to be installed in parking lots of shopping centers than within dedicated standalone structures a la gas stations. An EV station concept study that Gensler and BMW Designworks conducted a few years ago has yet to find a willing adopter, confirms a Gensler spokesperson. The developers behind the Stack Charge EV station concept, who previously stated their plans to open 10 stations in Southern California by the end of 2023, now say their first station with 40 fast chargers, in Baker, Calif., between Los Angeles and Las Vegas, will open early next year.

“As the country transitions to electric vehicles, it is moving to a distributed fueling model, where a vehicle can be recharged at the gym, at the supermarket, or on roadways like gas stations,” says Mike Battaglia, COO of Blink Charging, one of the country’s leading EV charging providers, with more than 3,500 charging locations and nearly 12,000 connectors.

He says that Tesla has done a good job expanding its network of supercharging stations, of which it has nearly 2,000 with close to 22,000 supercharger ports, according to Department of Energy estimates. But Battaglia cautions that DC fast charging stations are expensive, which makes calculating the return on investment for such projects dicier.

While Blink also wants a bigger piece of the fast-charger pie, it is targeting the multifamily sector for installation of level 2 charging equipment, whose cost is a fraction of DC fast chargers, and offers higher-rate AC charging through 240-volt electrical service for residential applications, and 208-volt service for commercial applications. Level 2 chargers can charge an EV to 80 percent from empty in four to 10 hours, and a plug-in hybrid in one to two hours, according to the U.S. Department of Transportation estimates.

Citing research by McKinsey and other sources, Battaglia says that, despite all the media hype around fast chargers, 90 percent of all kilowatt hours of electricity dispensed for EV charging will come through level 2 equipment. And more multifamily developers are interested in installing EV chargers as a competitive amenity that meets growing tenant demand.

For multifamily clients, Blink conducts a site assessment to determine the number of stations needed and whether the building has sufficient electrical service. Battaglia says that, on average, a multifamily complex would require one charger per five to seven EVs on site. Level 2 charging equipment costs between $5,000 and $6,000 per unit, and another $8,000 and $20,000 to install.

The biggest driver of cost is the distance separating the building’s electrical panel from its bank of EV chargers. That’s why Blink advises its multifamily clients, when choosing the location for chargers, to plan ahead for the likelihood of increased demand. Blink will  soon offer a dual-point charging station that can recharge any electric vehicle including Tesla’s, whose charging standard has been embraced by several carmakers.

  A customer using a Blink Charging charging station
Blink Charging is advising its multifamily clients thinking of installing EV charger banks to plan ahead for future tenant demand. Image credit: Blink Charging

Production slowdown an aberration

The publicly owned Blink Charging reported a 151 percent increase in revenue, to $97.9 million, for the nine months ending September 30. The company expects to be earnings-per-share positive by December 2024, says Battaglia.

Blink recently signed a seven-year agreement to become the official EV charging provider for the city of Miami Beach, its headquarters city. Blink is also partnering with the connected car and parking service provider Parkopedia to integrate more than 4,000 EV chargers onto Parkopedia’s platform in North America, giving its subscribers access to Blink’s charger network. Blink’s products are now prioritized by the state of Utah for government, nonprofit, K-12, and higher education agencies. The company is also the EV charging supplier for the Tennessee Valley Authority to provide charging solutions for public and commercial fleet applications.

Blink emphasizes its flexibility. It will be adopting Tesla’s charging standard and incorporating plug-and-charge technology that simplifies the payment process for EV drivers. Blink also provides energy management services.

Battaglia isn’t too worried about slowdowns in EV production, which he sees as a temporary aberration. “Look, electric vehicles are now 7.7 percent of car sales, and were 25 percent [of sales] in California” in the first half of 2023. “We never thought this was going to be a linear rocket ship.”

Related Stories

Industrial Facilities | May 31, 2023

Nascent cowarehousing firm steps forward with facilities that offer a communal user experience

The design firm Ware Malcomb has partnered with FlexHQ, a Los Angeles-based firm offering cowarehouse leasing solutions, to create a scalable workspace that emphasizes leasing flexibility and higher-quality and environmentally friendlier amenities than aren’t commonly found in this building type, say representatives from both companies.

Multifamily Housing | May 12, 2023

An industrial ‘eyesore’ is getting new life as an apartment complex

The project, in Metuchen, N.J., includes significant improvements to a nearby wildlife preserve.

Industrial Facilities | Apr 10, 2023

Implementing human-centric design in operations and maintenance facilities

Stantec's Ryan Odell suggests using the human experience to advance OMSF design that puts a focus on wellness and efficiency.

Warehouses | Mar 29, 2023

Construction completed on Canada’s first multi-story distribution center

Construction was recently completed on Canada’s first major multi-story industrial project, a distribution center in Burnaby, British Columbia. The project provides infrastructure for last-mile delivery in a world where consumers have come to expect next-day and same-day delivery, according to Ware Malcomb, the project's architect of record.

Industrial Facilities | Mar 6, 2023

The largest planned logistics and business park in North America gets under way in Southern California

The $25 billion World Logistics Center will boost the supply chain capabilities of Southern California and will serve as a distribution center for destinations across the continent.

Intelligent Lighting | Feb 13, 2023

Exploring intelligent lighting usage in healthcare, commercial facilities

SSR's Todd Herrmann, PE, LEEP AP, explains intelligent lighting's potential use cases in healthcare facilities and more.

Giants 400 | Feb 9, 2023

New Giants 400 download: Get the complete at-a-glance 2022 Giants 400 rankings in Excel

See how your architecture, engineering, or construction firm stacks up against the nation's AEC Giants. For more than 45 years, the editors of Building Design+Construction have surveyed the largest AEC firms in the U.S./Canada to create the annual Giants 400 report. This year, a record 519 firms participated in the Giants 400 report. The final report includes 137 rankings across 25 building sectors and specialty categories.   

Giants 400 | Feb 6, 2023

2022 Telecommunications Facility Sector Giants: Top architecture, engineering, and construction firms in the U.S. telecommunications facility sector

AECOM, Alfa Tech, Kraus-Anderson, and Stantec head BD+C's rankings of the nation's largest telecommunications facility sector architecture, engineering, and construction firms, as reported in the 2022 Giants 400 Report.

Industrial Facilities | Dec 21, 2022

New York City’s largest industrial building is nearing completion

The multistory facility is arriving at a time when space remains at a premium.

Adaptive Reuse | Dec 21, 2022

University of Pittsburgh reinvents century-old Model-T building as a life sciences research facility

After opening earlier this year, The Assembly recently achieved LEED Gold certification, aligning with the school’s and community’s larger sustainability efforts.

boombox1
boombox2
native1

More In Category


Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021