Spanning three floors of a high rise in San Francisco, this 40,000-sf headquarters for one of the oldest social-services organizations in California represents the latest in design, technology, and training for blind and low-vision individuals. The space encompasses optometry exam rooms, a retail store showcasing adaptive technology devices, training rooms for hands-on learning of Braille and adaptive technology, a training kitchen, and 11 dorm rooms where up to 29 clients can stay onsite for immersive training.
The project team developed subtle design features to ensure the spaces function well for everyone. Wayfinding is aided by a ring of polished concrete encircling the public areas on each floor, while open spaces are defined by metal floor transition strips to give an indication of spatial demarcation to cane users. In training rooms, bold-colored felt-wrapped acoustic panels are used because rich, saturated colors can be discerned by many with low vision.
The design team even converted its drawings into tactile prints with raised line work to make them legible for blind stakeholders.
Building Team – Submitting firm, architect Mark Cavagnero Associates Owner LightHouse for the Blind and Visually Impaired Structural engineer Murphy Burr Curry MEP engineer Glumac General contractor DPR
General Information – Size 2,600 sf Construction cost Withheld at owner’s request Construction time February 2016 to May 2016 Delivery method Design-build
Related Stories
| Aug 29, 2022
Montana becomes first U.S. state to approve 3D printing in construction
Montana is the first U.S. state to give broad regulatory approval for 3D printing in building construction.
Architects | Apr 22, 2022
Top 10 green building projects for 2022
The American Institute of Architects' Committee on the Environment (COTE) has announced its COTE Top Ten Awards for significant achievements in advancing climate action.
Concrete Technology | Apr 19, 2022
SGH’s Applied Science & Research Center achieves ISO 17025 accreditation for concrete testing procedures
Simpson Gumpertz & Heger’s (SGH) Applied Science & Research Center recently received ISO/IEC17025 accreditation from the American Association for Laboratory Accreditation (A2LA) for several concrete testing methods.
2021 Building Team Awards | Jan 14, 2022
First public-private partnership project in Veterans Administration history saves $34 million in costs
LEO A DALY and McCarthy Building Companies head the project team for the Omaha VA Ambulatory Care Center in BD+C’s 2021 Building Team Awards.
Building Team Awards | Dec 8, 2021
A performing arts center celebrates a legendary rocker and his birthplace
Buddy Holly Hall in Texas receives BD+C’s Silver Building Team Award.
Building Team Awards | Dec 7, 2021
A rapid response to a health emergency
Baptist Hospital of Miami’s 233-bed Hope Tower receives BD+C’s Bronze Building Team Award
Building Team Awards | Dec 3, 2021
Putting science on display, thanks to a design-build approach
UC Riverside’s Plant Growth Environments Facility receives BD+C’s Bronze Building Team Award.
Building Team Awards | Dec 2, 2021
An academic ‘precinct’ brings arts and sciences together
Wofford College’s Chandler Center for Environmental Studies receives BD+C’s Silver Building Team Award.
Building Team Awards | Dec 1, 2021
Denver sets the bar for water reclamation and reuse
A new administration building for the city’s water utility company scores Platinum in BD+C’s 2021 Building Team Awards.
2021 Building Team Awards | Nov 17, 2021
Caltech's new neuroscience building unites scientists, engineers to master the human brain
The Tianqiao and Chrissy Chen Institute for Neuroscience at the California Institute of Technology in Pasadena wins a Gold Award in BD+C's 2021 Building Team Awards.