The Fenestration and Glazing Industry Alliance (FGIA) released an updated version of a document pertaining to roller assemblies, with or without height adjustment features, for use in sliding doors and lift and slide doors.
AAMA 906-21, Specification for Sliding Door and Lift and Slide Roller Assemblies, was last updated in 2018. “The AAMA 906 task group made quick work of an important update to capture a market trend toward heavy sliding doors,” said Matt Taylor (HOPPE North America), co-chair of the FGIA Heavy Duty Roller Assembly Task Group.
“Previous requirements for operating force considered rollers with rated weight capacities to 100 pounds,” Taylor said. “Now, roller assemblies ranging from weight capacities of 75 pounds to more than 600 pounds will be tested to proportionate levels of operating force.”
Under the updated specification, representative samples of door rollers are evaluated for performance at the weight rating specified by the roller manufacturer by cycling the rollers under load for 10,000 cycles. Clearance and operating force measurements are taken before and after the cycle test to ensure performance remains within specified tolerances.
Related Stories
Codes and Standards | Mar 4, 2021
Biden administration overturns Trump’s federal building design mandate
Previous order promoted classical and “traditional” architecture above others.
Codes and Standards | Mar 3, 2021
Texas freeze raises questions about risks of electrifying buildings
Gas stoves helped residents cook, boil water when power went out.
Codes and Standards | Mar 2, 2021
New Seattle building code eliminates fossil fuels for most space and water heating
Also increases on-site solar photovoltaics, reduces envelope heat loss, air leakage, and interior lighting power allowances.
Codes and Standards | Feb 25, 2021
It’s not just lumber—roofing material prices are also on the rise
Lower demand for petroleum products means less asphalt production.
Codes and Standards | Feb 23, 2021
USGBC offers education on LEED Safety First pilot credits
Four courses address COVID-19.
Codes and Standards | Feb 23, 2021
ASHRAE Epidemic Task Force releases updated Building Readiness Guide
Includes flush calculations to reduce time and energy to clear contaminants between occupancy periods.
Codes and Standards | Feb 22, 2021
Preservation of Affordable Housing develops climate resilience strategy
Includes backup power for resident and staff “area of refuge”.
Codes and Standards | Feb 18, 2021
Construction industry moves toward comprehensive U.S. BIM standard
NIBS hosts roundtable to create coordinated program to advance collaboration.
Codes and Standards | Feb 17, 2021
Construction on international sports venues is ripe for corruption
Poor planning, complex contracting, a lack of accountability and high levels of collusion to blame.
Codes and Standards | Feb 16, 2021
Feds may fund removal of some urban highways
Senate bill proposes pilot program to reknit communities.